CN101044477A - Construction payment management system and method - Google Patents

Construction payment management system and method Download PDF

Info

Publication number
CN101044477A
CN101044477A CN 200580022122 CN200580022122A CN101044477A CN 101044477 A CN101044477 A CN 101044477A CN 200580022122 CN200580022122 CN 200580022122 CN 200580022122 A CN200580022122 A CN 200580022122A CN 101044477 A CN101044477 A CN 101044477A
Authority
CN
China
Prior art keywords
payment
action
lien
participant
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200580022122
Other languages
Chinese (zh)
Inventor
帕特里克·J·阿林
查尔斯·C·彻里
威廉·H·艾克霍恩
迈克尔·L·弗林
霍华德·L·尼登
小理查德·P·彼得森
马修·R·巴格利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Textura Corp
Original Assignee
Textura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Textura Corp filed Critical Textura Corp
Publication of CN101044477A publication Critical patent/CN101044477A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A system and methods are provided, which are used for managing a construction payment process. The first method for realizing the invention can comprises that a participator is allowed to receive a payment in relation to the engineering through an access logon message; the second method can comprise an automatic invoice, which consists of a or a plurality of payout items; the third method can consist of an automatically generated pledge, which comprises a sum from the automatic invoice; and the fourth method can comprise the confirmation that the receiving participator has received the fund and the abandon of a lien is released at the same time. Moreover, another method consists of a coordination of the main budget and the auxiliary budget, which comprises the payout items, before the fund drawing management.

Description

施工支付管理系统及方法Construction payment management system and method

相关申请related application

在35U.S.C.§119下,要求在2004年6月29日提交的美国专利申请序列号60/583,782的优先权。Priority is claimed to US Patent Application Serial No. 60/583,782, filed June 29, 2004, under 35 U.S.C. §119.

背景技术Background technique

住宅和商用施工工程(project)要求几个组织彼此通信以便分发支付款。传统的施工支付管理方法首先是通过口头通知来告知可以从工程贷款或业主方的帐户进行支取。施工工程的总承包商(GC)通过电话、传真或在会议上把这种支取通知给各分包商(或由GC聘请的任何其他人、企业或公司,诸如材料供应商)。分包商要准备发票,并通过邮件、传真、直接递送或在与GC的会议上将其送交给GC。GC和各分包商通常必须通过电话或在会议上协商最终发票金额。GC确认这些发票,将细目写入GC工程记帐系统,以及准备其自己的发票。Residential and commercial construction projects require several organizations to communicate with each other in order to distribute payments. The traditional method of construction payment management is firstly to notify through verbal notice that it can be withdrawn from the project loan or the owner's account. The general contractor (GC) of the construction works notifies the subcontractors (or any other person, firm or company engaged by the GC, such as material suppliers) of such withdrawal by telephone, fax or at a meeting. Subcontractors are to prepare invoices and send them to GC by mail, fax, direct delivery or at a meeting with GC. The GC and the various subcontractors usually have to negotiate the final invoice amount over the phone or in a meeting. The GC validates these invoices, writes the details to the GC engineering billing system, and prepares its own invoices.

只要完成这些发票,GC还手工准备誓词(sworn statement)。在这种誓词中,GC确认由GC聘请的分包商已经执行房地产建筑或维修中的特定服务。在该誓词中,GC还确认给予每一分包商的金额。As soon as these invoices are completed, the GC also prepares the sworn statement by hand. In this affidavit, the GC affirms that subcontractors hired by the GC have performed specific services in the construction or repair of the property. In this affidavit, GC also confirms the amount given to each subcontractor.

GC将生效的誓词转发给产权保险公司(Title company)以及工程贷款贷方和/或业主。贷方、业主或产权保险公司通知监理必须执行房地产的检查并将誓词发送给监理。监理汇编该房地产项目先前的检查报告。监理执行新的检查并手工地定制检查报告。监理通过传真、邮件或直接递送,将检查报告分发给贷方、业主和/或产权保险公司。GC forwards effective affidavit to title company and project loan lender and/or owner. The lender, landlord, or title insurance company notifies the superintendent that an inspection of the property must be performed and an affidavit sent to the superintendent. The supervisor compiles previous inspection reports for the real estate project. Supervisors perform new inspections and manually customize inspection reports. The inspector distributes the inspection report to lenders, homeowners, and/or title insurance companies by fax, mail, or direct delivery.

贷方、业主和/或产权保险公司通过邮件、传真、直接递送或在与GC和/或监理的会议上,接收该誓词和检查报告。贷方、业主和/或产权保险公司必须检索先前的支取和工程文档。贷方、业主和/或产权保险公司通常必须通过电话、传真或在会议上,与GC协商支付额和工程明细。贷方、业主和/或产权保险公司批准该誓词并通过电话、传真或在会议上传送该批准。贷方或房产业主然后批准在誓词中规定的金额的支出。The lender, homeowner, and/or title insurance company receives the affidavit and inspection report by mail, fax, direct delivery, or at a meeting with the GC and/or superintendent. Lenders, homeowners and/or title insurance companies must retrieve prior drawdown and engineering documents. Lenders, homeowners, and/or title insurance companies must usually negotiate payments and project details with the GC by phone, fax, or in a meeting. The lender, homeowner, and/or title insurance company approves the affidavit and transmits the approval by phone, fax, or at a meeting. The lender or property owner then approves the disbursement of the amount specified in the affidavit.

工程贷款贷方或业主的开户银行通常将支付所有分包商所需的资金划拨到托管(escrow)帐户。通常产权保险公司由此把来自托管帐户的资金支付给GC。GC和/或产权保险公司准备用于分包商的支票。此时,分包商通常结束用于从工程贷款资金的先前支取或用于在前一月期间完成的工作的留置权放弃(lien waiver)。因此,用于当前支取或当前月的留置权放弃,直到从工程贷款进行后续支取为止或直到在下一月期间为止才实际释放。另外,分包商可能又有其自己的分包商,在从GC收到支付款后,他们必须支付给他们的分包商。The construction loan lender or the owner's bank usually transfers the funds required to pay all subcontractors into an escrow account. Typically the title insurance company thereby pays the GC funds from the escrow account. GC and/or title insurance company prepare checks for subcontractors. At this point, the subcontractor typically closes a lien waiver for previous drawdowns of project loan funds or for work completed during the preceding month. Thus, the lien for the current drawdown or current month is waived until a subsequent drawdown from the project loan or until during the next month. In addition, subcontractors may have their own subcontractors, and after receiving payment from GC, they must pay their subcontractors.

传统的工程支付方法从口头支取通知的日期到分包商真正收到支付款的日期,会花费90天或更长。传统的工程支付方法通常涉及事件的不可靠口头通知,而该方法的运转要基于这些事件。例如,如果一个分包商难以获得定制发票或提交留置权放弃,会延迟对所有其他分包商的支付过程。Traditional engineering payment methods can take 90 days or more from the date of the verbal withdrawal notice to the date the subcontractor actually receives the payment. Traditional engineering payment methods often involve unreliable verbal notification of events upon which the method operates. For example, if one subcontractor has difficulty obtaining a custom invoice or submitting a lien waiver, it will delay the payment process to all other subcontractors.

传统的工程支付过程还包含巨大的数据录入量。例如,对单一的大施工工程,GC每一月通常必须将上百张发票输入其记帐系统。同时,GC每一月必须收集上百个留置权放弃。另外,GC必须每一月定制、批准、签名和分发上百张支票给分包商。另外,GC必须保存每一支取过程期间所收集的所有纸件文档。支取通知、批准和将留置权放弃兑换支付的期间每月要求上百个传真、电话和会议。The traditional engineering payment process also involves a huge amount of data entry. For example, for a single large construction project, GC usually has to enter hundreds of invoices into its accounting system every month. At the same time, the GC must collect hundreds of lien waivers every month. In addition, GC must customize, approve, sign and distribute hundreds of checks to subcontractors every month. Additionally, the GC must maintain all paper documentation collected during each extraction process. The period of withdrawal notices, approvals, and lien waivers for payment requires hundreds of faxes, phone calls, and meetings each month.

发明内容Contents of the invention

本发明的实施例提供用于管理工程支付过程的系统和方法。实现本发明的一种方法能包括接收用于参与方的注册信息,存储该注册信息,以及通过访问该注册信息,将与施工工程有关的支付划拨给该参与方。Embodiments of the present invention provide systems and methods for managing the project payment process. A method of implementing the invention can include receiving registration information for a party, storing the registration information, and by accessing the registration information, transferring payment related to construction work to the party.

实现本发明的工程支付管理系统能包括存储组织模块和数据库管理系统的应用服务器,该组织模块接收用于参与方的组织注册信息。该系统还包括连接到该数据库管理系统的数据库服务器,该数据库服务器存储该组织注册信息,该数据库管理系统访问该组织注册信息以便将与施工工程有关的支付划拨给该参与方。A project payment management system embodying the present invention can include an application server storing an organization module that receives organization registration information for a participant and a database management system. The system also includes a database server connected to the database management system, the database server storing the organization registration information, the database management system accessing the organization registration information to transfer payment related to the construction work to the party.

实现本发明的另一工程支付管理系统能包括存储组织模块和数据库管理系统的应用服务器,组织模块从参与方接收组织注册信息。该系统还能包括连接到该数据库管理系统的数据库服务器,数据库服务器存储该组织注册信息,数据库管理系统访问该组织注册信息以便将与施工工程有关的支付划拨给该参与方。Another project payment management system embodying the present invention can include an application server storing an organization module and a database management system, the organization module receiving organization registration information from a participant. The system can also include a database server connected to the database management system, the database server storing the organization registration information, the database management system accessing the organization registration information in order to transfer payment related to the construction work to the party.

实现本发明的一种方法能包括建立与施工工程中的多个参与方的通信,生成支取的通知,以及将通知电子地实时传送到多个参与方。A method of implementing the invention can include establishing communications with multiple parties involved in a construction project, generating a notice of withdrawal, and electronically transmitting the notice to the multiple parties in real time.

实现本发明的另一系统能包括存储通知管理器和支取模块的应用服务器,通知管理器和支取模块生成支取通知,通知管理器将该通知按电子方式实时传送到多个参与方。Another system embodying the invention can include an application server storing a notification manager and a withdrawal module that generate withdrawal notifications that the notification manager electronically communicates in real time to a plurality of participants.

本发明的一些实施例包括生成用于施工工程的预算,以及基于该预算,生成至少一个自动发票、自动誓词和至少一个自动留置权放弃。Some embodiments of the invention include generating a budget for construction work, and based on the budget, generating at least one automatic invoice, automatic affidavit, and at least one automatic lien release.

本发明的一个实施例包括从至少一个分包商接收至少一张发票,以及由至少一张发票的每一个,自动地生成总承包商的包括金额的誓词。One embodiment of the invention includes receiving at least one invoice from at least one subcontractor, and automatically generating, from each of the at least one invoice, the general contractor's affidavit including the amount.

实现本发明的另一系统能包括存储预算模块和支取模块的应用服务器,预算模块生成用于施工工程的预算,支取模块基于该预算,生成至少一张自动发票、自动誓词以及至少一个自动留置权放弃。Another system embodying the invention can include an application server storing a budget module that generates a budget for a construction project and a withdrawal module that generates at least one automatic invoice, automatic affidavit, and at least one automatic lien based on the budget give up.

本发明的另一方法包括从施工工程中的参与方接收留置权放弃,存储该留置权放弃,将向该参与方付款的指令传送到支付系统,以及从该支付系统接收该参与方已经收到资金的确认以及基本上同时释放该留置权放弃。Another method of the invention includes receiving a lien waiver from a party in the construction work, storing the lien waiver, transmitting an instruction to pay the party to a payment system, and receiving from the payment system that the party has received Confirmation of funds and substantially simultaneous release of this lien waiver.

本发明的另一方法从施工工程中的参与方接收留置权放弃,以及将支付该参与方的指令传送到支付系统,以及基本上同时释放该留置权放弃。Another method of the present invention receives a lien waiver from a party in the construction work, and transmits an instruction to pay the party to the payment system, and releases the lien waiver substantially simultaneously.

实现本发明的另一系统包括存储电子保管箱和支取模块的应用服务器,电子保管箱接收和存储来自施工工程中的参与方的留置权放弃,支取模块将向该参与方付款的指令传送到支付系统,支取模块从该支付系统接收该参与方已经收到资金的确认,以及基本上同时释放该留置权放弃。Another system embodying the invention includes an application server that stores an electronic safe deposit box that receives and stores a lien waiver from a party in a construction project, and a withdrawal module that transmits instructions to pay the party to the payment system, the withdrawal module receives confirmation from the payment system that the participant has received funds, and substantially simultaneously releases the lien waiver.

本发明的另一方法包括创建用于施工工程的初步预算,包括来自总承包商、至少一个分包商和至少一个材料供应商的至少一个的至少一个辅助预算,至少一个辅助预算分别包括至少一个支出项(lineitem),以及识别该初步预算以及该至少一个辅助预算包括在管理支取前的至少一个支出项。Another method of the present invention includes creating a preliminary budget for the construction work, including at least one auxiliary budget from at least one of the general contractor, at least one subcontractor, and at least one material supplier, the at least one auxiliary budget each including at least one a line item, and identifying that the preliminary budget and the at least one auxiliary budget include at least one line item prior to administrative drawdowns.

实现本发明的软件能包括工程模块,用于创建和管理工程、预算模块,用于创建和维护用于该工程的预算以及支取模块,用于基于该预算,创建、调度和管理用于该工程的支取。Software implementing the invention can include a project module for creating and managing a project, a budget module for creating and maintaining a budget for the project, and a draw module for creating, scheduling and managing budgets for the project based on the budget. withdrawal.

实现本发明的图形用户界面能包括工程时间表进度条、资金支出进度条以及百分比完成进度条的至少一个,该工程时间表进度条表示相对于日期的进度,资金支出进度条表示相对于预算金额的进度,以及百分比完成进度条表示相对于施工工程完成的工作的百分比。A graphical user interface embodying the invention can include at least one of a project timeline progress bar representing progress relative to a date, a capital expenditure progress bar representing progress relative to a budgeted amount, and a percentage completion progress bar progress, and percent complete The progress bar represents the percentage of work that is done relative to the construction work.

附图说明Description of drawings

图1是根据本发明的一个实施例的施工支付管理系统的示意图。Fig. 1 is a schematic diagram of a construction payment management system according to an embodiment of the present invention.

图2是能使用图1的系统执行的施工支付管理过程的示意图。FIG. 2 is a schematic diagram of a construction payment management process that can be performed using the system of FIG. 1 .

