JP2003150224A - System and method for automatically grasping man-hour - Google Patents
System and method for automatically grasping man-hourInfo
- Publication number
- JP2003150224A JP2003150224A JP2001352053A JP2001352053A JP2003150224A JP 2003150224 A JP2003150224 A JP 2003150224A JP 2001352053 A JP2001352053 A JP 2001352053A JP 2001352053 A JP2001352053 A JP 2001352053A JP 2003150224 A JP2003150224 A JP 2003150224A
- Authority
- JP
- Japan
- Prior art keywords
- work
- worker
- control device
- identification data
- content
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims description 30
- 238000013459 approach Methods 0.000 claims description 7
- 238000003860 storage Methods 0.000 description 15
- 238000010586 diagram Methods 0.000 description 8
- 238000003825 pressing Methods 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 230000005672 electromagnetic field Effects 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 230000010365 information processing Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、工数自動把握シス
テムに関し、特に、タグを用いて作業時の工数を自動的
に把握するシステムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for automatically grasping man-hours, and more particularly to a system for automatically grasping man-hours during work using tags.
【0002】[0002]
【従来の技術】作業現場と管理部門とにある情報端末を
通信ネットワークで接続し、工場内の生産状況をリアル
タイムで管理部門にて把握する生産時点情報収集(PO
P)システムが知られている。このシステムでは、作業
現場である工場と、管理部門である事務所とに設置され
た情報端末が、通信ネットワークケーブル(LAN)で
接続されている。そして、作業者が工場内の情報端末へ
作業の進行状況を入力することにより、事務所の管理者
は生産状況をリアルタイムで情報を収集し、監視するこ
とができる。2. Description of the Related Art Information terminals at a work site and a management department are connected by a communication network to collect production time information (PO) for grasping the production situation in a factory in real time by the management department.
P) systems are known. In this system, information terminals installed in a factory, which is a work site, and an office, which is a management department, are connected by a communication network cable (LAN). Then, when the worker inputs the progress status of the work to the information terminal in the factory, the manager of the office can collect and monitor the production status in real time.
【0003】しかし、このPOPシステムでは、作業者
は、作業の進行状況を示す情報を、工場に設置された情
報端末に入力しなければならない。入力作業は、キーボ
ードやバーコード、マウス等の機器を用いることにより
行なう。このため、データ入力作業の煩わしさにより、
データ入力を後回しにする場合も多い。そうなると、複
数の作業の終了後に、まとめて入力したり、最悪の場
合、入力を忘れることも起こり得る。すなわち、作業者
がリアルタイムに情報を入力しないため、情報が不足し
ている場合や、リアルタイム性が無い場合が発生するこ
とが多い。However, in this POP system, a worker must input information indicating the progress of work to an information terminal installed in a factory. Input work is performed by using a device such as a keyboard, a bar code, or a mouse. Therefore, due to the troublesomeness of data input work,
Data entry is often postponed. Then, after the completion of a plurality of operations, it is possible to input the data collectively or, in the worst case, to forget the input. That is, since the worker does not input the information in real time, there are many cases where the information is insufficient or there is no real time property.
【0004】データ入力の作業を容易に行なうことが出
来る、作業状況を把握するためのシステムが望まれてい
る。作業者の負担の少ない、作業状況を把握するための
システムが望まれている。また、リアルタイムで作業状
況を把握することが可能なシステムが求められている。There is a demand for a system for grasping the work status, which enables easy data input work. There is a demand for a system for grasping the work status that is less burdensome for workers. There is also a demand for a system capable of grasping the work status in real time.
【0005】[0005]
【発明が解決しようとする課題】従って、本発明の目的
は、作業者に対する負担が少なく、データ入力の作業も
容易に行なうことが可能な作業状況を把握するための工
数自動把握システム及び工数自動把握方法を提供するこ
とである。また、本発明の他の目的は、リアルタイムで
各作業者の作業の状況を把握することが可能な工数自動
把握システム及び工数自動把握方法を提供することであ
る。SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a man-hour automatic grasping system and a man-hour automatic grasping system for grasping a work situation in which the burden on the worker is small and data input work can be easily performed. It is to provide a grasp method. Another object of the present invention is to provide an automatic man-hour grasping system and a man-hour automatic grasping method capable of grasping the work status of each worker in real time.
【0006】[0006]
【課題を解決するための手段】以下に、[発明の実施の
形態]で使用される番号・符号を用いて、課題を解決す
るための手段を説明する。これらの番号・符号は、[特
許請求の範囲]の記載と[発明の実施の形態]との対応
関係を明らかにするために付加されたものである。ただ
し、それらの番号・符号を、[特許請求の範囲]に記載
されている発明の技術的範囲の解釈に用いてはならな
い。[Means for Solving the Problems] Means for solving the problems will be described below by using the numbers and symbols used in the embodiments of the present invention. These numbers and signs are added to clarify the correspondence between the description of [Claims] and the [Embodiment of the Invention]. However, those numbers and signs should not be used for the interpretation of the technical scope of the invention described in [Claims].
【0007】従って、上記課題を解決するために、本発
明の工数自動把握システムは、作業者(5)に装着さ
れ、作業者(5)を識別する識別データ(14)を発信
するタグ(4)と、タグ(4)が受信可能領域に進入し
たとき、タグ(4)から識別データ(14)を受信する
アンテナ(3)と、受信された識別データ(14)に基
づいて、作業者(5)の行なう作業の作業内容(16)
と、作業者(5)を表す名称(15)とを表示する現場
制御装置(2)とを具備する。Therefore, in order to solve the above problems, the automatic manhour grasping system of the present invention is attached to a worker (5) and transmits a tag (4) for transmitting identification data (14) for identifying the worker (5). ), And when the tag (4) enters the receivable area, the operator (3) receives the identification data (14) from the tag (4) and the worker () based on the received identification data (14). Work content of work performed in 5) (16)
And a site control device (2) for displaying a name (15) representing the worker (5).
【0008】現場制御装置(2)に表示される内容にお
いて、作業者(5)を表す名称(15)は、本人を識別
可能な情報であれば良い。識別データ(14)を表示す
ることも可能である。In the content displayed on the site control device (2), the name (15) representing the worker (5) may be any information that can identify the person. It is also possible to display the identification data (14).
【0009】また、本発明の工数自動把握システムは、
識別データ(14)に基づいて、作業内容(16)と作
業者(5)を表す名称(15)とを出力する主制御装置
(1)とを更に具備する。そして、現場制御装置(2)
は、受信された識別データ(14)を主制御装置(1)
へ出力し、主制御装置(1)から出力された作業内容
(16)と名称(15)とを表示する。Further, the man-hour automatic grasping system of the present invention is
It further comprises a main controller (1) that outputs a work content (16) and a name (15) representing a worker (5) based on the identification data (14). And on-site control device (2)
Receives the identification data (14) received by the main controller (1)
The work content (16) and the name (15) output from the main controller (1) are displayed.
【0010】また、本発明の工数自動把握システムは、
現場制御装置(2)が、時計を有する。現場制御装置
(2)は、作業者(5)の行なう作業の開始を示す開始
操作に基づいて、その時計によりその作業の開始時刻
(17)を確定し、開始時刻(17)を主制御装置
(1)へ出力する。そして、主制御装置(1)は、開始
時刻(17)を、作業内容(16)と識別データ(1
4)と共に作業実績テーブル(19’)として保持す
る。なお、現場制御装置(2)は、開始時刻(17)を
表示することが望ましい。Further, the man-hour automatic grasping system of the present invention is
The field controller (2) has a clock. The site control device (2) determines the start time (17) of the work by the clock based on the start operation indicating the start of the work performed by the worker (5), and sets the start time (17) to the main control device. Output to (1). Then, the main controller (1) sets the start time (17) as the work content (16) and the identification data (1).
It is held together with 4) as a work record table (19 '). The on-site control device (2) preferably displays the start time (17).
【0011】更に、本発明の工数自動把握システムは、
現場制御装置(2)が、作業者(5)の行なう作業の終
了を示す終了操作に基づいて、その時計によりその作業
の終了時刻(18)を確定し、終了時刻(18)を主制
御装置(1)へ出力する。そして、主制御装置(1)
は、終了時刻(18)を、作業実績テーブル(19’)
へ保持する。なお、現場制御装置(2)は、開始時刻
(17)を表示することが望ましい。Further, the man-hour automatic grasping system of the present invention is
The site control device (2) determines the end time (18) of the work by the clock based on the end operation indicating the end of the work performed by the worker (5), and sets the end time (18) to the main control device. Output to (1). And the main controller (1)
Shows the end time (18) as the work record table (19 ')
Hold to. The on-site control device (2) preferably displays the start time (17).
【0012】更に、本発明の工数自動把握システムは、
主制御装置(1)が、時計を有する。現場制御装置
(2)は、作業者(5)の行なう作業の開始を示す開始
操作に基づいて、その開始操作を示す第1信号を主制御
装置(1)へ出力する。そして、主制御装置(1)は、
その第1信号に基づいて、その時計によりその作業の開
始時刻(17)を確定し、開始時刻(17)を、作業内
容(16)と識別データ(14)と共に作業実績テーブ
ル(19’)として保持し、開始時刻(17)を現場制
御装置(2)へ出力する。現場制御装置(2)は、開始
時刻(17)を表示する。Furthermore, the man-hour automatic grasping system of the present invention is
The main controller (1) has a clock. The site control device (2) outputs a first signal indicating the start operation to the main control device (1) based on the start operation indicating the start of the work performed by the worker (5). And the main controller (1)
Based on the first signal, the start time (17) of the work is determined by the clock, and the start time (17) is set as a work record table (19 ') together with the work content (16) and the identification data (14). Hold and output the start time (17) to the site controller (2). The site controller (2) displays the start time (17).
