Summary: In this paper, a procedure for analysis and calculation of basic statistics in structural equation modeling is given. This research gains greater insight into the benefits of structural modeling in surface water quality. The... more
Geologic conditions and design requirements around upstream Nachtigal Falls, in Cameroon, for the hydroelectric construction project on the Sanaga River dictated close control of blasting procedures with very precise geometry to obtain... more
In recent years, the development of the mining industry in the Republic of Kazakhstan has been accompanied by the commissioning of new underground levels for many existing mineral deposits, which were initially developed through open-pit... more
RESUMEN: Este artículo analiza la viabilidad, planeamiento y diseño de una nueva explotación a cielo abierto de carbón en la mina La Margarita S.A., con recursos carboníferos superficiales calculados en 440.139,7 ton. Se logró... more
This course provides an introduction to the geological resources of mining, covering the initial phases from prospecting to general exploration, detailed exploration, development, and production stages. The Mining Geology Course aims to... more
10%, postiglo povećanje vrednosti NPV za 24,77%, a optimizacijom graničnog sadržaja metala u rudi dodatno povećanje vrednosti NPV za 10,07%. Ukupno povećanje vrednosti NPV iznosi 37,34%, što je značajno poboljšanje ukupnih ekonomskih... more
Construction Development of Dropping Draining Technologies with Differential Circulation Energy Mash
Purpose. The main purpose of the presented research is to improve the technology of rock destruction by explosion. For this purpose, new methods for creating a differentiated stressed state of a rock massif as well as for constructing... more
In order to improve conveying and crusher throughput performance, major open pit mines are increasingly using high energy blasting. Strict and effective controlled blasting methods are required to protect the integrity of the pit walls... more
Increasing the diameter of drill holes is an option to increase the tonnage in open-pit mines. This explains the appearance of unexpected disorders during drilling and blasting, the consequences of which classically take the form of both... more
The purpose of this research is to use back analysis for mine waste dump slope stability and to determine the causes of the landslides that occured. The research method that we use is the Limit Equilibrium Method and Probabilistic... more
The purpose of this research is to use back analysis for mine waste dump slope stability and to determine the causes of the landslides that occured. The research method that we use is the Limit Equilibrium Method and Probabilistic... more
In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to... more
Rock slope faces typically comprise assemblages of benches intended to catch dislodged rock debris, channel groundwater and rainfall runoff along slope faces, and flatten overall slopes to design angles. Excavation of neat design-width... more
Rock slope faces typically comprise assemblages of benches intended to catch dislodged rock debris, channel groundwater and rainfall runoff along slope faces, and flatten overall slopes to design angles. Excavation of neat design-width... more
With the application of contour blasting's, we manage to make the cutting of the rock mass in the designed line, forming safe benches and slopes, which can resist for a very long time without collapsing and changing their shape. The... more
Criteria or transition indicators to guide the complex decision problem of open pit to underground (OP-UG) transition are currently not well defined and documented as most mines rely on context-dependent experiences of their respective... more
Stability of waste dump is now gaining importance due to increasing depth and size of mine. Management of dump nearby mining areas is one of the most critical and crucial task for mine management due to limited land and other governing... more
In opencast mining operation, the stability of waste materials stands at high priority from the safety and economic perspective. Poor management of overburden (OB) dump results the instability of slope in an opencast mine. The present... more
Increasing the diameter of drill holes is an option to increase the tonnage in open-pit mines. This explains the appearance of unexpected disorders during drilling and blasting, the consequences of which classically take the form of both... more
This article involves wall control techniques, drilling practices that may lead to over break, causes of over break, and guidelines for presplitting which is the main wall control technique of discussion and possible solutions to the... more
In opencast mining operation, the stability of waste materials stands at high priority from the safety and economic perspective. Poor management of overburden (OB) dump results the instability of slope in an opencast mine. The present... more
The aim of this study is to predict the peak particle velocity (PPV) values from both presently constructed simple regression model and fuzzy-based model. For this purpose, vibrations induced by bench blasting operations were measured in... more
A rock drilling system always responds to variations in the mechanical properties of the penetrated rock mass. Combining the drill response with a detailed understanding of the drill system has the potential to give a detailed and... more
In the Rembas mine pits, the coal exploitation lasts for more than one century. During this period, most of coal reserves have been mined, so there is a need for introduction the new and modern technical solutions, which will enable... more