图3是管理工程过程的示意图。Figure 3 is a schematic diagram of the management engineering process.

图4是管理组织过程的示意图。Figure 4 is a schematic diagram of the management organization process.

图5是管理支取过程的示意图。Fig. 5 is a schematic diagram of the management withdrawal process.

图6是管理更改订单过程的示意图。Figure 6 is a schematic diagram of the process of managing change orders.

图7是管理系统环境任务的示意图。Fig. 7 is a schematic diagram of managing system environment tasks.

图8是创建组织过程的示意图。Figure 8 is a schematic diagram of the process of creating an organization.

图9是创建组织表单(form)的例图。Fig. 9 is an illustration of creating an organization form (form).

图10是更新用户系统通知的例图。Figure 10 is an illustration of an update user system notification.

图11是系统通知的例图。Fig. 11 is an illustration of a system notification.

图12是编辑组织表单的例图。Figure 12 is an illustration of the edit organization form.

图13是启动组织通知的例图。Figure 13 is an illustration of an activation organization notification.

图14是启动组织表单的例图。Figure 14 is an illustration of the start organization form.

图15是组织启动的通知的例图。Figure 15 is an illustration of an organization initiated notification.

图16是组织停用通知的例图。Figure 16 is an illustration of an organization deactivation notification.

图17是维护组织过程的示意图。Figure 17 is a schematic diagram of the maintenance organization process.

图18是查看组织屏的例图。Figure 18 is an illustration of the view organization screen.

图19是浏览组织屏的例图。Figure 19 is an illustration of the browse organization screen.

图20是编辑组织表单的例图。Figure 20 is an illustration of the edit organization form.

图21是组织配置文件更新通知的例图。Figure 21 is an illustration of an organization profile update notification.

图22是创建用户过程172的示意图。FIG. 22 is a schematic diagram of the create user process 172 .

图23是创建用户表单的例图。Figure 23 is an example of creating a user form.

图24是更新用户配置文件通知的例图。Figure 24 is an illustration of an update user profile notification.

图25是维护用户过程的示意图。Figure 25 is a schematic diagram of the maintenance user process.

图26是查看用户屏的例图。Figure 26 is an illustration of the view user screen.

图27是浏览用户屏的例图。Figure 27 is an illustration of the browse user screen.

图28是编辑用户表单的例图。Figure 28 is an illustration of an edit user form.

图29是用户配置文件更新通知的例图。Figure 29 is an illustration of a user profile update notification.

图30是创建工程过程的示意图。Fig. 30 is a schematic diagram of the process of creating a project.

图31和32是创建工程表单的例图。Figures 31 and 32 are examples of creating project forms.

图33是工程创建通知的例图。Fig. 33 is an illustration of a project creation notification.

图34是工程用户访问屏的例图。Figure 34 is an illustration of an engineering user access screen.

图35是工程责任通知的例图。Figure 35 is an illustration of an Engineering Responsibility Notice.

图36是维护预算过程的示意图。Figure 36 is a schematic diagram of the maintenance budget process.

图37是进入顶级预算表单的例图。Figure 37 is an example of entering the top-level budget form.

图38是进入支取日期表单的例图。Figure 38 is an illustration of the Enter Withdrawal Date form.

图39是发票代码建立表单的例图。Figure 39 is an illustration of the invoice code creation form.

图40是分配发票代码表单的例图。Figure 40 is an illustration of the Assign Invoice Code form.

图41是接收工程通知的例图。Fig. 41 is an illustration of receiving engineering notices.

图42是接收工程表单的例图。Fig. 42 is an illustration of a receiving engineering form.

图43是工程拒收通知的例图。Figure 43 is an illustration of a project rejection notice.

图44是工程接收通知的例图。Fig. 44 is an illustration of an engineering acceptance notice.

图45是工程主页的例图。Fig. 45 is an illustration of the project home page.

图46是添加用户通知的例图。Figure 46 is an illustration of adding a user notification.

图47是工程用户访问表单的例图。Figure 47 is an illustration of an engineering user access form.

图48是工程责任通知的例图。Figure 48 is an illustration of an Engineering Responsibility Notice.

图49是工程预算查看屏的例图。Figure 49 is an illustration of a project budget viewing screen.

图50是输入预算表单的例图。Fig. 50 is an illustration of an input budget form.

图51是终止预算项过程的示意图。Figure 51 is a schematic diagram of the process of terminating a budget line.

图52是进入顶级预算表单的例图。Figure 52 is an illustration of entering the top-level budget form.

图53是终止预算屏的例图。Figure 53 is an illustration of the Termination Budget screen.

图54是支取过程的示意图。Figure 54 is a schematic diagram of the withdrawal process.

图55是创建计划支取通知的例图。Figure 55 is an illustration of creating a plan withdrawal notification.

图56是初始支取表单的例图。Figure 56 is an illustration of an initial withdrawal form.

图57是输入发票通知的例图。Figure 57 is an illustration of entering an invoice notification.

图58是输入发票表单的例图。Figure 58 is an illustration of the input invoice form.

图59是签名发票通知的例图。Figure 59 is an illustration of a signed invoice notification.

图60是签名发票表单的例图。Figure 60 is an illustration of a signed invoice form.

图61是发票细目更新通知的例图。Fig. 61 is an illustration of an invoice detail update notification.

图62是查看未决支取请求屏的例图。Figure 62 is an illustration of the View Pending Withdrawal Requests screen.

图63是发票细目拒绝通知的例图。Figure 63 is an illustration of an invoice line rejection notification.

图64是未包括在支取通知中的发票的例图。Figure 64 is an illustration of an invoice not included in a withdrawal notice.

图65是自动生成的发票表单的例图。Figure 65 is an illustration of an automatically generated invoice form.

图66是誓词表单的例图。Figure 66 is an illustration of an affidavit form.

图67是使资金可用通知的例图。Figure 67 is an illustration of a Make Funds Available Notification.

图68是查看支取请求屏的例图。Figure 68 is an illustration of the view withdrawal request screen.

图69是签名留置权放弃通知的例图。Figure 69 is an illustration of a signature lien waiver notice.

图70是留置权放弃表单的例图。Figure 70 is an illustration of a lien waiver form.

图71是留置权放弃签名通知的例图。Figure 71 is an illustration of a signed notice of lien waiver.

图72是查看支取请求屏的例图。Figure 72 is an illustration of the view withdrawal request screen.

图73是所有留置权放弃签名通知的例图。Figure 73 is an illustration of all lien waiver signed notices.

图74是查看支取请求表单的例图。Figure 74 is an illustration of viewing a withdrawal request form.

图75是支付支出通知的例图。Figure 75 is an illustration of a payment disbursement notification.

图76是维护系统屏任务的示意图。Figure 76 is a schematic diagram of maintenance system screen tasks.

图77是维护阶段码表单的例图。Figure 77 is an illustration of a maintenance stage code form.

图78是管理使用注册屏的例图。Fig. 78 is an illustration of the management usage registration screen.

图79是添加/编辑参数选用表表单的例图。Figure 79 is an illustration of the Add/Edit Picklist form.

图80是添加/编辑组织角色表单的例图。Figure 80 is an illustration of the Add/Edit Organization Role form.

图81是默认/配置设定值表单的例图。Figure 81 is an illustration of the Default/Configuration Settings form.

图82是编辑通知表单的例图。Fig. 82 is an illustration of the edit notification form.

图83是默认/配置过程表单的例图。Figure 83 is an illustration of the Default/Configuration Process Form.

图84是添加/编辑用户任务表单的例图。Figure 84 is an illustration of the Add/Edit User Task form.

图85是执行检查过程和相关任务的示意图。Fig. 85 is a schematic diagram of performing an inspection process and related tasks.

图86是准备实施检查通知的例图。Fig. 86 is an illustration of a notification of preparation for inspection.

图87是检查所需通知的例图。Fig. 87 is an illustration of checking required notification.

图88是所需检查屏的例图。Figure 88 is an illustration of the required inspection screen.

图89是输入检查报告通知的例图。Fig. 89 is an illustration of input inspection report notification.

图90是输入检查报告表单的例图。Fig. 90 is an illustration of an input inspection report form.

图91是检查报告表单屏的例图。Fig. 91 is an illustration of an inspection report form screen.

图92是检查报告失败通知的例图。Figure 92 is an illustration of an inspection report failure notification.

图93是查看先前检查屏的例图。Figure 93 is an illustration of the view previous check screen.

图94是认可支取请求过程的示意图。Fig. 94 is a schematic diagram of a process for approving a withdrawal request.

图95是授权支取请求一表单的例图。Figure 95 is an illustration of a form authorizing a withdrawal request.

图96是授权支取请求一拒绝通知的例图。Figure 96 is an illustration of an authorized withdrawal request-rejection notification.

图97是检查确认通知的例图。Fig. 97 is an example of a check confirmation notification.

图98是支取细目修改通知的例图。Figure 98 is an illustration of a withdrawal detail modification notice.

图99是检查认可通知的例图。Fig. 99 is an illustration of an inspection approval notification.

图100是授权支取请求二通知的例图。Figure 100 is an illustration of an authorized withdrawal request two notification.

图101是授权支取请求二表单的例图。Figure 101 is an illustration of the second form of authorization withdrawal request.

图102是授权支取请求二拒绝通知的例图。Fig. 102 is an illustration of the rejection notification of the authorized withdrawal request 2.

图103是授权支取请求二许可通知的例图。Fig. 103 is an illustration of authorization notification of withdrawal request 2.

图104是发出留置权放弃通知的例图。Figure 104 is an illustration of issuing a lien waiver notice.

图105是改变请求过程的示意图。Figure 105 is a schematic diagram of a change request process.

图106是改变请求表单的例图。Figure 106 is an illustration of a change request form.

图107是改变请求发出通知的例图。Figure 107 is an illustration of change request notification.

图108是授权改变请求通知的例图。Figure 108 is an illustration of an authorization change request notification.

图109是过程改变请求过程的示意图。Fig. 109 is a schematic diagram of a process change request process.

图110是查看未决改变请求屏的例图。Figure 110 is an illustration of the View Pending Change Requests screen.

图111是授权改变请求表单的例图。Figure 111 is an illustration of an authorization change request form.

图112是改变请求拒绝通知的例图。Figure 112 is an illustration of a change request rejection notification.

图113是改变请求许可通知的例图。Fig. 113 is an illustration of change request permission notification.

图114是改变工程参与方过程的示意图。Figure 114 is a schematic diagram of the process of changing project participants.

图115是改变参与方屏的例图。Figure 115 is an illustration of the Change Party screen.

图116是支取参与方删除屏的例图。Figure 116 is an illustration of a withdrawal participant deletion screen.

图117是更改誓言书(affidavit)屏的例图。Figure 117 is an illustration of the Change Affidavit screen.

图118是维护工程屏任务的示意图。Figure 118 is a schematic diagram of maintenance engineering screen tasks.

图119是工程配置文件表单的例图。Figure 119 is an illustration of the project configuration file form.

图120是工程承包信息屏的例图。Fig. 120 is an illustration of an engineering contract information screen.

图121是工程信息屏的例图。Fig. 121 is an illustration of a project information screen.

图122是关闭工程屏的例图。Figure 122 is an example of closing the engineering screen.

图123是管理访问屏任务的示意图。Figure 123 is a schematic diagram of a task in the management access screen.

图124是注册屏的例图。Fig. 124 is an illustration of a registration screen.

图125是注销屏的例图。Figure 125 is an illustration of a logout screen.

图126是工程主页屏的例图。Figure 126 is an illustration of the Project home screen.

图127是复位密码屏的例图。Figure 127 is an illustration of the reset password screen.

图128是用于特定用户的主屏的例图。Figure 128 is an illustration of a home screen for a specific user.

图129是浏览工程屏的例图。Figure 129 is an example of the browse project screen.

图130是遗忘密码屏的例图。Figure 130 is an illustration of the Forgot Password screen.

图131是你的密码通知的例图。Figure 131 is an example of your password notification.

图132是管理消息屏过程的示意图。Fig. 132 is a schematic diagram of the process of managing a message screen.

图133是查看消息屏的例图。Fig. 133 is an illustration of the view message screen.

图134是由用户查看的特定消息的例图。Figure 134 is an illustration of a particular message viewed by a user.

图135是创建/发送消息屏的例图。Figure 135 is an illustration of the Create/Send Message screen.

图136是状态消息屏的例图。Figure 136 is an illustration of a status message screen.

图137-153是示例说明管理根据本发明的另一实施例的工程支付过程的方法的流程图。137-153 are flowcharts illustrating a method of managing a project payment process according to another embodiment of the present invention.

图154-179是示例说明管理根据本发明的另一实施例的工程支付过程的方法的输入/输出图。154-179 are input/output diagrams illustrating a method of managing a project payment process according to another embodiment of the present invention.

具体实施方式Detailed ways

在详细地说明本发明的任何实施例前,应该理解本发明不将其应用限制到在下面的描述中所阐述或在图中例示的施工的细节和部件的排列上。本发明还有其他实施例并能以各种方式实施或执行。同时,将理解到在此使用的措辞和术语用于描述目的,而不应当视为限制。使用“包括”、“由..组成”或“具有”以及其变形意指包含此后列出的项及其等效,以及另外的项。广泛使用术语“安装”、“连接”和“耦合”以及包含直接和间接安装、连接和耦合。另外,“连接”和“耦合”不限制到物理或组织连接或耦合,并可包括电连接或耦合,不管是直接还是间接。同时,电通信和通知可以使用任何已知手段,包括直接连接、无线连接等等执行。Before any embodiment of the invention is described in detail, it is to be understood that the invention is not limited in application to the details of construction and arrangement of parts set forth in the following description or illustrated in the drawings. The invention is still capable of other embodiments and of being practiced or carried out in various ways. Also, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be regarded as limiting. The use of "comprising", "consisting of" or "having" and variations thereof is meant to encompass the items listed thereafter and equivalents thereof, as well as additional items. The terms "mounted", "connected" and "coupled" are used broadly and include direct and indirect mounting, connection and coupling. Additionally, "connected" and "coupled" are not limited to physical or organizational connections or couplings, and may include electrical connections or couplings, whether direct or indirect. Meanwhile, electronic communication and notification may be performed using any known means including direct connection, wireless connection, and the like.

应注意到可以利用基于设备的多种硬件和软件,以及多个不同结构部件来实现本发明。此外,以及如在后续段落中所述,在附图中例示的具体结构是用于例示本发明的实施例,而其他另外的结构也是可能的。It should be noted that the present invention can be implemented using a variety of hardware and software based devices, as well as a number of different structural components. Furthermore, and as described in subsequent paragraphs, the specific structures illustrated in the drawings are intended to illustrate embodiments of the invention, and other additional structures are possible.