【0013】更に、本発明の工数自動把握システムは、
現場制御装置(2)が、作業者(5)の行なう作業の終
了を示す終了操作に基づいて、その終了操作を示す第2
信号を主制御装置(1)へ出力する。そして、主制御装
置(1)は、その第2信号に基づいて、その時計により
その作業の終了時刻(18)を確定し、終了時刻(1
8)を、作業実績テーブル(19’)へ保持し、終了時
刻(18)を現場制御装置(2)へ出力する。現場制御
装置(2)は、終了時刻(18)を表示する。Furthermore, the man-hour automatic grasping system of the present invention is
The field control device (2) indicates, based on an end operation indicating the end of the work performed by the worker (5), a second operation indicating the end operation.
The signal is output to the main controller (1). Then, the main control device (1) determines the end time (18) of the work by the clock based on the second signal, and the end time (1
8) is stored in the work record table (19 '), and the end time (18) is output to the site control device (2). The site controller (2) displays the end time (18).
【0014】更に、本発明の工数自動把握システムは、
現場制御装置(2)が、アンテナ(3)に識別データ
(14)が受信されたとき、現場制御装置(2)の操作
装置の一部を、作業者(5)による一動作により、その
開始操作及びその終了操作の内の少なくとも一方の入力
を可能な状態にする。Furthermore, the man-hour automatic grasping system of the present invention is
When the identification data (14) is received by the antenna (3), the site control device (2) starts a part of the operating device of the site control device (2) by one operation of the worker (5). At least one of the operation and the ending operation is enabled.
【0015】作業者(5)は、作業開始前、現場制御装
置(2)へ向かい、現場制御装置(2)に表示された内
容を確認後、開始操作(ボタン操作のような一動作)を
行なう。作業終了後、現場制御装置(2)へ向かい、現
場制御装置(2)に表示された内容を確認後、終了操作
(ボタン操作のような一動作)を行なう。すなわち、作
業者の実質的な動作は、作業開始前及び作業終了後に、
それぞれ一動作で済む。Before starting the work, the worker (5) heads to the site control device (2), confirms the contents displayed on the site control device (2), and then performs a start operation (one operation such as button operation). To do. After the work is completed, the operator goes to the site control device (2), confirms the contents displayed on the site control device (2), and then performs a termination operation (one operation such as button operation). That is, the substantial motion of the worker is
Only one operation is required for each.
【0016】上記課題を解決するために、本発明の工数
自動把握方法は、タグ(4)を装着する作業者(5)が
第1表示画面(12)に接近したとき、タグ(4)の発
する作業者(5)を識別する識別データ(14)を受信
するステップと、受信した識別データ(14)に基づい
て、作業者(5)の行なう作業の作業内容(16)と作
業者(5)を表す名称(15)とを、識別データ(1
4)と作業内容(16)と名称(15)との対応を示す
作業内容データベース(13’)において検索するステ
ップと、作業内容データベース(13’)での検索結果
に基づいて、作業内容(16)と名称(15)とを第1
表示画面(12)に表示するステップと、作業者(5)
の行なう作業の開始を示す開始操作に基づいて、作業の
開始時刻(17)を確定するステップと、開始時刻(1
7)を、第1表示画面(12)に表示するステップと、
開始時刻(17)を、作業内容(16)と識別データ
(14)と共に作業実績テーブル(19’)として保持
するステップと、第1表示画面(12)に表示された情
報を一時的に保持するステップとを具備する。In order to solve the above-mentioned problems, the method for automatically grasping man-hours of the present invention is such that when the worker (5) wearing the tag (4) approaches the first display screen (12), the tag (4) The step of receiving the identification data (14) for identifying the worker (5) to be issued, and the work content (16) of the work performed by the worker (5) and the worker (5) based on the received identification data (14). ) And the identification data (1
4), the work content (16) and the name (15), and the work content database (13 ') showing the correspondence and the work content (16') based on the search result in the work content database (13 '). ) And name (15) first
Steps to be displayed on the display screen (12) and workers (5)
Based on the start operation indicating the start of the work to be performed by the start step (17), and the start time (1
7) is displayed on the first display screen (12),
A step of holding the start time (17) together with the work content (16) and the identification data (14) as a work record table (19 '), and temporarily holding the information displayed on the first display screen (12). And steps.
【0017】また、本発明の工数自動把握方法は、作業
者(5)が再度第1表示画面(12)に接近したとき、
タグ(4)の発する作業者(5)を識別する識別データ
(14)を受信するステップと、受信した識別データ
(14)に基づいて、作業内容(16)と名称(15)
とを、その一時的に保持された情報から検索するステッ
プと、その情報での検索結果に基づいて、作業内容(1
6)と名称(15)とを第1表示画面(12)に表示す
るステップと、作業者(5)の行なう作業の終了を示す
終了操作に基づいて、その作業の終了時刻(18)を確
定するステップと、終了時刻(18)を、第1表示画面
(12)に表示するステップと、終了時刻(18)を、
作業実績テーブル(19’)に保持するステップとを更
に具備する。Further, according to the method for automatically grasping man-hours of the present invention, when the worker (5) approaches the first display screen (12) again,
Based on the step of receiving the identification data (14) for identifying the worker (5) emitted by the tag (4) and the received identification data (14), the work content (16) and the name (15)
Based on the step of searching for and from the temporarily stored information, and the work content (1
6) and the name (15) are displayed on the first display screen (12), and the end time (18) of the work is determined based on the end operation indicating the end of the work performed by the worker (5). The step of displaying the end time (18) on the first display screen (12) and the end time (18)
And a step of holding the work record table (19 ′).
【0018】上記課題を解決するために、本発明に関わ
るプログラムは、タグ(4)を装着した作業者(5)が
第1表示画面(12)に接近したとき、受信されたタグ
(4)の発する作業者(5)を識別する識別データ(1
4)に基づいて、作業者(5)の行なう作業の作業内容
(16)と作業者(5)を表す名称(15)とを、識別
データ(14)と作業内容(16)と名称(15)との
対応を示す作業内容データベース(13’)において検
索するステップと、その検索結果に基づいて、作業内容
(16)と名称(15)とを第1表示画面(12)に表
示するステップとを具備する方法をコンピュータに実行
させる。In order to solve the above problem, the program according to the present invention is such that the tag (4) received when the worker (5) wearing the tag (4) approaches the first display screen (12). Identification data (1) for identifying the worker (5)
4), the work content (16) of the work performed by the worker (5) and the name (15) representing the worker (5) are identified by the identification data (14), the work content (16) and the name (15). ) In the work content database (13 ′) showing the correspondence with each other, and displaying the work content (16) and the name (15) on the first display screen (12) based on the search result. Causing a computer to execute a method comprising:
【0019】更に、本発明に関わるプログラムは、作業
者(5)の行なう作業の開始を示す開始操作に基づい
て、その作業の開始時刻(17)を確定するステップ
と、開始時刻(17)を、作業内容(16)と識別デー
タ(14)と共に作業実績テーブル(19’)として保
持させるステップと、作業者(5)の行なう作業の終了
を示す終了操作に基づいて、作業の終了時刻(18)を
確定するステップと、終了時刻(18)を、作業内容
(16)と識別データ(14)と共に作業実績テーブル
(19’)に保持させるステップとを更に具備する上記
の方法をコンピュータに実行させる。Further, the program according to the present invention determines the start time (17) of the work based on the start operation indicating the start of the work performed by the worker (5) and the start time (17). Based on the step of holding the work content (16) and the identification data (14) as a work record table (19 ′) and the end operation indicating the end of the work performed by the worker (5), the work end time (18 ) Is determined, and the end time (18) is stored in the work record table (19 ′) together with the work content (16) and the identification data (14), thereby causing the computer to execute the above method. .
【0020】上記の工数自動把握方法及びプログラム
は、矛盾の発生しない範囲で、各ステップ間の順番の入
替えが可能である。The above-described man-hour automatic grasping method and program can change the order of the steps within a range in which no contradiction occurs.
【0021】[0021]
【発明の実施の形態】以下、本発明である工数自動把握
システム及び工数自動把握方法の実施の形態に関して、
添付図面を参照して説明する。なお、各実施の形態にお
いて同一又は相当部分には同一の符号を付して説明す
る。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the man-hour automatic grasping system and the man-hour automatic grasping method according to the present invention will be described below.
Description will be given with reference to the accompanying drawings. Note that the same or corresponding portions in the respective embodiments will be described with the same reference numerals.
【0022】図1は、本発明である工数自動把握システ
ム及び工数自動把握方法装置の実施の形態における構成
を示す図である。工数自動把握システムは、事務所7に
属する主制御装置1、工場8に属する現場制御装置2及
びIDタグアンテナ3、作業者5に属するIDタグ4、
ネットワーク6とを具備する。FIG. 1 is a diagram showing the configuration of an embodiment of an automatic manhour grasping system and an automatic manhour grasping method apparatus according to the present invention. The man-hour automatic grasping system includes a main controller 1 belonging to an office 7, a site controller 2 belonging to a factory 8 and an ID tag antenna 3, an ID tag 4 belonging to a worker 5,
And a network 6.
