Academia.eduAcademia.edu

Annual Cost of Reducing lkg of CO2 of Sample Beneficiaries of Chief Minister Solar Power Scheme in Kanniyakumari District   The study found the hypothesis results, the respondents are not satisfied Operation and Maintenance work for Solar power panel. So, the correlation results are there is a no relationship between O&M and Satisfaction of the respondents. That means out of 230 sample 93.5 % call for that service 42.6 % respondents disagree the service, 29.6 moderate, 26.5 strongly dissatisfied the study. So, the researcher strongly rejects the null hypothesis accepted the alternative hypothesis.

Table 11 Annual Cost of Reducing lkg of CO2 of Sample Beneficiaries of Chief Minister Solar Power Scheme in Kanniyakumari District The study found the hypothesis results, the respondents are not satisfied Operation and Maintenance work for Solar power panel. So, the correlation results are there is a no relationship between O&M and Satisfaction of the respondents. That means out of 230 sample 93.5 % call for that service 42.6 % respondents disagree the service, 29.6 moderate, 26.5 strongly dissatisfied the study. So, the researcher strongly rejects the null hypothesis accepted the alternative hypothesis.