图1示例说明根据本发明的一个实施例的工程支付管理系统(CPMS)10。CPMS 10能包括应用服务器12、数据库服务器14、应用逻辑模块16、web服务器18、网络20(诸如互联网或单独的或与互联网结合的其他网络)、验证服务22、参与组织或个人24(在下文中,“参与方”或“组织”)以及支付系统26。支付系统26能包括自动结算中心(ACH)系统、电汇系统、借记卡系统、信用卡系统或任何其他适当的电子转帐(EFT)系统。Figure 1 illustrates a project payment management system (CPMS) 10 according to one embodiment of the present invention. The CPMS 10 can include an application server 12, a database server 14, an application logic module 16, a web server 18, a network 20 (such as the Internet or other networks alone or in combination with the Internet), an authentication service 22, participating organizations or individuals 24 (hereinafter , "participant" or "organization") and payment system 26. Payment system 26 can include an automated clearing house (ACH) system, a wire transfer system, a debit card system, a credit card system, or any other suitable electronic funds transfer (EFT) system.

应用服务器12能存储和提供对工程模块28、表单处理模块30、许可和授权引擎32、数据库管理系统34、预算模块36、访问管理器38、通知管理器40、组织模块42、支取模块44、承包模块46、更改订单模块48、用户模块50、系统环境管理器52和电子保管箱/托管54的访问。支取模块44能包括核心模块56、检查模块58和支取准许模块60、系统环境管理器52能包括报告生成器62、帮助模块65和系统维护模块66。电子保管箱/托管54能存储一个或多个留置权放弃68。应理解,可以按相对于图1所示和所述不同的方式,组合应用服务器12的部件。能以任何适当方式组合或分离用来编码应用服务器12的各个模块、管理器和引擎的软件以及能以任何适当方式存储和访问。The application server 12 can store and provide access to the engineering module 28, the form processing module 30, the permission and authorization engine 32, the database management system 34, the budget module 36, the access manager 38, the notification manager 40, the organization module 42, the withdrawal module 44, Access to Contracting Module 46 , Change Order Module 48 , User Module 50 , System Environment Manager 52 , and E-Deposit Box/Escrow 54 . The withdrawal module 44 can include a core module 56 , a check module 58 and a withdrawal authorization module 60 , and the system environment manager 52 can include a report generator 62 , a help module 65 and a system maintenance module 66 . Electronic safe deposit box/escrow 54 can store one or more lien waivers 68 . It should be understood that components of the application server 12 may be combined in different ways relative to those shown and described in FIG. 1 . The software encoding the various modules, managers and engines of application server 12 can be combined or separated and stored and accessed in any suitable manner.

应用服务器12能连接到数据库服务器14、应用逻辑模块16和验证服务22。然而,在一些实施例中,验证服务22可以仅连接到网络20。应用逻辑模块16能连接到web服务器18,或在一些实施例中,直接连接到网络20。Web服务器18能连接到网络20。Application server 12 can connect to database server 14 , application logic module 16 and authentication service 22 . However, in some embodiments, authentication service 22 may only be connected to network 20 . Application logic module 16 can be connected to web server 18 or, in some embodiments, directly to network 20 . Web server 18 is connectable to network 20 .

参与方24能包括业主70(和/或业主代表72)、总承包商(GC)74、监理76、一个或多个分包商(分包商A 78、分包商B 80等等)、一个或多个材料供应商82、一个或多个贷方84(和/或一个或多个信贷员86)、一个或多个产权保险公司86,以及一个或多个建筑师88。参与方24也能包括一个或多个室内设计者(和/或家具制造商)和一个或多个不动产业主(即将工地出售给业主70的土地业主)。参与方24能包括视为“线上”(即在施工过程中高于GC)或“线下”(即由GC雇佣)的组织和/或个人。线上的参与方24能包括贷方、建筑师、室内设计者、业主、业主代表、产权保险公司和不动产业主。线下的参与方24能包括分包商和材料供应商。CPMS 10能用来便于这些类型的参与方,不管是GC的线上或下的任何之间的工程支付过程。CPMS10通常在此描述成用来便于GC和分包商之间的支付。然而,应理解,CPMS 10能用来便于任何类型的参与方之间的支付,不仅是GC和分包商之间。The parties 24 can include the owner 70 (and/or the owner's representative 72), a general contractor (GC) 74, a supervisor 76, one or more subcontractors (Subcontractor A 78, Subcontractor B 80, etc.), One or more material suppliers 82 , one or more lenders 84 (and/or one or more loan officers 86 ), one or more title insurance companies 86 , and one or more architects 88 . The parties 24 can also include one or more interior designers (and/or furniture manufacturers) and one or more real estate owners (ie, land owners who sell the site to the owner 70). Parties 24 can include organizations and/or individuals considered "online" (ie, above the GC during construction) or "offline" (ie, employed by the GC). Online parties 24 can include lenders, architects, interior designers, homeowners, homeowner representatives, title insurance companies, and real estate owners. Offline parties 24 can include subcontractors and material suppliers. The CPMS 10 can be used to facilitate the project payment process between any of these types of parties, whether online or offline for the GC. CPMS 10 is generally described herein as being used to facilitate payments between GCs and subcontractors. However, it should be understood that the CPMS 10 can be used to facilitate payments between any type of parties, not just between GCs and subcontractors.

除将参与方划分成GC的线上或线下外,能将与施工过程有关的成本划分成“软”成本或“硬”成本。软成本能包括监理费、建筑师费、室内设计费、产权保险公司费、许可费、用于施工过程期间的房地产的水电费帐单、家具成本、音频/视频设备、计算机等等。硬成本能包括由GC雇佣的组织或个人产生的所有成本,包括用于由GC雇佣的分包商和材料供应商的所有成本。每一施工工程能包括整体预算(从业主的观点看),包括所有软和硬成本。每一施工工程还能包括GC预算。CPMS 10能用来方便整体预算和GC预算内所进行的所有支付。然而,在本发明的一些实施例中,CPMS 10可只用来方便由GC管理的硬成本的支付(即,仅GC预算)。本领域的普通技术人员应理解到CPMS 10能用来仅对于GC的硬成本、仅对GC的线上的参与方的软成本,或GC的线上和下的参与方的硬和软成本的组合来方便支付。在此,通常相对于硬成本来描述CPMS 10,但也可以用于软成本或硬和软成本的组合。In addition to dividing the parties into GC's online or offline, the costs related to the construction process can be divided into "soft" costs or "hard" costs. Soft costs can include superintendent fees, architect fees, interior design fees, title insurance company fees, permit fees, utility bills for the property during the construction process, furniture costs, audio/video equipment, computers, and the like. Hard costs can include all costs incurred by organizations or individuals employed by the GC, including all costs for subcontractors and material suppliers employed by the GC. Each construction project can include an overall budget (from the owner's point of view), including all soft and hard costs. Each construction project can also include a GC budget. CPMS 10 can be used to facilitate all payments made within the overall budget and GC budget. However, in some embodiments of the invention, the CPMS 10 may only be used to facilitate payment of hard costs managed by the GC (i.e., GC budget only). Those of ordinary skill in the art will appreciate that the CPMS 10 can be used to measure only the hard costs of the GC, only the soft costs of the GC's online parties, or both the hard and soft costs of the GC's online and offline parties. Combination to facilitate payment. Here, CPMS 10 is generally described with respect to hard costs, but can also be used for soft costs or a combination of hard and soft costs.

参与方24的每一个能连接到支付系统26。然而,在本发明的一些实施例中,一些参与方24可以不连接到支付系统26。在一些实施例中,支付系统26能包括具有一个或多个发起信托金融机构(ODFI)和一个或多个接收信托金融机构(RDFI)。Each of the parties 24 can be connected to a payment system 26 . However, some participants 24 may not be connected to the payment system 26 in some embodiments of the invention. In some embodiments, payment system 26 can include one or more originating trusted financial institutions (ODFIs) and one or more receiving trusted financial institutions (RDFIs).

参与方24能访问应用服务器12以便使用各个模块、管理器和引擎来执行根据本发明的几个实施例的工程支付管理方法。The parties 24 have access to the application server 12 in order to use the various modules, managers and engines to execute the project payment management method according to several embodiments of the present invention.

在一些实施例中,CPMS 10能将所有工程参与方连接到基本上统一的、基于Web的实时系统,能组织该施工工程的预算,能便于发票的电子提交和准许,以及能通过使用电子支付和匹配电子留置权放弃释放产品,自动化和简化支付和留置权放弃释放过程。In some embodiments, the CPMS 10 can connect all project participants to a substantially unified, real-time, web-based system, can organize budgets for the construction project, can facilitate electronic submission and approval of invoices, and can and matching electronic lien waiver release products that automate and simplify the payment and lien waiver release process.

尽管在细节上可有各种变化(例如在公众融资工程中,通过担保发行人,而不是银行,进行工程的启动和监督),CPMS 10的一个实施例可以使用如下。信贷员能注册到互联网上,以及进入CPMS网站。在安全许可后,信贷员能进入贷方的公文夹,以及访问一系列屏幕来通过输入所有工程明细创建新工程。信贷员能包括用于每一工程的参与方的明细,例如业主、建筑师、总承包商和产权保险公司。每一参与方能接收包含在工程中的电子邮件通知以及能验证他们的配置文件明细。GC能添加分包商和材料供应商。分包商和材料供应商能接收将他们添加到该工程的通知以及能经历安全和验证过程。GC能选择用于该工程的支取数和支取日期。CPMS 10能实时通知参与方未决支取日期。每一参与方能通过输入他们的材料和劳动清单明细,完成他们的支取请求。GC能评审支取请求并对其授权,以及CPMS 10能生成誓词。随之进行一系列工程现场检查、核准、留置权放弃的完成、声明(statement)的生成等等,所有这些由CPMS 10通过实时电子邮件通知来提示。只要完成和验证所有表单,CPMS 10就能方便支付。能通过电子支付系统,将支付款直接存入参与方的银行帐号。对所有支取,重复该过程。通过支付额的完成、留置权放弃收取和核准检查,使工程预算保持平衡。利用形进度指示器可通过CPMS 10跟踪工程进度。While variations in details are possible (eg, in a public finance project, the project is initiated and supervised by the security issuer, rather than the bank), one embodiment of the CPMS 10 can be used as follows. Loan officers can log on to the Internet and access the CPMS website. After security clearance, the loan officer can access the lender's portfolio and access a series of screens to create a new project by entering all project details. The loan officer can include details of the parties involved for each project, such as the owner, architect, general contractor, and title insurance company. Each party can receive email notifications of inclusion in the project and can verify their profile details. GC can add subcontractors and material suppliers. Subcontractors and material suppliers can receive notification of their addition to the project and can go through the safety and verification process. The GC can choose the withdrawal amount and withdrawal date for the project. CPMS 10 can notify participants of the pending withdrawal date in real time. Each party can complete their withdrawal request by entering their bill of materials and labor details. The GC can review and authorize withdrawal requests, and the CPMS 10 can generate pledges. A series of engineering site inspections, approvals, completion of lien waivers, generation of statements, etc. follow, all prompted by the CPMS 10 via real-time email notifications. CPMS 10 facilitates payments as long as all forms are completed and verified. The payment can be directly deposited into the bank account of the participant through the electronic payment system. Repeat the process for all withdrawals. Balance the project budget through the completion of payments, lien waiver collection, and approval checks. Project progress can be tracked through CPMS 10 using the graphical progress indicator.

CPMS 10能包括下述特征:组织加入CPMS 10的一次性注册、支取的实时通知、自动发票生成、自动誓词、自动留置权放弃生成、协调支付/留置权放弃释放以及将资金直接分配给参与组织。CPMS 10 can include the following features: one-time registration of organizations joining CPMS 10, real-time notification of disbursements, automatic invoice generation, automatic affidavits, automatic lien waiver generation, coordinated payment/lien waiver release, and direct distribution of funds to participating organizations .

参与组织到CPMS 10的一次性注册能降低参与服务的成本,因为参与方必须仅注册一次。一次性注册还降低潜在错误的数量,因为输入必须一次完成。这使得潜在参与方将事实上参与更可能,以及当他们进行该操作时,他们将具有好的(无错误)结果。一次性注册有助于确保希望参与该过程的对方和使用该过程的在线团体仅需要注册一次,便能参与通过CPMS 10执行其支付的任一工程。CPMS 10能通过一次性俘获组织和个人信息,创建便于随时间参与多个工程的过程的稳定团体,提高使组织加入工程支付过程的注册的效率。该方法允许组织使用CPMS 10,注册为由商业界的成员启动的任一工程中的潜在的参与方。除参与多个工程的价值外,一次性注册对参与方访问有关多个GC、业主、贷方、分包商等等的信息有用。例如,一次性注册为业主、贷方和GC提供通过CPMS 10了解新的分包商的机会。同时,具有多个未决工程,分别通过不同的GC而具有几个工程的业主能访问有关每一个GC的信息。One-time registration of participating organizations to CPMS 10 can reduce the cost of participating services, because participants must only register once. One-time registration also reduces the number of potential errors because the entry must be done in one go. This makes it more likely that potential parties will actually participate, and when they do, they will have good (error-free) outcomes. The one-time registration helps to ensure that counterparties wishing to participate in the process and online groups using the process only need to register once to participate in any project for which payment is performed through CPMS 10 . CPMS 10 can create a stable group that can participate in the process of multiple projects over time by capturing organizational and personal information at one time, and improve the efficiency of registration for organizations to participate in the project payment process. This approach allows organizations to use the CPMS 10 to register as potential participants in any project initiated by members of the business community. In addition to the value of participating in multiple projects, a single registration is useful for participants to access information about multiple GCs, owners, lenders, subcontractors, and so on. For example, a one-time registration provides owners, lenders, and GCs the opportunity to learn about new subcontractors through CPMS 10. Also, an owner with several projects pending through different GCs can access information about each GC.