【0023】本発明の工数自動把握システムは、IDタ
グを有する作業者がIDタグアンテナの受信可能範囲に
入ることにより、作業者を自動的に認識する。そして、
そのIDに該当する作業者の作業内容をデータベースか
ら自動的に読み出し、工場内のIDタグアンテナの近傍
にある表示部に表示する。作業者5は、表示された作業
内容を確認し、作業開始ボタンを押した後、作業現場に
向かい作業を開始する。作業終了後は、同様にして、表
示部の作業終了ボタンを押す。The man-hour automatic grasping system of the present invention automatically recognizes a worker having an ID tag when the worker is within the receivable range of the ID tag antenna. And
The work content of the worker corresponding to the ID is automatically read from the database and displayed on the display unit near the ID tag antenna in the factory. The worker 5 confirms the displayed work content and, after pressing the work start button, heads to the work site and starts work. After finishing the work, press the work end button on the display in the same manner.
【0024】上記プロセスでは、作業者が単に表示部の
近傍に行くだけで、自分の作業内容が自動的に表示され
る。従って、作業者には、自分の行なう作業を検索する
などの手間が一切掛からない。そして、作業者が単に作
業開始ボタンを押すだけで、作業開始が認識され、作業
開始時刻が自動的に入力される。作業終了後は、同様に
して、単に作業終了ボタンを押すだけで、作業終了が認
識され、作業終了時刻が自動的に入力される。従って、
作業者には、複数のキー操作等の入力を行なう必要が無
く、煩わしさがほとんど無い。すなわち、作業者に対す
る負担が少なく、データ入力の作業もほとんど無く且つ
容易に行なうことが可能である。In the above process, the worker's work contents are automatically displayed when the worker simply goes near the display section. Therefore, the worker does not have to take any trouble such as searching for the work to be performed. Then, the worker simply presses the work start button, the work start is recognized, and the work start time is automatically input. After the work is finished, the work finish is recognized and the work finish time is automatically input by simply pressing the work finish button. Therefore,
The operator does not need to input a plurality of key operations and the like, and there is little trouble. That is, the burden on the operator is small, and the data input operation can be performed easily with almost no data input operation.
【0025】また、上記プロセスでは、システム側は、
作業者を自動的に認識し、その作業者の行なう作業内容
(データベースより)、作業開始時刻、作業終了時刻を
確実に把握することが出来る。すなわち、リアルタイム
で各作業者の作業内容およびその進行状況を把握するこ
とが可能である。In the above process, the system side
It is possible to automatically recognize the worker and surely grasp the work content (from the database) performed by the worker, the work start time, and the work end time. That is, it is possible to grasp the work content and progress of each worker in real time.
【0026】以下、図1の各構成について、詳細に説明
する。事務所7は、主制御装置1を有する。主制御装置
1等を用いて、作業工程管理などの事務管理業務を行な
う場所である。Hereinafter, each configuration of FIG. 1 will be described in detail. The office 7 has a main controller 1. This is a place where office work such as work process management is performed using the main control device 1 and the like.
【0027】主制御装置1は、ワークステーションに例
示される情報処理装置であり、事務所7に属している。
内部にデータベースを有し、作業者5、作業者ID及び
作業内容に関する情報を関連付けて保持している(後
述)。主制御装置1は、後述の現場制御装置2に含まれ
ていても良い。その場合には、事務所7における情報端
末と現場制御装置2とをネットワークで接続すること
で、同様に主制御装置1を制御できる。主制御装置1の
設置スペースを省略でき、また、装置コストも低減でき
る。また、主制御装置1は、1台につき、複数の現場制
御装置2を取り扱うことが可能である。The main controller 1 is an information processing device exemplified by a workstation and belongs to the office 7.
It has a database inside and holds the worker 5, the worker ID, and the information about the work contents in association with each other (described later). The main controller 1 may be included in a field controller 2 described later. In that case, the main control device 1 can be similarly controlled by connecting the information terminal in the office 7 and the on-site control device 2 via a network. The installation space for the main control device 1 can be omitted, and the device cost can be reduced. Further, the main control device 1 can handle a plurality of site control devices 2 per unit.
【0028】工場8は、現場制御装置2及びIDタグア
ンテナ3を有する。作業者5が、作業を行なう場所であ
る。現場制御装置2は、ワークステーションに例示され
る情報処理装置であり、工場7に属している。IDタグ
アンテナ3を制御する機器を備え、IDタグアンテナ3
の受信した作業者を識別する作業者IDに基づいて、各
種処理を実行する。また、内部に表示部を有し、そこに
作業者5の作業内容を表示する(後述)。現場制御装置
2は、事務所7内の主制御装置1に含まれていても良
い。その場合には、工場8における情報端末と主制御装
置1とをネットワークで接続することで、同様に現場制
御装置2を制御できる。現場制御装置2の設置スペース
を省略でき、また、装置コストも低減できる。ただし、
IDタグアンテナを制御する装置は、工場内に残す。現
場制御装置2は、工場内に複数設置しても良い。その場
合、作業現場近くの現場制御装置2で、入力処理が出
来、作業者5への負担が軽減される。The factory 8 has a field controller 2 and an ID tag antenna 3. This is a place where the worker 5 works. The field control device 2 is an information processing device exemplified by a workstation and belongs to the factory 7. A device for controlling the ID tag antenna 3 is provided, and the ID tag antenna 3
Various processes are executed based on the received worker ID for identifying the worker. In addition, it has a display unit inside and displays the work content of the worker 5 (described later). The site control device 2 may be included in the main control device 1 in the office 7. In that case, by connecting the information terminal in the factory 8 and the main control device 1 via a network, the on-site control device 2 can be similarly controlled. The installation space for the field control device 2 can be omitted, and the device cost can be reduced. However,
The device that controls the ID tag antenna remains in the factory. Plural site control devices 2 may be installed in the factory. In that case, the site control device 2 near the work site can perform input processing, and the burden on the worker 5 can be reduced.
【0029】IDタグアンテナ3は、現場制御装置2の
表示部の近傍において、IDタグ4(後述)の発信する
作業者識別用の作業者IDを受信可能なアンテナであ
る。また、現場制御装置2の表示部の近傍において、所
定の周波数の電磁フィールド(交流磁場)を発生するこ
とにより、IDタグ4に対して電磁誘導的に電力を供給
可能である。ただし、IDタグ4自身が電源(例示:電
池)を有している場合には、電磁フィールドを発生しな
い。現場制御装置2に接続しており、受信したID情報
を現場制御装置2へ出力する。The ID tag antenna 3 is an antenna capable of receiving a worker ID for worker identification transmitted by an ID tag 4 (described later) in the vicinity of the display section of the site control device 2. Further, by generating an electromagnetic field (AC magnetic field) having a predetermined frequency in the vicinity of the display unit of the field control device 2, it is possible to electromagnetically supply power to the ID tag 4. However, when the ID tag 4 itself has a power source (example: battery), no electromagnetic field is generated. It is connected to the site controller 2 and outputs the received ID information to the site controller 2.
【0030】作業者5は、IDタグ4(後述)を有す
る。工場8において、作業者5に予め設定された各種作
業を行なう。その際、各作業の開始と終了の時点で、I
Dタグアンテナ3の受信可能範囲に入り、現場制御装置
2の表示部に触れることにより、作業の開始時間及び終
了時間を入力する。The worker 5 has an ID tag 4 (described later). In the factory 8, various works preset by the worker 5 are performed. At that time, at the start and end of each work, I
By entering the receivable range of the D tag antenna 3 and touching the display unit of the site control device 2, the start time and the end time of the work are input.
【0031】IDタグ4は、RFID(Radio F
requency IDentification)タ
グやICカードに例示される無線タグであり、作業者5
に属する。作業者5の着用するヘルメットや作業服、安
全靴等に装着されている。IDタグ4は、作業者5を識
別する作業者IDを発信する。内部に電源を有していな
い場合には、IDタグアンテナ3からの電磁フィールド
により電力を供給され、それを用いて、作業者IDを発
する。The ID tag 4 is an RFID (Radio F
A wireless identification tag such as a frequency identification (RFID) tag or an IC card.
Belong to. It is attached to a helmet, work clothes, safety shoes, etc. worn by the worker 5. The ID tag 4 transmits a worker ID that identifies the worker 5. When the internal power source is not provided, electric power is supplied by the electromagnetic field from the ID tag antenna 3 and is used to emit a worker ID.
【0032】ネットワーク6は、社内LAN(Loca
l Area Network)に例示され、工場8や
事務所7の情報機器を相互に接続している。The network 6 is an in-house LAN (Local).
l Area Network), information devices of a factory 8 and an office 7 are connected to each other.
【0033】次に、主制御装置1を更に説明する。図2
は、主制御装置1を詳細に示している。主制御装置1
は、制御部11、表示部12、作業内容データベース1
3及び作業実績記憶部19を具備する。Next, the main controller 1 will be further described. Figure 2
Shows the main controller 1 in detail. Main controller 1
Is a control unit 11, a display unit 12, a work content database 1
3 and work record storage unit 19.