The purpose of this study is to identify the leading causes of slope instability along a local highway in Anhui, People’s Republic of China. As part of the east expansion project, the mountain range will be excavated to create a two-way,... more
h i g h l i g h t s UPSH allows storing (and producing) large amounts of energy in flat regions. UPSH plants interact with the surrounding porous media exchanging water. Water exchanges influence the head difference between reservoirs.... more
Shaft sinking is one of the main parts in underground mine planning. Shaft has various applications in underground mines e.g. minerals exiting flow, gases entrance or exit way, stope developments for exploitation etc. Considering that... more
Himalayas is one of most seismically active mountain chain in the world. Landsides and the mass wasting are a prevalent phenomenon in this region. There are a considerable number of human populations living in the hilly regions which are... more
RESUMEN: La detección de microsismos debidos al movimiento de los planos de falla en un llenado artificial no es proceso trivial ni sencillo. En este trabajo se presenta una nueva metodología de detección de posibles microsismos (sismos... more
Purpose.Development of a new procedure for calculating the density of emulsion explosives (EE), that will allow determining the detonation velocity along the charging length, depending on the inclination of boreholes during ore breaking.... more
This research work assessed the Drilling and Blasting Techniques at the Granite Quarry of AFDIN Construction Company Limited, Katsina State, Nigeria. The objectives of the study were to identify drilling and blasting equipment, find out... more
Failure of overburden dumps is a common problem among major opencast mines across the world. In recent years, as technology advanced, the production capacity of opencast mines increased exponentially, resulting in large overburden dumps... more
Ground strata failure is a major hazard for open pit mines as it has the potential to cause damage to property and can result in multiple fatalities. Slope stability radar (SSR) systems are used to continuously monitor pit walls and they... more
This handbook provides simplified cost models for evaluating underground mines. Regression analysis is used to generate capital and operating cost equations for each model in the form Y = AX B , where Y is the cost estimated and X is the... more
This paper determines the possible modes of slope failure, and the effect of increasing the slope angle of the Amoanda East Pit Wall of Abosso Gold Fields Limited, Damang Mine by 5 o and 10 o from 70 o because the designed slope angle (70... more
This research study focuses on creating a drill pattern for the Condestable mine, which will allow us to assess the percentage of dilution. For these purposes, we used the Pearse formula proposed in 1955, which allowed us to find the... more
The correct choice of the method of mining is of great importance, because it has a great impact on the total costs in the exploitation of mineral resources. The basic methodology for numerical ranking of mining excavation methods is the... more
Pump storage hydroelectricity is an efficient way to temporarily store energy. This technique requires to store temporarily a large volume of water in an upper reservoir, and to release it through turbines to the lower reservoir, to... more
Mining is a global activity which is carried out in order to extract valuable metalliferous and nonmetalliferous materials from the earth that are processed and used in our day to day life. In mining, proper rock fragmentation is... more
The slope stability of the Itakpe Iron Ore Mine has been carried out using computer software, ROCKPACK III. One hundred and twenty three dip and dip direction values were obtained using compass clinometer. The Itakpe Iron Ore Mine was... more
During this paper, in order to identify the priority of consideration between the problems of "mining method selection" and "determining transition depth from open-pit to underground mining" an accurate procedure is introduced step by... more
Shallow ore deposits are mined by surface methods but a depth is reached in the case of most deposits after which underground methods are applied for the extraction of the remaining ore. The determination of this depth and its analysis is... more
cOnTROL Of denSITy And VeLOcITy Of eMULSIOn eXpLOSIVeS deTOnATIOn fOR ORe bReAKIng purpose. Development of a new procedure for calculating the density of emulsion explosives (EE), that will allow determining the detonation velocity along... more
In India, majority of coal demand is met by opencast mining production. The continuously increasing demand of coal has led to rapid opencast mining activities with high stripping ratio of 1:12 to 1:15, in turn requiring large quantities... more
In the Rembas mine pits, the coal exploitation lasts for more than one century. During this period, most of coal reserves have been mined, so there is a need for introduction the new and modern technical solutions, which will enable... more
Stability of rock cut slopes depends upon the type of material, discontinuity attributes and geometry present in any location. Although, gravity remains the constant important factor in dictating the slope failure but other parameters... more
Since 2001, the Hybrid Stress Blast Model (HSBM) project members have developed a software suite to model the complete blasting process from non-ideal detonation to muck pile formation. To preserve the physics and improve solution time,... more