支取的实时通知有助于确保支取中的所有参与方1)及时地和按统一的方式被告知,以及2)具有提供支付所需的信息的模板。CPMS 10有助于消除延迟支付过程的错误(未得到通知或弄错该请求来自哪一工程)。CPMS 10通过为GC提供在CPMS 10上维护支取时间表的选择,通过降低通知支取的参与方的工作,通过自动化构建用于支取的参与方的列表的过程,通过一旦宣布就自动通知支取的支取参与方,通过提供易于访问的链接,来提高支取过程的实时通知的效率,以使得分包商能访问CPMS 10来提交该支取所需的文档。Real-time notification of withdrawals helps to ensure that all parties involved in a withdrawal 1) are notified in a timely and consistent manner, and 2) have a template to provide the information required for payment. CPMS 10 helps eliminate errors that delay the payment process (not being notified or mistaking which project the request came from). CPMS 10 by providing the GC with the option to maintain a withdrawal schedule on CPMS 10, by reducing the effort of notifying parties involved in withdrawals, by automating the process of building a list of parties for withdrawals, by automatically notifying withdrawals of withdrawals once announced Participant, to improve the efficiency of real-time notification of the withdrawal process by providing an easily accessible link to enable subcontractors to access the CPMS 10 to submit the documents required for the withdrawal.

能由业主、业主代表、贷方、GC或产权保险公司使用CPMS 10以便创建和维护工程预算。如上所述,工程预算能包括GC的线上的软成本、GC的线下的硬成本,或硬和软成本的组合。也能使用CPMS 10的一些实施例来创建和管理修改预算(通常通过扩充预算)的更改订单以及由适当的参与方核准所修改的预算。预算能包括用于该施工工程的总成本,以及用于必须执行来完成施工工程的每一阶段或作业的项目成本。CPMS 10能构造预算以便于分包商的支付,允许有效进度跟踪,以及允许自动开发票。CPMS 10 can be used by owners, owner representatives, lenders, GCs or title insurance companies to create and maintain project budgets. As noted above, the project budget can include soft costs for the GC online, hard costs for the GC offline, or a combination of hard and soft costs. Some embodiments of the CPMS 10 can also be used to create and manage change orders that modify budgets (usually by augmenting the budget) and approval of the modified budgets by the appropriate parties. The budget can include the total cost for the construction project, as well as project costs for each phase or activity that must be performed to complete the construction project. CPMS 10 can structure budgets to facilitate payment of subcontractors, allow efficient progress tracking, and allow automatic invoicing.

CPMS 10能创建精确地对应于工程预算以及也精确地对应于留置权放弃和誓词的自动发票。CPMS 10能在相对于整体工程预算上已经产生的活动时,创建作为快照的自动发票。能使用CPMS 10来创建精确地对应于整体预算中支出项的自动发票。这导致与为金融目的、跟踪目的等而分解施工工程的方式一致的发票和报告。使用CPMS 10,能使用发票屏来俘获创建发票所需的信息,然而,并非创建发票所需的所有信息必须重新输入,因为能通过引用整体工程预算来收集信息。这也保证发票(以及G702/703文档)将与整体工程预算一致,以及在支取期间,或在任何其他时间周期间将是一致的(除非参与方,诸如业主希望修改发票)。CPMS 10也能用来根据贷方、业主、业主的代表、GC等等的需求,定制自动发票(或G702/703文档)。CPMS 10 can create automated invoices that correspond precisely to project budgets and also to lien waivers and affidavits. CPMS 10 can create automatic invoices as snapshots at the time of activity that has occurred relative to the overall project budget. CPMS 10 can be used to create automated invoices that correspond exactly to expenditure items in the overall budget. This results in invoices and reports consistent with the way construction work is broken down for financial purposes, tracking purposes, and the like. With CPMS 10, the invoice screens can be used to capture the information needed to create an invoice, however not all the information needed to create an invoice has to be re-entered as the information can be gathered by referencing the overall project budget. This also ensures that the invoice (and G702/703 document) will be consistent with the overall project budget, and will be consistent during drawdown, or any other time period (unless a party, such as the owner, wishes to modify the invoice). CPMS 10 can also be used to customize automated invoices (or G702/703 documents) according to the needs of lenders, owners, owners' representatives, GCs, etc.

能使用预算和自动发票来统一收集和连续地引用在整个工程支付管理过程中将使用的信息。所收集的信息在支付过程中不必再次重新输入,有助于确保不引入错误(击键或由于数据的误解)。通常,参与方对使用CPMS 10实施的支付过程具有可视性。这有助于降低确定工程状态和理解每一参与方必须做什么工作所需的努力,便于支付过程。也有助于高亮显示可能惯于引起过程中延迟或错误的组织或个人,使得更容易纠正该行为或清除该参与方。精确的发票最小化了发票评审和解决问题的劳动,促进了完整和精确的誓词,最小化誓词和检查间的差异,并使得及时支付。CPMS 10能通过以及时方式俘获完整和一致的发票信息,提高在工程支付过程中稍后几个活动的效率。Estimates and automated invoicing can be used to centrally collect and continuously reference information that will be used throughout the project payment management process. The information collected does not have to be re-entered again during the payment process, helping to ensure that errors are not introduced (keystrokes or due to misinterpretation of data). Typically, participating parties have visibility into the payment process implemented using the CPMS 10. This helps reduce the effort required to determine the status of the project and understand what work each party must do, facilitating the payment process. It is also helpful to highlight organizations or individuals that may habitually cause delays or errors in the process, making it easier to correct that behavior or weed out that party. Accurate Invoices minimizes invoice review and problem-solving labor, facilitates complete and accurate affidavits, minimizes discrepancies between affidavits and inspections, and enables timely payments. CPMS 10 can improve the efficiency of several activities later in the project payment process by capturing complete and consistent invoice information in a timely manner.

CPMS 10能用来生成自动誓词和自动留置权放弃。使用CPMS 10,GC知道通知谁支取以及谁通过提供发票来响应。只要由GC(和必须核准发票的GC的线上的任何其他参与方,诸如业主、业主的代表、贷方、产权保险公司等等)核准发票,CPMS 10能使用核准的发票来自动生成誓词和留置权放弃。CPMS 10能由分包商和材料供应商提交的发票,自动地生成誓词和留置权放弃,有助于确保不引入印刷错误,并且誓词和留置权放弃将仅包括已经由分包商和材料供应商提交的支出项。CPMS 10能通过在发票上写上已经在系统中存储的细目以便自动创建誓词和留置权放弃的内容,帮助降低誓词和留置权放弃中的不准确风险。该处理有助于消除可能由于抄写期间可能出现的不标准、不兼容和不适当发票和印刷错误。总的来说,这通过增加关键施工工程信息的精度并及时降低工程支付过程的风险指标。CPMS 10能根据施工现场所处的状态的法定标准,创建自动留置权放弃。CPMS 10 can be used to generate automatic affidavits and automatic lien releases. Using CPMS 10, the GC knows who to notify for withdrawal and who responds by providing an invoice. As long as the invoice is approved by the GC (and any other party on the GC's line that must approve the invoice, such as the owner, owner's representative, lender, title insurance company, etc.), CPMS 10 can use the approved invoice to automatically generate affidavits and liens Right to waive. CPMS 10 can automatically generate affidavits and lien waivers for invoices submitted by subcontractors and material suppliers, helping to ensure that typographical errors are not introduced, and that affidavits and lien waivers will only include invoices that have been submitted by subcontractors and material suppliers Expenditure items submitted by vendors. CPMS 10 can help reduce the risk of inaccuracy in affidavits and lien waivers by overwriting invoices with details already stored in the system to automatically create affidavits and lien waivers. This process helps eliminate non-standard, incompatible and inappropriate invoicing and typographical errors that may occur during transcription. Collectively, this reduces risk indicators for the project payment process in a timely manner by increasing the accuracy of key construction project information. CPMS 10 can create automatic lien releases based on statutory criteria for the state of the construction site.

CPMS 10能生成精确地对应于发票的誓词。进行工作的某类工人(例如电工、管道工等等)常常弄坏发票,同时进行该工作的参与方(例如GC、分包商和材料供应商)常常弄坏誓词。能使用CPMS 10来确保发票总额等于誓词的总额。同时,也能使用CPMS 10来确保留置权放弃的金额等于发票的金额,因为由已经在CPMS 10中存储的核准发票,收集用于自动留置权放弃的信息。另外,留置权放弃将与誓词一致,因为使用来自核准发票的信息,由CPMS 10生成誓词。当GC和分包商(或业主、贷方和GC)已经在一段时间争论发票金额和协商最终金额时,这特别有用。在CPMS 10中存储的自动和核准发票中,反映最终金额,并用来生成留置权放弃和誓词。CPMS 10确保在留置权放弃和誓词文档中,仅反映核准的发票。也通过将所存储的预算用作所有自动文档的框架,CPMS 10进一步确保发票、留置权放弃和誓词将是精确和一致的。CPMS 10也能用来基于贷方、业主、业主的代表、GC等等的需求,定制誓词和留置权放弃。CPMS 10 can generate affidavits that correspond exactly to invoices. Certain types of workers performing the work (such as electricians, plumbers, etc.) often corrupt invoices, while parties performing the work (such as GCs, subcontractors, and material suppliers) often corrupt pledges. CPMS 10 can be used to ensure that the invoice total equals the affidavit total. Also, CPMS 10 can be used to ensure that the lien waiver amount is equal to the invoice amount since the information for automatic lien waiver is gathered from the approved invoice already stored in CPMS 10. Additionally, the lien waiver will be consistent with the affidavit, as the affidavit is generated by the CPMS 10 using information from the approved invoice. This is especially useful when the GC and subcontractor (or owner, lender and GC) have been arguing over the invoice amount and negotiating the final amount for some time. In automatic and approved invoices stored in CPMS 10, final amounts are reflected and used to generate lien waivers and affidavits. CPMS 10 ensures that only approved invoices are reflected in lien waiver and affidavit documents. Also by using the stored budget as the framework for all automated documentation, CPMS 10 further ensures that invoices, lien waivers and affidavits will be accurate and consistent. CPMS 10 can also be used to customize affidavits and lien releases based on the needs of lenders, owners, owners' representatives, GCs, etc.

CPMS 10也通过将发票、誓词和留置权放弃的存储转移到电介质上,有助于提高生成誓词和留置权放弃的效率,降低存储和访问它们的时间和精力。通过使这些文档可用于执行他们的责任所需的授权方,提高工程支付过程的整体效率。CPMS 10的数据库能存储电子签名的发票、誓词和留置权放弃的库。如果需要,参与方能使用CPMS 10来生成电子签名文档的任何一个的硬拷贝。CPMS 10 also helps increase the efficiency of generating affidavits and lien waivers, reducing the time and effort required to store and access them by offloading the storage of invoices, affidavits, and lien waivers to dielectric. Improve the overall efficiency of the project payment process by making these documents available to authorized parties required to perform their responsibilities. The database of CPMS 10 can store electronically signed invoices, affidavits and libraries of lien waivers. The participating parties can use the CPMS 10 to generate hard copies of any of the electronically signed documents, if desired.

在一个实施例中,CPMS 10能创建自动发票、誓词和留置权放弃,只要输入所有信息并解决所有问题。在其他实施例中,CPMS 10能首先创建自动发票,确保核准发票,其次创建自动誓词,确保签名誓词,第三创建自动留置权放弃。In one embodiment, the CPMS 10 can create automatic invoices, affidavits and lien waivers as long as all information is entered and all issues resolved. In other embodiments, the CPMS 10 can first create an automatic invoice, ensure approval of the invoice, second create an automatic affidavit, ensure a signature affidavit, and third create an automatic lien release.

只要已经输入所有信息(发票、检查报告、银行信息等等)并已经解决所有问题,业主、业主的代表、贷方、产权保险公司或GC能对支取的参与方付款。分包商、材料供应商或任何其他参与方能提供他们的留置权放弃,以换取支付。CPMS 10能组织该过程以及能自动地执行交换,而不会有一方尽责另一方不尽责的风险。CPMS 10也有助于消除为实现以留置权放弃换取支付需亲自参会的昂贵和耗时需要。CPMS 10(严格跟踪文档)也有助于确保收集所有留置权放弃。这降低因不良记录保持而导致在施工工程结束时不释放留置权放弃的风险。CPMS 10能通过在可使用网络的计算机系统中实现该方法,提高支付/留置权放弃释放过程的效率。这允许所有各方在信任环境中安全地定制支付和留置权放弃。CPMS 10便于将支付有效地换成留置权放弃,因为CPMS 10允许在准备自动交换中,分级支付和留置权放弃,从而降低与工程有关的风险。能确保GC将接收与支付一致的适当留置权放弃,以及分包商不承担与支付中的过长延迟有关的风险。Once all information has been entered (invoices, inspection reports, bank details, etc.) and all issues have been resolved, the owner, owner's representative, lender, title insurance company, or GC can pay the drawing party. Subcontractors, material suppliers, or any other parties involved can offer their lien waiver in exchange for payment. The CPMS 10 can organize this process and can carry out the exchange automatically without the risk of one party being responsible and the other not. CPMS 10 also helps eliminate the need for costly and time-consuming in-person meetings to effect lien waivers for payment. CPMS 10 (Strong Tracking Documentation) also helps ensure that all lien waivers are collected. This reduces the risk of a lien waiver not being released at the conclusion of construction work due to poor record keeping. CPMS 10 can improve the efficiency of the payment/lien release release process by implementing the method in a network-enabled computer system. This allows all parties to securely customize payments and lien waivers in a trusted environment. CPMS 10 facilitates the efficient exchange of payments for lien waivers because CPMS 10 allows for tiered payments and lien waivers in preparation for an automatic exchange, reducing project-related risks. Can ensure that GC will receive an appropriate lien waiver consistent with payment and that subcontractors will not bear the risks associated with excessive delays in payment.

CPMS 10能便于留置权放弃和支付指令的交换。在一些实施例中,CPMS 10能基本上与参与方已经收到支付的来自支付系统26的确认的同时释放留置权放弃。在这里和权利要求书中所使用的术语“基本上同时”包括小于请求、处理和通过自动结算中心(ACH)支付、划拨资金所需的时间的任何时间段(将占用达约72小时)。例如,“基本上同时”释放留置权放弃可包括立即释放留置权放弃、在营业日结束时留置权放弃的批量释放或在经ACH系统划拨资金所花费的通常时间周期后释放留置权放弃。在一个实施例中,CPMS 10能接收和将留置权放弃存储在电子保管箱/托管54中,直到已经收到来自支取的所有参与方的所有留置权放弃为止。只要已经收到所有留置权放弃,CPMS 10能发送用于支付系统26将资金划拨到支取的每一参与方的指示。例如,只要所有分包商电子签名并将它们的留置权放弃提交给CPMS 10,CPMS 10能指示支付系统26对每一分包商付款。当将支付指示传送到支付系统26时或仅在收到参与方已经真正收到资金的确认后,CPMS10能释放留置权放弃。CPMS 10 can facilitate the exchange of lien releases and payment instructions. In some embodiments, the CPMS 10 can release the lien waiver substantially simultaneously with confirmation from the payment system 26 that the participant has received payment. As used herein and in the claims, the term "substantially simultaneously" includes any period of time (which would take up to about 72 hours) that is less than the time required to request, process and pay, transfer funds through an Automated Clearinghouse (ACH). For example, "substantially simultaneous" release of lien waivers may include immediate release of lien waivers, batch release of lien waivers at the end of the business day, or release of lien waivers after the usual period of time it takes for funds to be transferred through the ACH system. In one embodiment, the CPMS 10 can receive and store lien waivers in electronic safe deposit box/escrow 54 until all lien waivers have been received from all parties involved in the draw. Once all lien waivers have been received, CPMS 10 can send instructions for payment system 26 to transfer funds to each of the parties involved in the draw. For example, CPMS 10 can instruct payment system 26 to pay each subcontractor as long as all subcontractors electronically sign and submit their lien waivers to CPMS 10 . The CPMS 10 can release the lien waiver when payment instructions are communicated to the payment system 26 or only upon receipt of confirmation that the funds have actually been received by the participant.