【0034】制御部11は、主制御装置1に属する。主
制御装置1の行う処理全般を制御する。例えば、作業者
IDに基づいて、作業者氏名、作業内容を、作業内容デ
ータベース13(後述)から検索し、作業者IDと共に
出力する。また、作業者の作業の開始時刻及び終了時刻
を受け取り、作業実績テーブル(後述)を作成する。The controller 11 belongs to the main controller 1. It controls overall processing performed by the main controller 1. For example, based on the worker ID, the worker name and the work content are searched from the work content database 13 (described later) and output together with the worker ID. Also, the start time and the end time of the work of the worker are received, and a work performance table (described later) is created.
【0035】表示部12は、主制御装置1に属する。作
業者管理部11の行なう処理の内容を表示する。また、
工場8における各作業者の作業状況をリアルタイムで表
示可能である。The display unit 12 belongs to the main controller 1. The content of the processing performed by the worker management unit 11 is displayed. Also,
The work status of each worker in the factory 8 can be displayed in real time.
【0036】作業内容データベース13は、主制御装置
1に属する。作業者を識別する作業者IDと作業に関す
る作業情報とを関連付けた作業内容テーブル13’を保
存している。詳細は後述する。The work content database 13 belongs to the main controller 1. A work content table 13 'in which a worker ID for identifying a worker and work information regarding work are associated is stored. Details will be described later.
【0037】作業実績記憶部19は、主制御装置1に属
する。作業の遂行と共に生成される作業者IDと、作業
情報と、作業の実績を示す作業実績情報とを関連付けた
作業実績テーブル19’を保存する。詳細は後述する。The work record storage unit 19 belongs to the main controller 1. A work record table 19 'is stored in which a worker ID generated as the work is performed, work information, and work record information indicating the record of work are associated with each other. Details will be described later.
【0038】ここで、作業内容データベース13を更に
説明する。図3は、作業内容データベース13に保持さ
れている作業内容テーブル13’を詳細に示している。
作業内容テーブル13’は、作業者ID14と作業情報
を対応付けている。作業情報は、作業者氏名15と作業
内容16とからなる。作業者ID14は、IDタグ4が
発する作業者5を識別する作業者IDである。作業者5
毎に異なり、作業者5一人について一つが割り当てられ
る。作業者IDは、従業員番号に例示される。作業者氏
名15は、作業者ID14の示す作業者5を表す名称で
ある。作業者氏名15は、作業者5の氏名に例示され
る。氏または名だけ、ニックネーム等でも良い。作業内
容16は、作業者ID14で示される、作業者5の行な
う1つ又は複数の作業内容である。全体の作業計画に基
づいて、作業者5毎に予め設定された内容が記されてい
る。作業内容は、(作業通称、作業対象部材、場所、使
用工具)に例示される。Here, the work content database 13 will be further described. FIG. 3 shows in detail the work content table 13 ′ held in the work content database 13.
The work content table 13 'associates the worker ID 14 with work information. The work information includes a worker name 15 and a work content 16. The worker ID 14 is a worker ID for identifying the worker 5 emitted by the ID tag 4. Worker 5
Different for each worker, one is assigned to each of the five workers. The worker ID is exemplified by the employee number. The worker name 15 is a name representing the worker 5 indicated by the worker ID 14. The worker name 15 is exemplified by the name of the worker 5. The name or nickname may be used. The work content 16 is one or more work contents performed by the worker 5, which is indicated by the worker ID 14. Contents set in advance for each worker 5 are described based on the overall work plan. The work content is exemplified by (work common name, work target member, place, tool used).
【0039】ここで、作業実績記憶部19を更に説明す
る。図4は、作業実績記憶部19に保存される作業実績
テーブル19’を詳細に示している。作業実績テーブル
19’は、作業者ID14と、作業情報と、作業実績情
報とを対応付けている。作業情報は、作業内容テーブル
13’と同様である。作業実績情報は、開始時刻17と
終了時刻18とからなる。作業者ID14、作業者氏名
15及び作業内容16(作業情報)は、作業内容データ
ベース13と同様である。開始時刻17は、作業者5が
作業開始ボタンを押すことにより、現場制御装置2が確
定した作業の開始時刻である。終了時刻18は、作業者
5が作業終了ボタンを押すことにより、現場制御装置2
が確定した作業の終了時刻である。Here, the work record storage unit 19 will be further described. FIG. 4 shows the work record table 19 'stored in the work record storage unit 19 in detail. The work record table 19 'associates the worker ID 14, work information, and work record information. The work information is the same as the work content table 13 '. The work record information includes a start time 17 and an end time 18. The worker ID 14, the worker name 15, and the work content 16 (work information) are the same as those in the work content database 13. The start time 17 is the start time of the work determined by the site control device 2 when the worker 5 presses the work start button. When the worker 5 presses the work end button at the end time 18, the site control device 2
Is the end time of the work confirmed.
【0040】次に、現場制御装置2を更に説明する。図
5は、現場制御装置2を詳細に示している。現場制御装
置2は、制御部21、表示部22、IDタグアンテナ制
御部23及び記憶部24を具備する。Next, the field controller 2 will be further described. FIG. 5 shows the field control device 2 in detail. The site control device 2 includes a control unit 21, a display unit 22, an ID tag antenna control unit 23, and a storage unit 24.
【0041】制御部21は、現場制御装置2に属する。
現場制御装置2に関わる各部の処理・動作全般を制御す
る。例えば、IDタグアンテナ制御部23(後述)を介
して、現場制御装置2の表示部22(後述)の近傍に進
入した作業者5の作業者IDを受け取り、主制御装置1
へ出力する。また、主制御装置1から出力される、作業
者ID、作業者氏名及び作業内容を受け取り、記憶部2
4(後述)に記憶させると共に表示部22に表示させ
る。更に、作業者5が表示部22を操作することによ
り、作業の開始時刻及び終了時刻を確定し、作業者ID
と共に主制御装置1へ出力する。The control unit 21 belongs to the site control device 2.
It controls the overall processing and operation of each part related to the site control device 2. For example, via the ID tag antenna control unit 23 (described later), the worker ID of the worker 5 who has entered the vicinity of the display unit 22 (described later) of the site control device 2 is received, and the main control device 1 is received.
Output to. The storage unit 2 receives the worker ID, the worker name, and the work content output from the main control device 1.
4 (described later) and display it on the display unit 22. Further, the worker 5 operates the display unit 22 to determine the start time and end time of the work, and the worker ID
It is also output to the main controller 1.
【0042】表示部22は、現場制御装置2に属する。
作業者IDや作業内容等を含む作業内容表示画面25を
表示する。IDタグアンテナ3の近傍にある。作業者5
の操作を容易にするために、タッチパネルの表示装置を
用いる。なお、通常の表示装置及びキーボード等の組合
せでも良い。詳細は後述する。The display unit 22 belongs to the site control device 2.
A work content display screen 25 including a worker ID and work content is displayed. It is in the vicinity of the ID tag antenna 3. Worker 5
In order to facilitate the operation of, a touch panel display device is used. A combination of a normal display device and a keyboard may be used. Details will be described later.
【0043】IDタグアンテナ制御部23は、現場制御
装置2に属する。IDタグ4から発信されている作業者
の作業者IDを、IDタグアンテナ3を用いて受信し、
復調、増幅などの制御を行ない、出力する。また、ID
タグ4へ電力を供給するための電磁フィールドの発生を
制御する。The ID tag antenna control unit 23 belongs to the field control device 2. The worker ID of the worker transmitted from the ID tag 4 is received using the ID tag antenna 3,
Controls demodulation, amplification, etc. and outputs. Also, ID
The generation of an electromagnetic field for supplying power to the tag 4 is controlled.
【0044】記憶部24は、主制御装置1から現場制御
装置2へ出力された作業者ID、作業者氏名、作業内
容、及び作業の開始時間、終了時間を記憶する。The storage unit 24 stores the worker ID, the worker name, the work content, and the start time and end time of the work output from the main control device 1 to the site control device 2.
【0045】次に、表示部22及び表示部12の表示画
面について更に説明する。図6は、表示部22及び表示
部12において、作業内容を確認する際に表示される作
業内容表示画面25を詳細に示している。作業内容表示
画面25は、作業者ID31、作業者氏名32、作業内
容33、開始時刻34、終了時刻35、作業開始ボタン
36、作業終了ボタン37及びコメント欄38からな
る。Next, the display screens of the display section 22 and the display section 12 will be further described. FIG. 6 shows in detail the work content display screen 25 displayed when confirming the work content on the display unit 22 and the display unit 12. The work content display screen 25 includes a worker ID 31, a worker name 32, a work content 33, a start time 34, an end time 35, a work start button 36, a work end button 37, and a comment field 38.
【0046】作業者ID31、作業者氏名32、作業内
容33、開始時刻34及び終了時刻35は、それぞれ作
業者ID14、作業者氏名15、作業内容16、開始時
刻17及び終了時刻18と同様であり、その説明を省略
する。The worker ID 31, the worker name 32, the work content 33, the start time 34 and the end time 35 are the same as the worker ID 14, the worker name 15, the work content 16, the start time 17 and the end time 18, respectively. , The description is omitted.