如果支付系统26包括ACH系统,通常成批处理支付指令,以致参与方将不能立即收到资金。在ACH系统中,在48小时周期期间,通常能由RDFI返回支付指令。在该48小时周期期间,RDFI能通知CPMS 10和ODFI未能划拨资金(例如由于不足资金、无效金额等等)。在该48小时周期后,如果未通知CPMS 10,CPMS 10能假定RDFI已经处理支付指令。ODFI通常具有24小时的前端窗口,收集来自RDFI的支付指令以及释放支取的参与方的支付金额。因此,从CPMS 10传送支付指令的时间直到ODFI将资金划拨到参与方的帐户中,花费约72小时。If payment system 26 includes an ACH system, payment instructions are typically batched so that participants will not receive funds immediately. In an ACH system, payment instructions can usually be returned by the RDFI during a 48 hour period. During this 48-hour period, the RDFI can notify the CPMS 10 and the ODFI of the failure to transfer funds (eg, due to insufficient funds, invalid amount, etc.). After this 48 hour period, if the CPMS 10 has not been notified, the CPMS 10 can assume that the RDFI has processed the payment instruction. ODFI usually has a 24-hour front-end window to collect payment instructions from RDFI and the payment amount of the participating parties who release the withdrawal. Therefore, it takes approximately 72 hours from the time the CPMS 10 transmits the payment instruction until the ODFI transfers the funds to the participant's account.

在一些实施例中,CPMS 10能标记某些参与方以便从ACH系统的批处理中移除这些参与方,以及能通过另一方法,诸如通过直接电汇资金或另一即时类型的电子资金转帐,单独地支付这些参与方。在其他实施例中,能通过即时类型的电子资金转帐(诸如直接电汇),支付大多数参与方,但一些参与方能与一个或多个ACH批量转帐结合。在其他实施例中,当CPMS 10从每一参与方接收每一留置权放弃时,CPMS 10能将每一支付指令传送到支付系统26,并能将资金直接划拨到从其接收留置权放弃的参与方。通常,CPMS 10能以任何适当的方式控制支付指令,以及能使用任何适当类型的支付方法。In some embodiments, the CPMS 10 can flag certain parties for removal from the ACH system's batch, and can by another method, such as by direct wire transfer of funds or another instant type of electronic funds transfer, These parties are paid individually. In other embodiments, most parties can be paid by an instant type of electronic funds transfer, such as a direct wire transfer, but some parties can be combined with one or more ACH bulk transfers. In other embodiments, as CPMS 10 receives each lien waiver from each party, CPMS 10 can communicate each payment instruction to payment system 26 and can transfer funds directly to the party from which the waiver of lien was received. participants. In general, the CPMS 10 can control payment instructions in any suitable manner, and can use any suitable type of payment method.

在本发明的每一实施例中,CPMS 10能根据当前支取,在当前留置权放弃和当前支付之间建立连接,而不是将先前的留置权放弃换成当前支取的当前支付。例如,CPMS 10能释放用于当前支取的当月的留置权放弃,而不是释放用于当前支取的前一月的留置权放弃。用这种方式,如果CPMS 10在进行支付前,释放其留置权放弃,不暴露分包商债务,以及如果在释放留置权放弃前,CPMS 10进行支付,不暴露业主(或GC、产权保险公司、贷方等等)债务。In each embodiment of the present invention, CPMS 10 can establish a link between the current lien waiver and the current payment based on the current drawdown, rather than exchanging the previous lien waiver for the current payment of the current drawdown. For example, CPMS 10 can release the current month's lien waiver for the current drawdown, but not the prior month's lien waiver for the current drawdown. In this way, if CPMS 10 releases its lien waiver before making the payment, the subcontractor debt is not exposed, and if CPMS 10 makes the payment before the lien waiver is released, the owner (or GC, title insurance company) is not exposed. , lenders, etc.) debt.

以往是先支付GC,该GC再支付其分包商,然后,分包商支付他们自己的分包商,代替这种方式,使用资金的电子分发(例如任何适当类型的EFT、ACH或电汇资金),能直接支付CPMS 10中的各参与方。这加速了支付过程(降低成本),并降低不支付对方(体系中)的风险。通过用来收集进行支付所需的所有信息的CPMS 10,使直接分发资金成为可能。能信任使用CPMS 10收集的信息,因为通过软件,能实现方法的精确。因此,资金的直接分发可以是有效的(无重复工作或重新输入信息必要)以及无错误。CPMS 10能通过降低完成支付过程的占用时间,提高分包商/材料供应商支付过程的效率。CPMS 10可通过用分层支付过程代替直接支付,降低交易成本,同时改善财政和管理控制。CPMS 10能用资金的电子划拨,代替使用支票,降低通信成本以及提高支付状态的可视性以及降低施工过程中包含的所有各方的不适当或不完整支付的风险(特别是供应链中较低级)。Instead of paying the GC first, who in turn pays its subcontractors, who then pay their own subcontractors, use electronic distribution of funds (e.g. any appropriate type of EFT, ACH or wire transfer of funds ), which can directly pay each participant in CPMS 10. This speeds up the payment process (reduces costs) and reduces the risk of not paying the counterparty (in the system). Direct disbursement of funds is made possible by the CPMS 10 used to collect all the information required to make payments. Information collected using CPMS 10 can be trusted because of the accuracy of the method achieved through the software. Thus, direct disbursement of funds can be efficient (no duplication of effort or re-entry of information necessary) and error-free. CPMS 10 can improve the efficiency of the subcontractor/material supplier payment process by reducing the time taken to complete the payment process. CPMS 10 can reduce transaction costs by replacing direct payments with a tiered payment process while improving fiscal and managerial control. CPMS 10 can replace the use of checks with the electronic transfer of funds, reduce communication costs and improve the visibility of payment status and reduce the risk of improper or incomplete payment of all parties involved in the construction process (especially in the supply chain). low level).

图2-7示例说明了可由参与方24使用在应用服务器12中存储的各种模块、管理器和引擎来执行的工程支付管理过程的概述。图2示例说明(能由工程模块28和/或预算模块36执行的)管理工程过程94、(能由支取模块44执行的)管理支取过程96、(能由管理更改订单模块48执行的)管理更改订单过程98、(能由组织模块42和/或用户模块50执行的)管理初始化过程100、(能由访问管理器38、通知管理器40和/或系统环境管理器52执行的)管理系统环境过程102。2-7 illustrate an overview of the project payment management process that may be performed by the parties 24 using the various modules, managers, and engines stored in the application server 12 . FIG. 2 illustrates the Manage Engineering Process 94 (which can be performed by the Engineering Module 28 and/or the Budget Module 36), the Manage Drawout Process 96 (which can be performed by the Drawout Module 44), the Manage Change Order Process 98, Admin Initialization Process 100 (executable by Organization Module 42 and/or User Module 50), Admin System (executable by Access Manager 38, Notification Manager 40, and/or System Environment Manager 52) Environment process 102.

图3示例说明管理工程过程94,能包括创建工程任务104、维护工程任务106和创建预算任务108。图4示例说明管理组织过程100,能包括创建组织任务112、维护组织任务114、创建用户任务116和维护用户任务118。图5示例说明管理支取过程96,能包括初始化支取任务120、创建支取请求任务122、支付资金任务124、执行检查任务126和核准支取请求任务128。图6示例说明管理更改订单过程98,能包括创建更改请求任务130、过程更改请求任务132和更改参与方任务134。图7示例说明管理系统环境任务102,能包括管理访问任务136、管理消息任务138、创建报告任务140、提供帮助任务142和维护系统任务。由GC的线上或下的任一参与方,执行创建报告任务140,以便创建与施工工程的进度有关的定制报告,包括监视施工工程部分的能力、特定参与方、整体工程等等。FIG. 3 illustrates the manage engineering process 94 , which can include create engineering tasks 104 , maintain engineering tasks 106 , and create budget tasks 108 . FIG. 4 illustrates a manage organization process 100 , which can include create organization tasks 112 , maintain organization tasks 114 , create user tasks 116 , and maintain user tasks 118 . FIG. 5 illustrates the manage drawout process 96, which can include an initialize drawout task 120, create drawout request task 122, pay funds task 124, execute check task 126, and approve drawout request task 128. FIG. 6 illustrates the manage change order process 98 , which can include a create change request task 130 , a process change request task 132 , and a change party task 134 . Figure 7 illustrates Manage System Environment tasks 102, which can include Manage Access task 136, Manage Messages task 138, Create Reports task 140, Provide Help task 142, and Maintain System tasks. Create reports task 140 is performed by any party on or off the GC to create custom reports related to the progress of the construction work, including the ability to monitor parts of the construction work, specific parties, the overall project, and so on.

图8-136示例说明根据本发明的几个实施例的工程支付管理方法。图8示例说明能包括在管理组织过程100中的创建组织过程146。使用组织模块42,由任一参与方24执行创建组织过程146。创建组织过程146能包括创建组织任务148、更新组织配置文件任务150、编辑组织任务152、使组织通知有效154、使组织有效任务156以及组织拒绝任务158或组织启动任务160。也能执行更新用户配置文件任务162,如参考图22所述。8-136 illustrate project payment management methods according to several embodiments of the invention. FIG. 8 illustrates a create organization process 146 that can be included in the manage organization process 100 . Using the organization module 42 , a create organization process 146 is performed by any party 24 . Create Organization process 146 can include Create Organization Task 148 , Update Organization Profile Task 150 , Edit Organization Task 152 , Validate Organization Notification 154 , Validate Organization Task 156 , and Organization Rejection Task 158 or Organization Initiation Task 160 . An update user profile task 162 can also be performed, as described with reference to FIG. 22 .

图9示例说明能与创建组织任务148有关的创建组织表单。每一参与方24能通过组织模块42,访问创建组织表单。参与方24能输入请求信息,诸如公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将输入他或她的信息作为主要联系人信息的参与组织24的第一用户视为用于该参与方24的管理员,以及能比后续用户更有权访问用于该参与方的信息。CPMS 10能使用基于综合角色的安全性,以便工程参与方仅看到工程中与他们的具体需要有关的信息。只要在CPMS 10中注册组织,该组织能接收用于由CPMS 10管理的任何工程的支付。FIG. 9 illustrates a create organization form that can be associated with create organization task 148 . Through the organization module 42, each participant 24 has access to create an organization form. Participant 24 can enter requested information, such as company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of a participating organization 24 who enters his or her information as primary contact information is considered an administrator for that party 24 and has more access than subsequent users to the Information about the parties. CPMS 10 can use comprehensive role-based security so that project participants see only the information in the project that is relevant to their specific needs. As long as an organization is registered in CPMS 10, that organization can receive payment for any project managed by CPMS 10.

图10示例说明能在更新用户配置文件任务162期间传送的通知。在此和附加权利要求书中所使用的术语“系统通知”或“通知”或“系统消息”是指与参与方的任何形式的通信,诸如电子邮件消息、屏幕通知、文本消息、语音消息等等。图10的系统通知能包括用于参与方24的第一用户的用户名和临时密码。FIG. 10 illustrates notifications that can be transmitted during the update user profile task 162 . As used herein and in the appended claims, the term "system notification" or "notification" or "system message" refers to any form of communication with a party, such as email messages, screen notifications, text messages, voice messages, etc. wait. The system notification of FIG. 10 can include a username and temporary password for the first user of party 24 .

图11示例说明在更新组织配置文件任务150期间传送的通知。图11的通知能发送到用于该参与方24的管理员。该通知能包括表示接收方的声明以更新组织配置文件,以及在参与工程前添加用户,以及提供银行明细。FIG. 11 illustrates notifications communicated during an update organization profile task 150 . The notification of FIG. 11 can be sent to the administrator for that party 24 . The notification can include a statement indicating the recipient to update the organization profile and add the user prior to participating in the project, as well as provide bank details.

图12示例说明能与编辑组织任务152有关的编辑组织表单。每一参与方24能修改现有的信息,诸如公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将他或她的信息输入成主要原始信息的参与组织24的第一用户为有权访问编辑组织表单的唯一用户。FIG. 12 illustrates an edit organization form that can be associated with an edit organization task 152 . Each participant 24 can modify existing information such as company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of participating organization 24 who enters his or her information as primary source information is the only user with access to the edit organization form.

图13示例说明在有效组织通知任务156期间传送的有效组织通知。图13的通知能包括已经更新组织的明细以及验证和启动组织的请求的声明。FIG. 13 illustrates an effective organization notification communicated during the effective organization notification task 156 . The notification of Figure 13 can include a statement that the organization's details have been updated and a request to verify and activate the organization.

图14示例说明能与有效组织任务156有关的有效组织表单。图14的表单能包括参与方24的清单(例如包括组织名、施工过程中的角色、选择参与方24的能力以及查看参与方24的信息的能力)。图14的表单还能包括“查找”特征、指定参与方24的类型的能力以及拒绝/停用所选组织和提供拒绝/停用的原因的能力。FIG. 14 illustrates an active organization form that can be associated with an active organizational task 156 . The form of FIG. 14 can include a list of parties 24 (including, for example, organization name, role in the construction process, ability to select parties 24, and ability to view party 24 information). The form of FIG. 14 could also include a "lookup" feature, the ability to specify the type of party 24, and the ability to reject/deactivate a selected organization and provide a reason for the denial/deactivation.

图15示例说明能在组织启动任务160期间传送的组织启动通知。类似地,图16示例说明能在组织拒绝任务158期间传送的组织拒绝通知。FIG. 15 illustrates an organization-initiated notification that can be communicated during an organization-initiated task 160 . Similarly, FIG. 16 illustrates an organization rejection notification that can be communicated during an organization rejection task 158 .