【0047】作業開始ボタン36及び作業終了ボタン3
7は、それぞれ、作業者5が作業開始時、作業終了時に
押すボタンである。タッチパネルの場合、画面上の然る
べき領域を触れることで、ボタンが押されたことにな
る。ただし、マウスをクリックする、特定のキー(キー
ボードなど)を押す、というような動作で行なうことも
可能である。作業開始ボタン36及び作業終了ボタン3
8を押すことにより、それぞれ作業の開始時刻34及び
終了時刻35が(図示しない現場制御装置2内の時計に
基づいて)自動認識され、画面上の開始時刻34及び終
了時刻35の欄に記録される。それと共に、作業実績記
憶部19へ出力される。Work start button 36 and work end button 3
Buttons 7 are pushed by the worker 5 at the start of work and at the end of work. In the case of a touch panel, touching the appropriate area on the screen means that the button has been pressed. However, it is also possible to perform an operation such as clicking the mouse or pressing a specific key (keyboard or the like). Work start button 36 and work end button 3
By pressing 8, the start time 34 and the end time 35 of the work are automatically recognized (based on the clock in the field control device 2 not shown), and recorded in the fields of the start time 34 and the end time 35 on the screen. It At the same time, it is output to the work record storage unit 19.
【0048】コメント欄38は、現場制御装置2による
作業者5に対するメッセージを表示する。例えば、作業
開始ボタン36を押すことや、入力作業終了後、作業を
開始するように要求する、などである。なお、表示部1
2においては、作業開始ボタン36、作業終了ボタン3
7及びコメント欄38は表示されない。The comment column 38 displays a message to the worker 5 by the field control device 2. For example, pressing the work start button 36 or requesting to start the work after the input work is finished. The display unit 1
2, the work start button 36 and the work end button 3
7 and the comment column 38 are not displayed.
【0049】次に、本発明である工数自動把握システム
及び工数自動把握方法装置の実施の形態における動作に
ついて、添付図面を参照してを説明する。図7及び図8
は、本発明である工数自動把握システム及び工数自動把
握方法装置の実施の形態における動作を示すフロー図で
ある。図7及び図8の二つの図で一つのフロー図を形成
する。Next, the operation of the embodiment of the man-hour automatic grasping system and the man-hour automatic grasping method according to the present invention will be described with reference to the accompanying drawings. 7 and 8
FIG. 4 is a flow chart showing an operation in the embodiment of the manhour automatic grasping system and the manhour automatic grasping method apparatus according to the present invention. The two views of FIGS. 7 and 8 form a flow diagram.
【0050】(1)ステップS1:IDタグ4を装着し
た作業者5は、作業開始に当たり、現場制御装置2の表
示部22の画面入力を行なうために、表示部22へ向か
う。すなわち、その近傍にあるIDタグアンテナ3に接
近する。その時、IDタグアンテナ3の受信可能領域に
IDタグ4が入る。
(2)ステップS2:IDタグ4は、作業者IDを発信
する。現場制御装置2は、IDタグアンテナ3を介して
作業者IDを受信する。
(3)ステップS3:現場制御装置2は、作業者IDを
出力し、主制御装置1へ検索を要求する。主制御装置1
は、出力された作業者IDを受け取る。ただし、IDタ
グアンテナ3の受信した作業者IDを、直接主制御装置
へ出力することも可能である。
(4)ステップS4:主制御装置1は、作業者IDに基
づいて、作業内容データベース13の作業内容テーブル
13’から、作業者ID14に対応する作業者氏名15
及び作業内容16を検索する。
(5)ステップS5:主制御装置1は、検索結果である
作業者ID14、作業者氏名15及び作業内容16を現
場制御装置2へ出力する。その際、予め設定された期間
(例示:一週間分、一日分、半日分、一作業分)の分の
作業内容16を出力する。現場制御装置2は、検索結果
を受け取る。
(6)ステップS6:現場制御装置2は、作業者ID1
4、作業者氏名15及び作業内容16を記憶部24に記
憶する。
(7)ステップS7:現場制御装置2は、作業者ID1
4、作業者氏名15及び作業内容16を表示部22に、
作業内容表示画面25として表示する。そしてコメント
欄38に、作業者5へ入力を要求する指示(例示:「確
認・入力して下さい」)を表示する。
(8)ステップS8:作業内容表示画面25の表示は、
作業者5に、内容の確認と作業の開始確認の入力とを要
求している。
(9)ステップS9:作業者5は、作業内容を確認後、
作業開始ボタン36をONにし、作業を開始する。な
お、複数の作業内容が表示された場合、作業者5は、作
業内容を作業内容33欄の中から選択することも可能で
ある。その場合、作業者5は、画面上にて選択のための
操作(例示:矢印キーやマウスを用いて、行なう作業内
容を選択し、作業開始ボタン36をONにする)を追加
で行なう。
(10)ステップS10:作業者5の作業開始ボタン3
6ONは、現場制御装置2に作業者5が作業を開始する
ことを示している。
(11)ステップS11:現場制御装置2は、内部に有
する時計により、作業の開始時刻を確定する。そして、
その開始時刻を作業内容表示画面25の開始時刻34欄
に表示すると共に、記憶部24で記憶する。
(12)ステップS12:現場制御装置2は、作業の開
始時刻を作業者ID、作業内容と共に主制御装置1へ出
力し、主制御装置1へ記憶を要求する。主制御装置1
は、開始時刻、作業者ID及び作業内容を受け取る。
(13)ステップS13:主制御装置1は、作業実績記
憶部19の作業実績テーブル19’へ、作業者ID、作
業者氏名、作業内容、開始時刻(作業内容に対応)を書
き込み、記憶する。
(14)ステップS14:主制御装置1は、書き込みの
終了を現場制御装置2へ出力し、現場制御装置2は、そ
れを受け取る。
(15)ステップS15:現場制御装置2は、書き込み
終了に基づいて、コメント欄38に、作業者5へ作業開
始を要求する指示(例示:「作業を開始して下さい」)
を表示する。
(16)ステップS16:作業内容表示画面25の表示
は、作業者5に、作業開始を要求している。
(17)ステップS17:作業者5は、作業を実行す
る。
(18)ステップS18:作業者5は、作業の終了後、
現場制御装置2の表示部22の画面入力を行なうため
に、表示部22へ向かう。すなわち、その近傍にあるI
Dタグアンテナ3に再び接近する。その時、IDタグア
ンテナ3の受信可能領域にIDタグ4が入る。
(19)ステップS19:IDタグ4は、作業者IDを
発信する。現場制御装置2は、IDタグアンテナ3を介
して作業者IDを受信する。
(20)ステップS20:現場制御装置2は、作業者I
Dに基づいて、記憶部24から対応する作業者IDの作
業内容表示画面25を検索し、表示する。そしてコメン
ト欄38に、作業者5へ入力を要求する指示(例示:
「確認・入力して下さい」)表示する。
(21)ステップS21:作業内容表示画面25の表示
は、作業者5に作業の終了確認の入力を要求している。
(22)ステップS22:作業者5は、作業終了ボタン
37をONにし、作業の終了を確定する。なお、複数の
作業内容が表示された場合、作業者5は、作業内容を作
業内容33欄の中から選択する。その場合、作業者5
は、画面上にて選択のための操作(例示:矢印キーやマ
ウスを用いて、行なう作業内容を選択し、作業終了ボタ
ン37をONにする)を追加で行なう。
(23)ステップS23:作業者5の作業終了ボタン3
7ONは、現場制御装置2に作業者5が作業を終了した
ことを示している。
(24)ステップS24:現場制御装置2は、内部に有
する時計により、作業の終了時刻を確定する。そして、
その終了時刻を作業内容表示画面25の終了時刻35欄
に表示すると共に、記憶部24で記憶する。
(25)ステップS25:現場制御装置2は、作業の終
了時刻を作業者ID、作業内容と共に主制御装置1へ出
力し、主制御装置1へ記憶を要求する。主制御装置1
は、終了時刻、作業者ID及び作業内容を受け取る。
(26)ステップS26:主制御装置1は、作業実績記
憶部19の作業実績テーブル19’へ、作業者ID、作
業者氏名、作業内容、終了時刻(作業内容に対応)を書
き込み、記憶する。
(27)ステップS27:主制御装置1は、作業者ID
で示される作業者5に割り当てられた作業が全て終了し
たかを判断する。終了していない場合には、作業者ID
を現場制御装置2へ出力し、ステップS7へ進む。ま
た、終了している場合にはステップS28へ進む。
(28)ステップS28:主制御装置1は、作業実績テ
ーブル19’を、表示部12及びその他の然るべき出力
装置へ出力する。
(29)ステップS29:主制御装置1は、作業の終了
を出力し、現場制御装置2はそれを受け取る。
(30)ステップS30:現場制御装置2は、作業終了
を表示する。
ステップS30の終了後、作業者5は、作業を終了す
る。(1) Step S1: At the start of work, the worker 5 wearing the ID tag 4 heads to the display unit 22 to input a screen on the display unit 22 of the on-site control device 2. That is, the ID tag antenna 3 in the vicinity thereof is approached. At that time, the ID tag 4 enters the receivable area of the ID tag antenna 3. (2) Step S2: The ID tag 4 transmits the worker ID. The site control device 2 receives the worker ID via the ID tag antenna 3. (3) Step S3: The site control device 2 outputs the worker ID and requests the main control device 1 to search. Main controller 1
Receives the output worker ID. However, it is also possible to directly output the operator ID received by the ID tag antenna 3 to the main control device. (4) Step S4: The main control device 1 determines the worker name 15 corresponding to the worker ID 14 from the work content table 13 ′ of the work content database 13 based on the worker ID.