图17示例说明能包括在管理组织过程100中的维护组织过程162。能由组织本身或其他参与方使用维护组织过程162以便维护联系人信息的准确性、银行帐户信息或工程支付过程所需的其他类型的信息。使用组织模块42,能由任何参与方执行维护组织过程162。维护组织过程162能包括浏览组织任务164、编辑组织任务166、组织更新任务168和查看组织任务170。FIG. 17 illustrates a maintain organization process 162 that can be included in the manage organization process 100 . The maintain organization process 162 can be used by the organization itself or other parties in order to maintain the accuracy of contact information, bank account information, or other types of information required for the project payment process. Using the organization module 42, the maintain organization process 162 can be performed by any party. The maintain organization process 162 can include browse organization tasks 164 , edit organization tasks 166 , organize update tasks 168 , and view organization tasks 170 .

图18示例说明能与查看组织任务170有关的查看组织屏。查看组织屏能包括用于组织的公司信息和主要联系人信息。FIG. 18 illustrates a view organization screen that can be associated with view organization tasks 170 . The View Organization screen can include company information and primary contact information for the organization.

图19示例说明能与浏览组织任务164有关的浏览组织屏。浏览组织屏能包括参与方列表,包括组织名、在施工过程中的组织角色、主要联系人以及电话号码。浏览组织屏能包括“查找”特征和用于浏览有关每一参与方的另外的信息的链接。在一个实施例中,浏览组织屏能由GC使用来查看其最佳分包商或材料供应商。FIG. 19 illustrates a browse organization screen that can be associated with a browse organization task 164 . The Browse Organization screen can include a list of parties involved, including the organization's name, the organization's role in the construction process, key contacts, and phone numbers. The browse organization screen can include a "look up" feature and links for browsing additional information about each party. In one embodiment, the browse organization screen can be used by the GC to view its best subcontractors or material suppliers.

图20示例说明能与编辑组织任务166有关的编辑组织表单。参与方能编辑现有的信息,包括公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将他或她的信息输入成主要联系人信息的组织的第一用户是有权访问编辑组织表单的唯一用户。FIG. 20 illustrates an edit organization form that can be associated with an edit organization task 166 . Participants can edit existing information, including company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of the organization who entered his or her information as primary contact information is the only user with access to the edit organization form.

图21示例说明能在组织更新任务168期间传送的组织配置文件更新通知。图21的通知能包括有关用于该参与方的更新配置文件的信息以及主要用户的名称或该参与方的管理员。FIG. 21 illustrates an organization profile update notification that can be communicated during an organization update task 168 . The notification of FIG. 21 can include information about the updated configuration file for the party as well as the name of the primary user or administrator of the party.

图22示例说明能包括在管理组织过程100中的创建用户过程172。每次创建现有组织的新用户时,能使用创建用户过程172,以便允许新用户适当访问CPMS 10(例如具有用户标识和密码的适当安全级)。也能使用创建用户过程172来更新用户配置文件。使用组织模块42,能由任一参与方24执行创建用户过程172。创建用户过程172能包括创建用户任务174和更新用户配置文件任务176。FIG. 22 illustrates a create user process 172 that can be included in the manage organization process 100 . The Create User process 172 can be used each time a new user of an existing organization is created in order to allow the new user proper access to the CPMS 10 (e.g., with an appropriate level of security for a user ID and password). The create user process 172 can also be used to update user profiles. Using the organization module 42 , the create user process 172 can be performed by any party 24 . Create User process 172 can include Create User task 174 and Update User Profile task 176 .

图23示例说明能与创建用户任务174有关的创建用户表单。在一些实施例中,在已经为该参与方创建第一用户或管理员之后,可使用创建用户表单来添加用户。新用户可输入个人信息、安全信息(例如用户名和密码)、电子邮件通知首选项以及安全许可(security clearance)级(例如用户是否允许管理工程和/或签名文档)。FIG. 23 illustrates a create user form that can be associated with a create user task 174 . In some embodiments, a create user form may be used to add users after a first user or administrator has been created for the party. New users can enter personal information, security information (such as username and password), email notification preferences, and security clearance level (such as whether the user is allowed to manage projects and/or sign documents).

图24示例说明能在更新用户配置文件任务176期间传送的更新用户配置文件通知。图24的通知能包括已经将该用户添加为组织的成员的声明,以及用户的安全信息(例如用户名和临时密码)。FIG. 24 illustrates an update user profile notification that can be transmitted during the update user profile task 176 . The notification of FIG. 24 can include a statement that the user has been added as a member of the organization, as well as the user's security information (eg, username and temporary password).

图25示例说明能包括在消息组织过程100中并从图22接续的维护用户过程178。能使用维护用户过程178来浏览每一组织中的用户以及查看、编辑和更新每一组织中的用户。使用组织模块42,能由任一参与方执行维护用户过程178。维护用户过程178能包括浏览用户任务180和编辑用户任务182、用户配置文件更新任务184和查看用户任务186。FIG. 25 illustrates a maintenance user process 178 that can be included in the message organization process 100 and continues from FIG. 22 . The maintain users process 178 can be used to browse and view, edit and update users in each organization. Using the organization module 42, the maintain user process 178 can be performed by any party. The maintain user process 178 can include browse user tasks 180 and edit user tasks 182 , user profile update tasks 184 and view user tasks 186 .

图26示例说明能与查看用户任务186有关的查看用户屏。图26的查看用户屏能包括用户的个人信息、电子邮件通知首选项,以及安全许可等级。FIG. 26 illustrates a view user screen that can be associated with view user tasks 186 . The View User screen of Figure 26 can include the user's personal information, email notification preferences, and security clearance level.

图27示例说明能与浏览用户任务180有关的浏览用户屏。图27的浏览用户屏可包括用于每一参与方的一个或多个用户的列表,并且可包括用户名、电子邮件地址和电话号码。浏览用户屏也能包括编辑用于每一用户的信息的链接。FIG. 27 illustrates a browse user screen that can be associated with a browse user task 180 . The Browse Users screen of FIG. 27 may include a list of one or more users for each party, and may include usernames, email addresses, and phone numbers. Browsing the user screen can also include links to edit information for each user.

图28示例说明能与编辑用户任务182有关的编辑用户表单。用户能提供个人信息、电子邮件通知首选项以及安全许可等级。FIG. 28 illustrates an edit user form that can be associated with an edit user task 182 . Users can provide personal information, email notification preferences, and security clearance levels.

图29示例说明能在用户配置文件更新任务184期间传送的用户配置文件更新通知。FIG. 29 illustrates user profile update notifications that can be communicated during a user profile update task 184 .

图30示例说明能包括在管理工程过程94中的创建工程过程188。能由GC、贷方、业主或业主代表使用工程模块28来执行创建工程过程188以便启动CPMS 10中的新工程。创建工程过程188能包括创建工程任务190、工程建立任务192、工程用户访问任务194和工程责任任务196。FIG. 30 illustrates a create engineering process 188 that can be included in the manage engineering process 94 . The create project process 188 can be performed by the GC, lender, owner, or owner's representative using the engineering module 28 to start a new project in the CPMS 10. Create engineering process 188 can include create engineering task 190 , engineering setup task 192 , engineering user access task 194 , and engineering responsibility task 196 .

图31和32示例说明能与创建工程任务190有关的创建工程表单。GC、贷方、业主或业主代表能提供工程标识信息、工程筹款信息、工程业主信息、工程建筑师信息和现场信息。31 and 32 illustrate create engineering forms that can be associated with create engineering tasks 190 . The GC, lender, owner or owner's representative can provide project identification information, project financing information, project owner information, project architect information, and site information.

图33示例说明能在工程创建任务192期间传送的工程创建通知。图33的通知能包括GC、贷方、业主或业主代表已经创建新工程的声明,以及允许将来自参与方的用户指定给该工程的至屏幕的链接。FIG. 33 illustrates project creation notifications that can be communicated during a project creation task 192 . The notification of Figure 33 can include a statement that the GC, lender, owner, or owner's representative has created a new project, and a link to a screen that allows users from parties to be assigned to the project.

图34示例说明能与工程用户访问任务194相结合的工程用户访问屏。工程用户访问屏能包括工程名、工程号、GC名以及特定工程和/或特定组织的用户列表。按名称和用户名来标识用户,并可被视为工程管理员或签名者。FIG. 34 illustrates an engineering user access screen that can be combined with the engineering user access task 194. The project user access screen can include project name, project number, GC name, and a list of project-specific and/or organization-specific users. Users are identified by name and username, and can be considered project administrators or signers.

图35示例说明能在工程责任任务196期间传送的工程责任通知。图35的通知能包括相对于工程的用户责任已经修改的声明。FIG. 35 illustrates an engineering responsibility notification that can be communicated during an engineering responsibility task 196. The notification of Figure 35 can include a statement that the user's responsibilities with respect to the project have been modified.

图36示例说明能包括在管理工程过程94中的维护预算过程198。维护预算过程198能用来创建和查看用于施工工程的顶级预算(toplevel budget),将支出项分配给参与方,以及将责任分配给参与方。使用预算模块36,维护预算过程198可由GC对分包商执行或由分包商对二级分包商或材料供应商执行。维护预算过程198能包括进入顶级预算任务200、接收工程任务202、接收工程表单任务204、工程拒绝任务206、添加用户任务208、工程接收任务210、工程主页任务211、工程用户访问任务212、工程责任任务214和工程预算查看任务216。如果拒绝工程,维护预算过程198能包括输入预算任务218和能返回到接收工程任务202。在进入顶级预算任务200后,维护预算过程198能包括发票代码设置任务220、输入支取日期任务222和指定发票代码任务224。FIG. 36 illustrates a Maintenance Budget process 198 that can be included in the Manage Engineering process 94. The maintenance budget process 198 can be used to create and view top level budgets for construction projects, assign expenditure items to parties, and assign responsibilities to parties. Using the budget module 36, the maintenance budget process 198 may be performed by the GC on the subcontractor or by the subcontractor on the secondary subcontractor or material supplier. Maintain Budget Process 198 can include Enter Top Level Budget Task 200, Receive Project Task 202, Receive Project Forms Task 204, Project Reject Task 206, Add User Task 208, Project Receive Task 210, Project Home Page Task 211, Project User Access Task 212, Project Responsibility task 214 and project budget review task 216 . If the project is rejected, the maintenance budget process 198 can include an input budget task 218 and can return to the receive project task 202 . After entering the top-level budget task 200 , the maintain budget process 198 can include an invoice code setup task 220 , an enter draw date task 222 , and an assign invoice code task 224 .

图37示例说明能与进入顶级预算任务200有关的进入顶级预算表单。进入顶级预算表单可包括工程名、工程号,以及合同价值。GC或分包商能提供保留百分值、阶段代码、阶段代码描述、组织名、预算金额和帐户代码。GC或分包商能指定该组织是否正在提供材料。进入顶级预算表单也可包括设置支取日期和设置发票代码屏/表单的链接。能使用阶段代码和阶段代码描述来定义必须完成的每一特定作业的合同要求以便完成工程。例如,能通过美国建筑师协会(AIA)、通过建筑规范协议(CSI)或通过定制AIA或CSI阶段代码和阶段描述,提供阶段代码和阶段描述。在一些实施例中,能完全由参与方定制阶段代码和阶段描述。也可将顶级预算称为价格计划、约定成本(在GC已经从分包商接收投标后)或工程估算。在一些实施例中,包括在顶级预算中的阶段代码提供用于支取请求的基础,因为每一支取请求包括与特定阶段代码有关的特定支出项。在一些实施例中,GC能使用外部软件程序来生成预算以及预算模块36能与外部软件程序相互作用以便将预算输入应用服务器12或数据库服务器14中。FIG. 37 illustrates the Enter Top-Level Budget form that can be associated with the Enter Top-Level Budget task 200 . Entering the top-level budget form can include project name, project number, and contract value. GC or subcontractor can provide reserve percentage value, stage code, stage code description, organization name, budget amount and account code. The GC or subcontractor can specify whether the organization is providing the material. Access to the top-level budget form may also include links to the Set Draw Date and Set Invoice Code screens/forms. Phase codes and phase code descriptions can be used to define contractual requirements for each specific activity that must be completed in order to complete the project. For example, phase codes and phase descriptions can be provided through the American Institute of Architects (AIA), through the Building Specification Agreement (CSI), or through custom AIA or CSI phase codes and phase descriptions. In some embodiments, the phase codes and phase descriptions can be fully customized by the parties. Top-level budgets may also be referred to as price plans, agreed costs (after the GC has received bids from subcontractors), or engineering estimates. In some embodiments, the stage codes included in the top-level budget provide the basis for drawdown requests, since each drawdown request includes a specific expenditure item associated with a particular stage code. In some embodiments, the GC can use an external software program to generate the budget and the budget module 36 can interact with the external software program to enter the budget into the application server 12 or the database server 14 .

图38示例说明能与输入支取日期任务222有关的输入支取日期表单。GC或分包商可输入该月份将进行支取的日子,以及用于支取的特定日期(例如每个月在特定的日)。输入支取日期表单还能包括用于支取日期的自动计算的支取日期计算按钮和/或用于手工输入支取日期的支取日期添加按钮。FIG. 38 illustrates an Enter Withdrawal Dates form that can be associated with the Enter Withdrawal Dates task 222 . The GC or subcontractor can enter the days of the month when the payout will be made, as well as a specific date for the payout (eg, on a specific day of the month). The input withdrawal date form can also include a withdrawal date calculation button for automatic calculation of the withdrawal date and/or a withdrawal date addition button for manual entry of the withdrawal date.

图39示例说明能与发票代码设置任务220有关的发票代码设置表单。GC或分包商能选择发票代码(例如按建筑物-建筑物1,2或3编号的代码),输入新发票代码、创建发票代码、输入预算项的显示的首选项(例如按阶段代码),以及输入用于打印选择的首选项。通过CPMS 10,发票代码设置表单能便利发票和誓词的自动生成。发票代码能用于定制报告或与其他类型的现有软件交互。发票代码能允许参与方基于建筑师、业主等等的需求对预算支出项分类。能使用帐户代码来维护预算、记录支取结果或便于开发票和支付。Figure 39 illustrates an invoice code setup form that can be associated with the invoice code setup task 220. GC or Subcontractor can select invoice codes (e.g. codes by building - building 1, 2 or 3), enter new invoice codes, create invoice codes, enter budget line display preferences (e.g. by phase code) , and enter preferences for printing selections. With CPMS 10, the invoice code setup form facilitates the automatic generation of invoices and affidavits. Invoice codes can be used for custom reporting or to interface with other types of existing software. Invoice codes can allow parties to categorize budget expenditure items based on the needs of architects, owners, and the like. Account codes can be used to maintain budgets, record withdrawals, or facilitate invoicing and payments.

图40示例说明能与分配发票代码任务224有关的分配发票代码表单。GC或分包商能提供发票代码(例如建筑1,2或3),并能使用访问每一阶段代码的子预算的链接。分配发票代码表单能包括工程名、工程地址、阶段代码、阶段代码描述、承包该作业的组织以及预算金额。分配发票代码表单还能通过CPMS 10便利发票和誓词的自动生成。FIG. 40 illustrates an Assign Invoice Codes form that can be associated with the Assign Invoice Codes task 224. The GC or subcontractor can provide an invoice code (eg Construction 1, 2 or 3) and can use links to access subbudgets for each phase code. The Assign Invoice Code form can include the project name, project address, stage code, stage code description, organization contracting the job, and budgeted amount. The Assign Invoice Code form also facilitates the automatic generation of invoices and affidavits through CPMS 10.

图41示例说明能与接收工程任务202有关的接收工程通知。图41的通知能包括已经将分包商或材料供应商添加为工程的参与方、工程描述和分包商或材料供应商的参与细节的声明。分包商或材料供应商能使用访问图42所示的接收工程表单的链接来接收或拒绝该工程。FIG. 41 illustrates a receipt engineering notification that can be related to a receipt engineering task 202 . The notification of Figure 41 can include a statement that the subcontractor or material supplier has been added as a party to the project, a description of the project and details of the subcontractor or material supplier's participation. The subcontractor or material supplier can accept or reject the project using the link to access the accept project form shown in FIG. 42 .

图42示例说明能与接收工程表单任务204有关的接收工程表单。接收工程表单能包括GC工程号、系统工程号、GC名、工程名、工程地址和预算支出项。接收工程表单能为分包商或材料供应商提供工程信息和预算支出项。分包商或材料供应商能使用接收或拒绝按钮来接收或拒绝与预算支出项有关的工程。分包商或材料供应商也能提供拒绝该工程的原因。来自接收工程表单的支出项也能用来通过CPMS 10,便于发票和誓词的自动生成。FIG. 42 illustrates a receiving engineering form that can be associated with the receiving engineering form task 204 . The receiving project form can include GC project number, system project number, GC name, project name, project address and budget expenditure items. The receiving engineering form can provide subcontractors or material suppliers with engineering information and budget expenditure items. Subcontractors or material suppliers can use the Accept or Decline buttons to accept or reject works related to budget expenditure items. Subcontractors or material suppliers can also provide reasons for rejecting the work. Expenditure items from receiving engineering forms can also be used through CPMS 10 to facilitate automatic generation of invoices and affidavits.

图43示例说明在工程拒绝任务206期间传送的工程拒绝通知。图43的通知能包括已经拒绝该工程的分包商或材料供应商的名称、拒绝的预算项以及拒绝原因。图43的通知可提供将组织角色分配给另一参与方的能力。FIG. 43 illustrates an engineering rejection notification communicated during the engineering rejection task 206 . The notification of Figure 43 can include the name of the subcontractor or material supplier who has rejected the project, the budget item rejected and the reason for the rejection. The notification of Figure 43 may provide the ability to assign an organizational role to another party.

图44示例说明能在工程接收任务210期间传送的工程接收通知。图44的通知能包括已经接收该工程的分包商或材料供应商的名称以及所接收的预算项。图43的通知能提供访问工程明细的能力。FIG. 44 illustrates engineering receipt notifications that can be communicated during the engineering receipt task 210 . The notification of Figure 44 can include the name of the subcontractor or material supplier who has accepted the work and the budget line received. The notification of Figure 43 can provide the ability to access project details.

图45示例说明能与工程主页任务211有关的工程主页。工程主页能包括工程名、完成的支取信息以及未决支取信息。工程主页能包括具有工程时间表进度条的工程概述、资金支付进度条以及百分比完成进度条。工程主页能包括与相对于工程执行的特定动作的一个或多个链接(例如工程配置文件、工程预算、查看工程参与方、设置发票码、管理工程用户、启动未计划支取等等)。FIG. 45 illustrates an engineering home page that can be associated with the engineering home page task 211 . The project home page can include the project name, completed withdrawal information, and pending withdrawal information. The project home page can include a project overview with a project timeline progress bar, a funding progress bar, and a percent complete progress bar. The project home page can include one or more links to specific actions performed with respect to the project (eg, project configuration file, project budget, view project parties, set invoice codes, manage project users, initiate unplanned withdrawals, etc.).

图46示例说明在添加用户任务208期间传送的添加用户通知。图46的通知能包括确认分包商或材料供应商已经加入该工程的声明。图46的通知能包括用于分包商或材料供应商将用户(例如组织的成员)添加到该系统的请求。FIG. 46 illustrates an add user notification communicated during the add user task 208 . The notification of Figure 46 can include a statement confirming that a subcontractor or material supplier has joined the project. The notification of Figure 46 can include a request for a subcontractor or material supplier to add a user (eg, a member of an organization) to the system.

图47示例说明能与工程用户访问任务212有关的工程用户访问表单。分包商或材料供应商能选择每一用户的安全许可(例如工程管理员或签名者)。工程用户访问表单能包括工程名、GC名和分包商或材料供应商组织的用户清单。FIG. 47 illustrates an engineering user access form that can be associated with an engineering user access task 212. Subcontractors or material suppliers can select security permissions for each user (eg, project administrator or signer). The project user access form can include project name, GC name and user list for subcontractor or material supplier organization.

图48示例说明能与工程责任任务214有关的工程责任通知。图48的通知能包括已经修改用户的责任,以及新的安全认可的声明。图48的通知能包括访问工程预算的链接。FIG. 48 illustrates an engineering responsibility notification that can be related to an engineering responsibility task 214 . The notification of Figure 48 can include a statement that the user's responsibilities have been modified, as well as new security approvals. The notification of Figure 48 can include a link to access the project budget.

图49示例说明能与工程预算查看任务216有关的工程预算查看屏。GC或分包商能通过预算模块36,访问工程预算查看屏。工程预算查看屏能包括工程名、GC名、工程地址,以及预算项的清单。预算项的清单能包括阶段代码、阶段代码描述、承包预算项的分包商或材料供应商、预算金额、支付、保留、余额和任何子预算的链接。FIG. 49 illustrates a project budget review screen that can be associated with the project budget review task 216 . The GC or subcontractor can access the project budget viewing screen through the budget module 36 . The project budget view screen can include project name, GC name, project address, and a list of budget items. A list of budget items can include a phase code, a description of the phase code, subcontractors or material suppliers contracting for the budget item, budget amounts, payments, encumbrances, balances, and links to any sub-budgets.

图50示例说明能与输入预算任务218有关的输入预算表单。GC或分包商能通过预算模块36访问输入预算表单。GC或分包商能输入所请求的信息,诸如阶段代码、阶段代码描述和预算金额。GC或分包商能改变与特定预算支出项有关的组织。GC或分包商能选择该组织是否仅提供材料。FIG. 50 illustrates an input budget form that can be associated with the input budget task 218 . The GC or subcontractor can access the input budget form through the budget module 36 . The GC or subcontractor can enter requested information such as stage codes, stage code descriptions, and budget amounts. A GC or subcontractor can change the organization associated with a particular budget expenditure item. The GC or subcontractor can choose whether the organization will only provide the material.

图51示例说明能包括在管理工程过程94中的终止预算项过程226。能由GC或分包商执行终止预算项过程226。终止预算项过程226能包括进入顶级预算任务228和终结预算任务230。FIG. 51 illustrates the End Budget Lines process 226 that can be included in the Manage Engineering process 94. The terminate budget line process 226 can be performed by a GC or a subcontractor. Terminate budget line process 226 can include entering top-level budget task 228 and finalizing budget task 230 .

图52示例说明能与进入顶级预算任务228有关的进入顶级预算表单。GC或分包商能通过预算模块36,访问进入顶级预算表单。进入顶级预算表单可包括工程名、工程号、合同价值和组织列表。GC或分包商能输入所请求的信息,诸如保留百分比、阶段代码,阶段代码描述、帐号以及该组织是否仅提供材料。GC或分包商也能选择添加新支出项或终结特定支出项。进入顶级预算表单可包括与设置支取日期表单和/或设置发票码表单的链接。FIG. 52 illustrates the Enter Top-Level Budget form that can be associated with the Enter Top-Level Budget task 228. The GC or subcontractor can access the top-level budget form through the budget module 36 . Entry into the top-level budget form may include project name, project number, contract value, and organization listing. The GC or subcontractor can enter requested information such as retention percentage, stage code, stage code description, account number, and whether the organization is only supplying material. The GC or subcontractor can also choose to add new expenditure items or terminate specific expenditure items. Access to the top-level budget form may include links to a Set Draw Date form and/or a Set Invoice Code form.

图53示例说明能与终结预算任务226有关的终止预算屏。在GC或分包商选择终结的支出项后,终结预算屏提供能使任何未付余额用于重新分配的确认和声明。FIG. 53 illustrates a termination budget screen that can be associated with the termination budget task 226. FIG. After the GC or subcontractor selects a finalized expense line, the finalized budget screen provides confirmation and statement that enables any unpaid balances to be available for reallocation.

图54示例说明能包括在管理支取过程96中的支取过程232。支取过程232能用来创建用于工程支取的计划、初始化每一支取、输入和签名发票、查看未决支取、生成发票、誓词和留置权放弃、确定资金是否可用,以及支付资金。可由几个参与方使用支取模块44来执行支取过程232。支取过程232能包括创建支取时间表单任务234、初始化支取任务236、输入发票任务238、输入发票表单任务240、签名发票任务242、更新的发票明细任务244、查看未决支取请求任务246、生成发票任务248、誓词表单任务250、资金可用任务252、查看支取请求任务254、签名留置权放弃任务256、留置权放弃表单任务258、所有留置权放弃签名任务260、通过支付资金按钮查看支取请求任务262、支付的支付额任务264、签名的留置权放弃任务266、查看支取请求任务268。支取过程232也可包括接收的支付明细任务270、未包括在支取任务中的发票272,以及未接收的支付明细任务274。可执行支取过程232以对当前支取而非以前的支取释放留置权放弃。FIG. 54 illustrates a withdrawal process 232 that can be included in the manage withdrawal process 96. Withdrawal process 232 can be used to create a schedule for project withdrawals, initiate each withdrawal, enter and sign invoices, view pending withdrawals, generate invoices, affidavit and lien releases, determine availability of funds, and disburse funds. The payout process 232 may be performed by several parties using the payout module 44 . Withdrawal process 232 can include create withdrawal time form task 234, initialize withdrawal task 236, enter invoice task 238, enter invoice form task 240, sign invoice task 242, update invoice detail task 244, view pending withdrawal request task 246, generate invoice Task 248, Affidavit Form Task 250, Funds Available Task 252, View Withdrawal Request Task 254, Signature Lien Waiver Task 256, Lien Waiver Form Task 258, All Lien Waiver Signature Task 260, View Withdrawal Request via Pay Funds Button Task 262 , Paid Payment Amount task 264 , Signed Lien Waiver task 266 , View Drawout Request task 268 . The debit process 232 may also include received payment detail tasks 270 , invoices not included in the debit task 272 , and unreceived payment detail tasks 274 . The withdrawal process 232 may be performed to release the lien waiver for the current withdrawal but not for the previous withdrawal.

图55示例说明能在创建支取时间表单任务234期间传送的创建计划支取通知。能将图55的通知实时传送到所有支取参与方以及能包括计划支取未决以及还没有选择用于该支取的参与方的声明。FIG. 55 illustrates a create plan payout notification that can be communicated during the create drawdown schedule task 234. The notification of FIG. 55 can be communicated in real time to all drawout participants and can include a statement that a planned payout is pending and parties that have not yet been selected for the drawout.

图56示例说明能与初始化支取任务236有关的初始化支取表单。GC能通过支取模块44访问初始化支取表单。初始化支取表单能包括工程名、工程号、工程地址、支取数、支取日期以及用于该支取的潜在参与方的列表。潜在参与方的列表能包括阶段代码、阶段代码描述、组织名、预算金额、支付金额、应计的扣款以及余额。GC能选择每一参与方支取。FIG. 56 illustrates an initialization payout form that can be associated with the initialization payout task 236. The GC can access the initial withdrawal form through the withdrawal module 44. The initial withdrawal form can include project name, project number, project address, withdrawal amount, withdrawal date, and a list of potential parties for the withdrawal. The list of potential parties can include stage codes, stage code descriptions, organization names, budget amounts, payment amounts, accrued deductions, and balances. GC can choose each participant to withdraw.

图57示例说明能在输入发票任务238期间传送的输入发票通知。图57的通知能包括已经计划用于工程的支取以及分包商或材料供应商已经输入应付款的明细的声明。该通知能包括用于分包商或材料供应商的组织角色和特定预算项。能将通知实时传送到所有支取参与方。FIG. 57 illustrates the input invoice notifications that can be transmitted during the input invoice task 238. The notification of Figure 57 can include a statement that a drawdown has been planned for the work and that the subcontractor or material supplier has entered details of the amount payable. The notification can include organizational roles and specific budget items for subcontractors or material suppliers. The notification can be transmitted to all withdrawal participants in real time.

图58示例说明能与输入发票表单任务240有关的输入发票表单。分包商或材料供应商能使用输入发票表单来提供用于该支取的发票金额。输入发票表单也能包括工程名、工程号、工程地址、支取数、支取日期和用于该分包商或材料供应商的特定支出项。FIG. 58 illustrates an Enter Invoice Form that can be associated with the Enter Invoice Form task 240 . Subcontractors or material suppliers can use the Enter Invoice form to provide invoice amounts for this debit. The input invoice form can also include project name, project number, project address, billed amount, billed date, and specific expense items for that subcontractor or material supplier.

图59示例说明能在签名发票任务242期间,传送到GC的签名发票通知。图59的通知能包括分包商或材料供应商已经核准用于特定支取的发票以及誓词必须签名的声明。CPMS 10能用来向每一用户分配安全/授权角色,诸如管理、记帐或授权签名。CPMS 10能通过签名誓词的授权来通知用户,以使得在必要时由该组织的成员签名誓词。CPMS 10能用来改变签名誓词所需的安全/授权角色(例如贷方能要求签名誓词,而不是组织的管理员)。Figure 59 illustrates a signed invoice notification that can be sent to the GC during the signed invoice task 242. The notification of Figure 59 can include a statement that the subcontractor or material supplier has approved the invoice for a particular payout and an affidavit must be signed. The CPMS 10 can be used to assign security/authorization roles to each user, such as administration, accounting or authorized signatures. The CPMS 10 can notify the user of the authorization to sign an affidavit, so that an affidavit can be signed by a member of the organization if necessary. CPMS 10 can be used to change the security/authorization roles required for signing affidavits (eg lenders can require signing affidavits, not administrators of the organization).