And the work content 16 are searched. (5) Step S5: The main control device 1 outputs the worker ID 14, the worker name 15 and the work content 16 which are the search results to the site control device 2. At that time, the work content 16 for a preset period (eg, one week, one day, half a day, one work) is output. The site control device 2 receives the search result. (6) Step S6: The field control device 2 has the worker ID 1
4, the worker name 15 and the work content 16 are stored in the storage unit 24. (7) Step S7: The field control device 2 has the worker ID1.
4, the worker name 15 and the work content 16 on the display unit 22,
The work content display screen 25 is displayed. Then, in the comment field 38, an instruction for requesting the operator 5 to input (eg: “confirm / enter”) is displayed. (8) Step S8: The work content display screen 25 is displayed as
The worker 5 is requested to confirm the contents and input the confirmation of the start of the work. (9) Step S9: The worker 5, after confirming the work content,
The work start button 36 is turned on to start the work. When a plurality of work contents are displayed, the worker 5 can also select the work contents from the work contents 33 column. In that case, the worker 5 additionally performs an operation for selection on the screen (eg, using the arrow keys or the mouse to select the work content to be performed and turning on the work start button 36). (10) Step S10: Work start button 3 of the worker 5
6ON indicates that the worker 5 starts the work on the site control device 2. (11) Step S11: The field control device 2 determines the start time of the work by using the internal clock. And
The start time is displayed in the start time 34 column of the work content display screen 25 and is stored in the storage unit 24. (12) Step S12: The field control device 2 outputs the work start time to the main control device 1 together with the worker ID and the work content, and requests the main control device 1 to store the work. Main controller 1
Receives the start time, the worker ID, and the work content. (13) Step S13: The main control device 1 writes and stores the worker ID, the worker name, the work content, and the start time (corresponding to the work content) in the work record table 19 ′ of the work record storage unit 19. (14) Step S14: The main controller 1 outputs the end of writing to the site controller 2, and the site controller 2 receives it. (15) Step S15: Based on the completion of writing, the site control device 2 instructs the comment field 38 to request the worker 5 to start work (eg, “start work”).
Is displayed. (16) Step S16: The work content display screen 25 requires the worker 5 to start work. (17) Step S17: The worker 5 executes the work. (18) Step S18: The worker 5, after finishing the work,
To perform screen input of the display unit 22 of the on-site control device 2, the user goes to the display unit 22. That is, I near it
Approach the D tag antenna 3 again. At that time, the ID tag 4 enters the receivable area of the ID tag antenna 3. (19) Step S19: The ID tag 4 transmits the worker ID. The site control device 2 receives the worker ID via the ID tag antenna 3. (20) Step S20: The site control device 2 is the worker I
Based on D, the work content display screen 25 of the corresponding worker ID is retrieved from the storage unit 24 and displayed. Then, in the comment field 38, an instruction for requesting the operator 5 to input (example:
"Confirm and enter") Display. (21) Step S21: The display of the work content display screen 25 requires the worker 5 to input an end confirmation of the work. (22) Step S22: The worker 5 turns on the work end button 37 to confirm the end of the work. When a plurality of work contents are displayed, the worker 5 selects the work contents from the work contents 33 column. In that case, worker 5
In addition, an operation for selection on the screen (exemplification: use the arrow keys or the mouse to select the content of the work to be performed and turn on the work end button 37) is additionally performed. (23) Step S23: Work end button 3 of the worker 5
7ON indicates that the worker 5 has finished the work in the field control device 2. (24) Step S24: The on-site control device 2 determines the end time of the work by the internal clock. And
The end time is displayed in the end time 35 column of the work content display screen 25 and is stored in the storage unit 24. (25) Step S25: The field control device 2 outputs the work end time together with the worker ID and the work content to the main control device 1, and requests the main control device 1 to store the work. Main controller 1
Receives the end time, the worker ID, and the work content. (26) Step S26: The main control device 1 writes and stores the worker ID, the worker name, the work content, and the end time (corresponding to the work content) in the work performance table 19 ′ of the work performance storage unit 19. (27) Step S27: Main controller 1 is the worker ID
It is determined whether or not all the works assigned to the worker 5 indicated by are completed. Worker ID if not finished
Is output to the field control device 2, and the process proceeds to step S7. If it has ended, the process proceeds to step S28. (28) Step S28: The main controller 1 outputs the work record table 19 ′ to the display unit 12 and other appropriate output devices. (29) Step S29: The main controller 1 outputs the end of the work, and the field controller 2 receives it. (30) Step S30: The site control device 2 displays the end of work. After the end of step S30, the worker 5 ends the work.
【0051】ステップS11、ステップS24におい
て、作業の開始時刻及び終了時刻を、現場制御装置2で
確定している。しかし、現場制御装置2が時計を持たな
いようにし、主制御装置1が時計を有し、主制御装置1
において作業の開始時刻及び終了時刻を確定することも
可能である。In steps S11 and S24, the start time and the end time of the work are determined by the site control device 2. However, the on-site controller 2 does not have a clock, the main controller 1 has a clock, and the main controller 1
In, it is also possible to determine the start time and end time of the work.
【0052】その場合、開始時刻の確定動作は以下の様
になる。現場制御装置2は、作業者5の行なう作業の開
始を示す開始操作に基づいて、その開始操作を示す第1
信号を、作業者ID、作業内容と共に主制御装置7へ
(ネットワーク6を介して)出力する。主制御装置1
は、その第1信号を受信した時点で、その信号に基づい
て、自身が有する時計により作業の開始時刻17を確定
する。そして、開始時刻17を、作業内容16と作業者
ID14と共に作業実績テーブル19’として保持す
る。その後、主制御装置1は、開始時刻17を現場制御
装置2へ出力する。現場制御装置2は、開始時刻17を
表示する。In this case, the start time determination operation is as follows. Based on the start operation indicating the start of the work performed by the worker 5, the on-site control device 2 indicates the first operation indicating the start operation.
The signal is output to the main controller 7 (via the network 6) together with the worker ID and the work content. Main controller 1
When the first signal is received, the watch determines the start time 17 of the work by its own clock based on the signal. Then, the start time 17 is held as a work record table 19 ′ together with the work content 16 and the worker ID 14. Then, main controller 1 outputs start time 17 to on-site controller 2. The site control device 2 displays the start time 17.
【0053】終了時刻の確定動作は以下の様になる。更
に、本発明の工数自動把握システムは、現場制御装置2
が、作業者5の行なう作業の終了を示す終了操作に基づ
いて、その終了操作を示す第2信号を、作業者ID、作
業内容と共に主制御装置1へ出力する。主制御装置1
は、その第2信号を受信した時点で、その信号に基づい
て、自身が有する時計により作業の終了時刻18を確定
する。そして、終了時刻18を、作業内容16と作業者
ID14と共に作業実績テーブル19’へ保持する。そ
の後、主制御装置1は、終了時刻18を現場制御装置2
へ出力する。現場制御装置2は、終了時刻18を表示す
る。The operation for determining the end time is as follows. Furthermore, the man-hour automatic grasping system of the present invention is used in the field control device 2
Outputs a second signal indicating the end operation to the main controller 1 together with the worker ID and the work content based on the end operation indicating the end of the work performed by the worker 5. Main controller 1
When the second signal is received, the clock determines the end time 18 of the work based on the signal. Then, the end time 18 is held in the work record table 19 ′ together with the work content 16 and the worker ID 14. After that, the main controller 1 sets the end time 18 to the on-site controller 2
Output to. The site control device 2 displays the end time 18.
【0054】各現場制御装置2が、作業の開始時刻及び
終了時刻の確定を行なう場合、処理が分散しているの
で、主制御装置1に負担が掛からずに済む。逆に、主制
御装置1が、作業の開始時刻及び終了時刻の確定を行な
う場合、各現場制御装置2間の開始時刻及び終了時刻の
互換性が高くなり、一貫した時間管理を正確に行なうこ
とが出来る。どちらを選択するかは、現場制御装置2の
数や、作業内容(時間に厳しいか)、装置の信頼性など
で決定される。When each on-site control device 2 determines the start time and end time of the work, the processing is distributed, so that the main control device 1 is not burdened. On the contrary, when the main control device 1 determines the start time and the end time of the work, the compatibility of the start time and the end time between the site control devices 2 becomes high, and the consistent time management can be performed accurately. Can be done. Which one is selected is determined by the number of on-site control devices 2, the work content (whether the time is strict), the reliability of the device, and the like.
【0055】また、作業者5は、複数の作業内容を並行
して行なうことも可能である。その場合、上記の実施例
の動作を並行に行なうことで、実施可能である。どの作
業内容に関する入力かは、ステップS9及びステップS
22において、作業内容を選択することで、対応するこ
とができる。The worker 5 can also perform a plurality of work contents in parallel. In that case, it can be implemented by performing the operations of the above-described embodiments in parallel. For which work content the input is, step S9 and step S
At 22, the work content can be selected by selecting the work content.
【0056】以上の動作中、事務所7の管理者等は、主
制御装置1の操作を行ない、表示部12に作業状況を示
す画面(作業内容表示画面25のような画面)を表示さ
せることが出来る。すなわち、作業の進捗状況をリアル
タイムで把握することが可能となる。During the above operation, the administrator of the office 7 operates the main controller 1 to display a screen showing the work status on the display unit 12 (screen like the work content display screen 25). Can be done. That is, it is possible to grasp the progress of work in real time.
【0057】また、その際、作業者5は、単に現場制御
装置2の表示部22で、作業開始ボタン36及び作業終
了ボタン37に触れるだけで良い。すなわち、入力作業
も極めて容易で、作業者5を、手間の掛かる入力作業で
煩わすことが無い。At this time, the worker 5 only has to touch the work start button 36 and the work end button 37 on the display unit 22 of the site control device 2. That is, the input work is extremely easy, and the worker 5 is not bothered with the troublesome input work.
【0058】[0058]
【発明の効果】本発明により、作業現場における工数の
把握を、作業者に対する負担を少なくして実施出来る。
そして、その情報に基づいて、リアルタイムで各作業者
の作業の状況を把握することが可能となる。According to the present invention, the number of man-hours at the work site can be grasped while reducing the burden on the worker.
Then, based on the information, it becomes possible to grasp the work status of each worker in real time.
【図1】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における構成を示す図であ
る。FIG. 1 is a diagram showing a configuration in an embodiment of a manhour automatic grasping system and a manhour automatic grasping method apparatus according to the present invention.
【図2】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における主制御装置の構成
を示す図である。FIG. 2 is a diagram showing a configuration of a main controller in an embodiment of the manhour automatic grasping system and the manhour automatic grasping method device according to the present invention.
【図3】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における作業内容テーブル
を示す図である。FIG. 3 is a diagram showing a work content table in the embodiment of the man-hour automatic grasping system and the man-hour automatic grasping method device according to the present invention.
【図4】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における作業実績テーブル
を示す図である。FIG. 4 is a diagram showing a work record table in the embodiment of the man-hour automatic grasping system and the man-hour automatic grasping method apparatus according to the present invention.
【図5】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における現場制御装置を示
す図である。FIG. 5 is a diagram showing a site control device in an embodiment of a manhour automatic grasping system and a manhour automatic grasping method device according to the present invention.
【図6】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における作業内容表示画面
を示す図である。FIG. 6 is a diagram showing a work content display screen in the embodiment of the man-hour automatic grasping system and the man-hour automatic grasping method device according to the present invention.
【図7】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における動作を示すフロー
図であって、開始から途中までを示す。FIG. 7 is a flowchart showing the operation in the embodiment of the manhour automatic grasping system and the manhour automatic grasping method apparatus according to the present invention, showing from the start to the middle.
【図8】本発明である工数自動把握システム及び工数自
動把握方法装置の実施の形態における動作を示すフロー
図であって、途中から終了までを示す。FIG. 8 is a flowchart showing an operation in the embodiment of the manhour automatic grasping system and the manhour automatic grasping method apparatus according to the present invention, showing from the middle to the end.
1 主制御装置 2 現場制御装置 3 IDタグアンテナ 4 IDタグ 5 作業者 6 ネットワーク 7 事務所 8 工場 11 制御部 12 表示部 13 作業内容データベース 14 作業者ID 15 作業者氏名 16 作業内容 17 開始時刻 18 終了時刻 19 作業実績記憶部 21 制御部 22 表示部 23 IDタグアンテナ制御部 24 記憶部 25 作業内容表示画面 31 作業者ID 32 作業者氏名 33 作業内容 34 開始時刻 35 終了時刻 36 作業開始ボタン 37 作業終了ボタン 38 コメント欄 1 Main controller 2 Field control device 3 ID tag antenna 4 ID tag 5 workers 6 network 7 offices 8 factories 11 Control unit 12 Display 13 work content database 14 Worker ID 15 Name of worker 16 Work content 17 start time 18 end time 19 Work record storage 21 Control unit 22 Display 23 ID tag antenna control unit 24 Memory 25 Work content display screen 31 Worker ID 32 worker name 33 Work content 34 start time 35 end time 36 Work start button 37 Work end button 38 Comment field
フロントページの続き (72)発明者 小田 勝正 広島県広島市西区観音新町四丁目6番22号 三菱重工業株式会社広島製作所内 Fターム(参考) 3C100 AA23 BB17 CC02 CC14 Continued front page (72) Inventor Katsumasa Oda 4-6-22 Kannon Shinmachi, Nishi-ku, Hiroshima City, Hiroshima Prefecture Inside Mitsubishi Heavy Industries Hiroshima Works F-term (reference) 3C100 AA23 BB17 CC02 CC14
Claims (11)
識別データを発信するタグと、 前記タグが受信可能領域に進入したとき、前記タグから
前記識別データを受信するアンテナと、 受信された前記識別データに基づいて、前記作業者の行
なう作業の作業内容と、前記作業者を表す名称と、を表
示する現場制御装置と、 を具備する、 工数自動把握システム。1. A tag attached to a worker and transmitting identification data for identifying the worker; an antenna for receiving the identification data from the tag when the tag enters a receivable area; An automatic man-hour grasping system, comprising: a site control device that displays the work content of the work performed by the worker and a name representing the worker based on the identification data.
と前記名称とを出力する主制御装置と、 を更に具備し、 前記現場制御装置は、前記受信された識別データを前記
主制御装置へ出力し、前記主制御装置から出力された前
記作業内容と前記名称とを表示する、 請求項1に記載の工数自動把握システム。2. A main control device that outputs the work content and the name based on the identification data, wherein the on-site control device sends the received identification data to the main control device. The manhour automatic grasping system according to claim 1, wherein the work content and the name that are output and output from the main control device are displayed.
て、前記時計により前記作業の開始時刻を確定し、前記
開始時刻を前記主制御装置へ出力し、 前記主制御装置は、前記開始時刻を、前記作業内容と前
記識別データと共に作業実績テーブルとして保持する、 請求項2に記載の工数自動把握システム。3. The on-site control device has a clock, and based on a start operation indicating the start of the work performed by the worker, the clock determines the start time of the work, and the start time is set to the main time. The man-hour automatic grasping system according to claim 2, wherein the main controller holds the start time together with the work content and the identification data as a work record table.
て、前記時計により前記作業の終了時刻を確定し、前記
終了時刻を前記主制御装置へ出力し、 前記主制御装置は、更に、前記終了時刻を、前記作業実
績テーブルへ保持する、 請求項3に記載の工数自動把握システム。4. The on-site control device determines the end time of the work by the clock based on an end operation indicating the end of the work performed by the worker, and outputs the end time to the main control device. The manhour automatic grasping system according to claim 3, wherein the main controller further holds the end time in the work record table.
示す開始操作に基づいて、前記開始操作を示す第1信号
を前記主制御装置へ出力し、 前記主制御装置は、前記第1信号に基づいて、前記時計
により前記作業の開始時刻を確定し、前記開始時刻を、
前記作業内容と前記識別データと共に作業実績テーブル
として保持し、前記開始時刻を前記現場制御装置へ出力
し、 前記現場制御装置は、前記開始時刻を表示する、 請求項2に記載の工数自動把握システム。5. The main control device includes a clock, and the site control device, based on a start operation indicating the start of work performed by the worker, sends a first signal indicating the start operation to the main control device. Output to a device, the main control unit, based on the first signal, the start time of the work is determined by the clock, the start time,
The man-hour automatic grasping system according to claim 2, which holds the work content and the identification data as a work record table, outputs the start time to the site control device, and the site control device displays the start time. .
作業の終了を示す終了操作に基づいて、前記終了操作を
示す第2信号を前記主制御装置へ出力し、 前記主制御装置は、前記第2信号に基づいて、前記時計
により前記作業の終了時刻を確定し、前記終了時刻を、
作業実績テーブルへ保持し、前記終了時刻を前記現場制
御装置へ出力し、 前記現場制御装置は、前記終了時刻を表示する、 請求項5に記載の工数自動把握システム。6. The on-site control device outputs a second signal indicating the end operation to the main control device based on an end operation indicating the end of the work performed by the worker, and the main control device comprises: On the basis of the second signal, the end time of the work is fixed by the timepiece, and the end time is
The man-hour automatic grasping system according to claim 5, which holds the work result table and outputs the end time to the site control device, and the site control device displays the end time.
現場制御装置の操作装置の一部を、前記作業者による一
動作により、前記開始操作及び前記終了操作の内の少な
くとも一方の入力を可能な状態にする、 請求項4又は6に記載の工数自動把握システム。7. The on-site control device, when the identification data is received by the antenna, causes a part of an operation device of the on-site control device to perform the start operation and the end operation by one operation of the worker. The man-hour automatic grasping system according to claim 4 or 6, wherein at least one of the items is set in a state capable of being input.
近したとき、前記タグの発する前記作業者を識別する識
別データを受信するステップと、 受信した前記識別データに基づいて、前記作業者の行な
う作業の作業内容と前記作業者を表す名称とを、前記識
別データと前記作業内容と前記名称との対応を示す作業
内容データベースにおいて検索するステップと、 前記作業内容データベースでの検索結果に基づいて、前
記作業内容と前記名称とを前記第1表示画面に表示する
ステップと、 前記作業者の行なう作業の開始を示す開始操作に基づい
て、前記作業の開始時刻を確定するステップと、 前記開始時刻を、前記第1表示画面に表示するステップ
と、 前記開始時刻を、前記作業内容と前記識別データと共に
作業実績テーブルとして保持するステップと、 前記第1表示画面に表示された情報を一時的に保持する
ステップと、 を具備する、 工数自動把握方法。8. A step of receiving identification data for identifying the worker emitted by the tag when a worker wearing the tag approaches the first display screen, and the work based on the received identification data. A task content of a task performed by a worker and a name representing the worker in a task content database indicating a correspondence between the identification data, the task content, and the name; and a search result in the task content database. A step of displaying the work content and the name on the first display screen, and a step of determining the start time of the work based on a start operation indicating the start of the work performed by the worker, Displaying a start time on the first display screen; holding the start time together with the work content and the identification data as a work record table Steps and comprises the steps of: temporarily holding the information displayed on the first display screen, steps automatic grasping method.
したとき、前記タグの発する作業者を識別する識別デー
タを受信するステップと、 受信した前記識別データに基づいて、前記作業内容と前
記名称とを、前記一時的に保持された情報から検索する
ステップと、 前記情報での検索結果に基づいて、前記作業内容と前記
名称とを前記第1表示画面に表示するステップと、 前記作業者の行なう作業の終了を示す終了操作に基づい
て、前記作業の終了時刻を確定するステップと、 前記終了時刻を、前記第1表示画面に表示するステップ
と、 前記終了時刻を、前記作業実績テーブルに保持するステ
ップと、 を更に具備する、 請求項8に記載の工数自動把握方法。9. When the worker approaches the first display screen again, a step of receiving identification data for identifying the worker emitted by the tag, and the work content based on the received identification data. Searching the name from the temporarily stored information; displaying the work content and the name on the first display screen based on a search result in the information; The end time of the work based on an end operation indicating the end of the work performed by a person, the step of displaying the end time on the first display screen, the end time, the work record table The method for automatically grasping man-hours according to claim 8, further comprising:
接近したとき、受信された前記タグの発する前記作業者
を識別する識別データに基づいて、前記作業者の行なう
作業の作業内容と前記作業者を表す名称とを、前記識別
データと前記作業内容と前記名称との対応を示す作業内
容データベースにおいて検索するステップと、 前記検索結果に基づいて、前記作業内容と前記名称とを
前記第1表示画面に表示するステップと、 を具備する方法をコンピュータに実行するためのプログ
ラム。10. When the worker wearing the tag approaches the first display screen, the contents of the work performed by the worker based on the received identification data for identifying the worker issued by the tag. Searching a name representing the worker in a work content database showing correspondence between the identification data, the work content, and the name; and, based on the search result, the work content and the name 1. A program for causing a computer to execute a method comprising: a step of displaying on a display screen.
始操作に基づいて、前記作業の開始時刻を確定するステ
ップと、 前記開始時刻を、前記作業内容と前記識別データと共に
作業実績テーブルとして保持させるステップと、 前記作業者の行なう作業の終了を示す終了操作に基づい
て、前記作業の終了時刻を確定するステップと、 前記終了時刻を、前記作業内容と前記識別データと共に
前記作業実績テーブルに保持させるステップと、 を更に具備する請求項10に記載の方法をコンピュータ
に実行させるためのプログラム。11. A step of determining a start time of the work based on a start operation indicating the start of the work performed by the worker, and the start time is held as a work record table together with the work content and the identification data. And a step of determining the end time of the work based on an end operation indicating the end of the work performed by the worker, and holding the end time in the work record table together with the work content and the identification data. A program for causing a computer to execute the method according to claim 10, further comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001352053A JP2003150224A (en) | 2001-11-16 | 2001-11-16 | System and method for automatically grasping man-hour |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001352053A JP2003150224A (en) | 2001-11-16 | 2001-11-16 | System and method for automatically grasping man-hour |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003150224A true JP2003150224A (en) | 2003-05-23 |
Family
ID=19164284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001352053A Withdrawn JP2003150224A (en) | 2001-11-16 | 2001-11-16 | System and method for automatically grasping man-hour |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003150224A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004362347A (en) * | 2003-06-05 | 2004-12-24 | Shimomoto Shoji | User automobile inspection support system |
JP2005078222A (en) * | 2003-08-28 | 2005-03-24 | Seiko Precision Inc | Passage management system, safety management system, and passage management method |
JP2005309549A (en) * | 2004-04-19 | 2005-11-04 | Hitachi Ltd | Work instruction system and work instruction method |
JP2006022525A (en) * | 2004-07-07 | 2006-01-26 | Nishimatsu Constr Co Ltd | Entrance / exit management device |
JP2006139618A (en) * | 2004-11-12 | 2006-06-01 | Xybernaut Corp | Asset maintenance management/inspection system and method for the same |
JP2006209419A (en) * | 2005-01-27 | 2006-08-10 | Nishimatsu Constr Co Ltd | Work management system and work management apparatus |
WO2007013260A1 (en) * | 2005-07-27 | 2007-02-01 | Murata Kikai Kabushiki Kaisha | Operation system and operation instruction method in operation system |
WO2012093500A1 (en) * | 2011-01-06 | 2012-07-12 | オムロン株式会社 | Work information recording apparatus, and method and program for controlling same |
JP2013117825A (en) * | 2011-12-02 | 2013-06-13 | Tadahiko Yoshida | Method for preparing insurance fee declaration document of industrial accident compensation insurance |
JP2014154719A (en) * | 2013-02-08 | 2014-08-25 | Disco Abrasive Syst Ltd | Processing apparatus |
JP2021056702A (en) * | 2019-09-30 | 2021-04-08 | Kddi株式会社 | Safety determination apparatus and safety determination method |
-
2001
- 2001-11-16 JP JP2001352053A patent/JP2003150224A/en not_active Withdrawn
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004362347A (en) * | 2003-06-05 | 2004-12-24 | Shimomoto Shoji | User automobile inspection support system |
JP2005078222A (en) * | 2003-08-28 | 2005-03-24 | Seiko Precision Inc | Passage management system, safety management system, and passage management method |
JP2005309549A (en) * | 2004-04-19 | 2005-11-04 | Hitachi Ltd | Work instruction system and work instruction method |
JP2006022525A (en) * | 2004-07-07 | 2006-01-26 | Nishimatsu Constr Co Ltd | Entrance / exit management device |
JP2006139618A (en) * | 2004-11-12 | 2006-06-01 | Xybernaut Corp | Asset maintenance management/inspection system and method for the same |
JP2006209419A (en) * | 2005-01-27 | 2006-08-10 | Nishimatsu Constr Co Ltd | Work management system and work management apparatus |
WO2007013260A1 (en) * | 2005-07-27 | 2007-02-01 | Murata Kikai Kabushiki Kaisha | Operation system and operation instruction method in operation system |
JPWO2007013260A1 (en) * | 2005-07-27 | 2009-02-05 | 村田機械株式会社 | Work system and work instruction method in work system |
WO2012093500A1 (en) * | 2011-01-06 | 2012-07-12 | オムロン株式会社 | Work information recording apparatus, and method and program for controlling same |
CN103282846A (en) * | 2011-01-06 | 2013-09-04 | 欧姆龙株式会社 | Work information recording apparatus, and method and program for controlling same |
CN103282846B (en) * | 2011-01-06 | 2015-05-27 | 欧姆龙株式会社 | Work information recording apparatus, and method and program for controlling same |
JP2013117825A (en) * | 2011-12-02 | 2013-06-13 | Tadahiko Yoshida | Method for preparing insurance fee declaration document of industrial accident compensation insurance |
JP2014154719A (en) * | 2013-02-08 | 2014-08-25 | Disco Abrasive Syst Ltd | Processing apparatus |
JP2021056702A (en) * | 2019-09-30 | 2021-04-08 | Kddi株式会社 | Safety determination apparatus and safety determination method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140350708A1 (en) | Work process management system, work process management terminal device, computer program, and work process management method | |
US7398185B2 (en) | Action record support program, system, device, and method | |
JP2003150224A (en) | System and method for automatically grasping man-hour | |
CN110456750B (en) | Information collection equipment, forging die production information collection system and working method thereof | |
JP2006178845A (en) | Rental management system and rental management program | |
KR20140144273A (en) | Device for collecting information for display and hmi system | |
JP4215573B2 (en) | Article placement management system | |
US20020059211A1 (en) | System for managing objects based on position data | |
JP6608889B2 (en) | Numerical control apparatus, apparatus included in industrial machine, and numerical control system | |
JP2006107161A (en) | Tool management apparatus, tool management method, tool management program, and tool management program storage medium | |
CN111079871A (en) | Locking control method, locking device and control device based on electronic tag | |
JP6310333B2 (en) | Work management system and work management method | |
JP2008003978A (en) | Work results collection system and work results collection method | |
JP6418279B1 (en) | Management device, location information collection system, and location information collection method | |
JP2006099558A (en) | Production navigation system and navigation terminal | |
JP2005259078A (en) | Support apparatus and management system | |
JP2004054341A (en) | Production equipment management system and production equipment management method | |
JPH11283196A (en) | Car allocation system | |
JP2006072599A (en) | Production navigation system | |
KR20170135797A (en) | Intelligent reservation system | |
JP2003280720A (en) | Set-up support system for component in process | |
JP2005038294A (en) | Controller management system | |
JP2002297214A (en) | Information processor, information communication system, manufacture lead time grasping method, and production managing method and recording medium | |
JP4818551B2 (en) | Scheduled operation management device, scheduled operation system and scheduled operation method for machine tool | |
JPH10272271A (en) | Pattern sewing work data processing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Application deemed to be withdrawn because no request for examination was validly filed |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20050201 |