图60示例说明能与签名发票任务242有关的签名发票表单。GC能通过支取模块44访问签名发票。GC能查看发票的明细,诸如特定组织、请求金额、预算金额、支付额、扣款以及余额。然后,GC能选择签名发票声明。签名发票表单可包括自动誓词表单的链接。FIG. 60 illustrates a Sign Invoice form that can be associated with the Sign Invoice task 242. The GC has access to signed invoices through the withdrawal module 44 . GC can view the details of the invoice, such as specific organization, request amount, budget amount, payment amount, deduction and balance. The GC can then choose to sign the invoice statement. A signed invoice form can include a link to an automated affidavit form.

图61示例说明能在发票明细更新任务244期间,传送到GC的发票明细更新通知。图61的通知能包括分包商或材料供应商已经在用于特定工程的特定日期更新用于支取的支付明细的声明。该通知能包括链接以便查看发票细目。Figure 61 illustrates an invoice detail update notification that can be sent to the GC during the invoice detail update task 244. The notification of FIG. 61 can include a statement that the subcontractor or material supplier has updated the payment details for payment on a specific date for a specific project. The notification can include a link to view invoice details.

图62示例说明能与查看未决支取请求任务246有关的查看未决支取请求屏。GC能通过支取模块44访问查看未决支取请求屏。GC能选择每一参与方包括在该支取中、确认支取以及将通知实时发送到每一组织的签名者。然而,GC也能拒绝未决支取请求,通知被选参与方重新输入发票以及提供拒绝支取请求的原因。查看未决支取请求屏能包括工程名、工程号、工程地址、支取数、支取日期、已经提交发票的参与方列表,以及还未提及发票的参与方列表。可按阶段代码组织参与方。对每一阶段代码,查看未决支取请求屏能包括请求金额、预算金额、支付金额、扣款和余额。FIG. 62 illustrates the View Pending Withdrawal Requests screen that can be associated with the View Pending Withdrawal Requests task 246. FIG. The GC can access the View Pending Withdrawal Requests screen through the Withdrawal Module 44 . The GC can select each party to be included in the withdrawal, confirm the withdrawal, and send notifications to each organization's signers in real time. However, the GC can also reject pending withdrawal requests, notify selected parties to re-enter the invoice and provide reasons for rejecting the withdrawal request. View pending withdrawal requests screen can include project name, project number, project address, withdrawal amount, withdrawal date, a list of parties that have submitted invoices, and a list of parties that have not yet mentioned invoices. Participants can be organized by phase code. For each stage code, the View Pending Withdrawal Requests screen can include requested amounts, budgeted amounts, paid amounts, debits, and balances.

图63示例说明能在未接收的支付金额任务274期间传送的发票细目拒绝通知。图63的通知能包括未接收将在用于特定工程的日期上、由支取的特定用户输入的付款和发票细目以及拒绝原因的声明。通知能包括分包商或材料供应商在支取关闭前,重新输入支付细目的请求。FIG. 63 illustrates an invoice line rejection notification that can be transmitted during the Unreceived Payment Amount task 274. The notification of FIG. 63 can include a statement that payment and invoice details to be entered by the particular user of the draw were not received on the date for the particular project and the reason for the rejection. Notifications can include requests by subcontractors or material suppliers to re-enter payment details before drawouts are closed.

图64示例说明能在未包括在支取中的发票任务272期间传送的、未包括在支取通知中的发票。图64的通知能包括参与方未提交用于工程的支取的核准誓词,以及参与方和所有他们的分包商将不包括在支取中的声明。通知能声明已经撤销所提交的所有誓词和发票。FIG. 64 illustrates an invoice not included in a withdrawal notification that can be transmitted during the Invoices not included in withdrawal task 272. The notice of Figure 64 can include an affidavit of approval that the parties have not submitted a payment for the Works, and a statement that the parties and all their subcontractors will not be included in the payment. The notice can state that all affidavits and invoices submitted have been revoked.

图65示例说明能与生成发票任务248(在图54中标记G702/703)有关的自动生成发票表单(例如与工业实践相一致的表单,诸如G702/703表单)。GC、分包商和材料供应商能通过支取模块44访问发票表单。分包商、材料供应商和/或建筑师能电子地签名发票表单(例如使用电子签名软件提供商如AlphaTrust Corportion的产品)。Figure 65 illustrates an automatically generated invoice form (eg, a form consistent with industry practice, such as a G702/703 form) that can be associated with the Generate Invoice task 248 (labeled G702/703 in Figure 54). GCs, subcontractors and material suppliers can access the invoice form through the withdrawal module 44. Subcontractors, material suppliers, and/or architects can sign invoice forms electronically (eg, using products from electronic signature software providers such as AlphaTrust Corporation).

图66示例说明能与誓词表单任务250有关的自动生成的誓词表单。GC能通过支取模块44访问誓词表单。GC能电子地签名誓词表单(例如使用电子签名软件提供商如AlphaTrust Corportion的产品)。FIG. 66 illustrates an automatically generated affidavit form that can be associated with the affidavit form task 250. The GC can access the affidavit form through the withdrawal module 44. The GC can sign the affidavit form electronically (for example using a product from an electronic signature software provider such as AlphaTrust Corporation).

图67示例说明能在资金可用任务252期间传送的资金可用通知。图67的通知包括指令,按照请求留置权放弃的链接以及当资金可用于释放工程上的支取时释放资金。FIG. 67 illustrates a funds available notification that can be sent during the funds available task 252. The notice of FIG. 67 includes instructions, a link to follow to request a lien waiver and to release the funds when they are available to release the drawdown on the works.

图68示例说明能与查看支取请求任务254有关的查看支取请求屏。GC能通过支取模块44访问查看支取请求屏。GC能查看支取的明细、授权资金以及请求留置权放弃。查看支取请求能包括工程名、工程号、工程地址、支取数、支取日期和支取的参与方列表。参与方列表能包括参与方名、阶段代码、是否已经接收留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和它们的留置权放弃。FIG. 68 illustrates a View Payout Requests screen that can be associated with the View Payout Requests task 254. The GC can access a view withdrawal request screen through the withdrawal module 44 . GCs can view details of withdrawals, authorize funds, and request lien releases. View withdrawal request can include project name, project number, project address, withdrawal amount, withdrawal date and withdrawal party list. The party list can include party name, phase code, whether a lien waiver has been received, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers.

图69示例说明能在签名留置权放弃任务256期间传送的签名留置权放弃通知。图69的通知能实时传送到所有支取参与方以及能包括已经授权工程计划的支取和请求分包商或材料供应商签名它的留置权放弃来接收支取请求的声明。FIG. 69 illustrates a signature lien waiver notification that can be communicated during the signature lien waiver task 256. The notification of FIG. 69 can be transmitted in real time to all drawing participants and can include a statement that has authorized drawing of the project plan and requested that the subcontractor or material supplier sign its lien waiver to accept the drawing request.

图70示例说明能与留置权放弃表单任务258有关的自动生成留置权放弃表单。分包商和材料供应商能通过支取模块44访问留置权放弃表单。留置权放弃表单能基于预算自动地生成,包括用于每一分包商或材料供应商的支出项。分包商和材料供应商能电子地签名留置权放弃表单(例如使用AlphaTrust Corportion的电子签名产品)。只要签名,能将留置权放弃68存储在电子保管箱/托管54中。Figure 70 illustrates an automatically generated lien waiver form that can be associated with the lien waiver form task 258. Subcontractors and material suppliers can access the lien waiver form through the withdrawal module 44 . Lien waiver forms can be automatically generated based on budgets, including expenditure items for each subcontractor or material supplier. Subcontractors and material suppliers can electronically sign lien waiver forms (eg, using AlphaTrust Corporation's electronic signature product). Lien release 68 can be stored in electronic safe deposit box/escrow 54 as long as it is signed.

图71示例说明能在留置权放弃签名任务266期间传送的留置权放弃签名通知。图71的通知能包括分包商或材料供应商已经签名用于工程的支取的他们的留置权放弃的声明。通知可包括对支取的细目以及迄今收到的留置权放弃的访问(权)。FIG. 71 illustrates a lien waiver signature notification that can be communicated during the lien waiver signature task 266. The notice of FIG. 71 can include a statement that the subcontractor or material supplier has signed their lien waiver for payment of the works. The notice may include access to a breakdown of the disbursements and lien waivers received to date.

图72示例说明能与查看支取请求任务268有关的查看支取请求屏。GC、分包商或材料供应商能通过支取模块44访问查看支取请求屏。查看支取请求屏能包括工程名、工程数、工程地址、支取数、支取日期和支取的参与方列表。参与方列表能包括参与方名、阶段代码、是否收到留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和他们的留置权放弃。FIG. 72 illustrates a View Payout Requests screen that can be associated with the View Payout Requests task 268. A GC, subcontractor, or material supplier can access a view payout request screen through the payout module 44 . View withdrawal request screen can include project name, project number, project address, withdrawal number, withdrawal date and withdrawal party list. The party list can include party name, phase code, whether a lien waiver has been received, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers.

图73示例说明能在签名所有留置权放弃360期间传送的所有留置权放弃签名通知。图73的通知能包括已经签名用于工程的支取的所有留置权放弃的声明。通知能包括查看支取明细的链接和支付资金。FIG. 73 illustrates an all lien waiver signed notice that can be transmitted during a signed all lien waiver 360. The notice of Figure 73 can include a waiver of all liens that have been signed for disbursement of the Works. Notifications can include links to view withdrawal details and disburse funds.

图74示例说明能与具有支付资金按钮的查看支取请求任务363有关的查看支取请求表单。GC(或建筑师、业主、业主的代表、贷方或产权保险公司)能访问查看支取请求表单和通过支取模块44和/或支取核准模块60来核准支取。查看支取请求屏能包括工程名、工程数、工程地址、支取数、支取日期、支取参与方的列表。参与方的列表能包括参与方名、阶段代码、是否接收留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和他们的留置权放弃。当GC支付资金时,基本上同时释放留置权放弃和将支付指令发送到ACH系统26。Figure 74 illustrates a View Payout Request form that can be associated with the View Payout Request task 363 with a Pay Funds button. The GC (or architect, owner, owner's representative, lender or title insurer) can access the withdrawal request form and approve the withdrawal through the withdrawal module 44 and/or the withdrawal approval module 60. The view withdrawal request screen can include a project name, project number, project address, withdrawal number, withdrawal date, and a list of withdrawal participants. The list of parties can include party name, phase code, whether to accept lien waiver, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers. When the GC disburses the funds, the lien waiver is released and payment instructions are sent to the ACH system 26 substantially simultaneously.

图75示例说明在付款支付任务264期间传送的付款支付通知。图75的通知能实时传送到所有支取参与方以及能包括对该工程的特定日期的计划内支取已经支付付款的声明。FIG. 75 illustrates a payment payment notification transmitted during a payment payment task 264. The notification of FIG. 75 can be transmitted in real time to all drawout parties and can include a statement that a planned drawdown for a specific date for the project has been paid.

图76示例说明能包括在管理系统环境过程102中的维护系统屏任务276。能由每一用户或每一组织使用维护系统屏任务276以便根据特定需要定制软件环境。例如,组织能定制用于他们的工程的阶段代码。维护系统屏任务276能由任何参与方,使用系统环境管理器52来执行。维护系统环境任务276能包括维护阶段代码任务278、管理员用户登录任务280、添加/编辑参数选用表单任务282、添加/编辑组织角色任务284、默认设置任务286、编辑通知任务288、默认配置任务290和添加/编辑用户角色任务292。FIG. 76 illustrates a Maintain System screen task 276 that can be included in the Manage System Environment process 102. The Maintain System screen task 276 can be used by each user or each organization to customize the software environment to specific needs. For example, organizations can customize phase codes for their projects. The maintain system screen task 276 can be performed by any party using the system environment manager 52 . Maintain system environment task 276 can include maintenance stage code task 278, administrator user login task 280, add/edit parameter selection form task 282, add/edit organization role task 284, default setting task 286, edit notification task 288, default configuration task 290 and Add/Edit User Role Task 292.

图77示例说明能与维护阶段代码任务278有关的维护阶段代码。每一参与方能通过系统环境管理器52,访问维护阶段代码。参与方能添加新的或删除被选预算项。FIG. 77 illustrates maintenance phase codes that can be associated with maintenance phase code tasks 278. Each participant can access the maintenance phase code through the system environment manager 52 . Participants can add new or delete selected budget items.

图78示例说明能与管理员用户登录任务280有关的管理用户登录屏。每一参与方能通过系统环境管理器52来访问管理员用户登录屏。组织的用户能输入用户名和使用该屏登录到系统上作为系统中的任一用户。FIG. 78 illustrates an administrative user login screen that can be associated with an administrator user login task 280. Each participant can access the administrator user login screen through the system environment manager 52 . Users of the organization can enter a user name and use this screen to log on to the system as any user in the system.

图79示例说明能与添加/编辑参数选用表任务282有关的添加/编辑参数选用表表单。CPMS 10的管理员能添加新的或删除被选参数选用表表目(例如状态列表、工程类型等等),用于由CPMS 10提供的各种下拉菜单。FIG. 79 illustrates an Add/Edit Pickles form that can be associated with the Add/Edit Pickles task 282. The CPMS 10 administrator can add new or delete selected pickle items (eg, status list, project type, etc.) for the various drop-down menus provided by CPMS 10.

图80示例说明能与添加/编辑组织角色任务284有关的添加/编辑组织角色表单。GC能通过系统环境管理器52,访问添加/编辑组织角色表单。GC能选择用于每一类型组织的安全许可(例如银行、产权保险公司、GC、分包商或建筑师)。FIG. 80 illustrates an Add/Edit Organization Role form that can be associated with the Add/Edit Organization Role task 284. The GC can access the Add/Edit Organizational Roles form through the System Environment Manager 52 . GCs can choose security clearances for each type of organization (eg bank, title insurance company, GC, subcontractor, or architect).

图81示例说明能与默认设置任务286有关的默认/配置设置表单。GC能通过系统环境管理器52访问默认/配置设置表单。GC能输入其优选设定值,诸如支取关闭提醒天数、支取开始提醒天数、支取请求最小超前时间、安全标识、监理是否将经ACH系统支付、是否等待所有留置权放弃,以及谁支付监理(例如银行、产权保险公司、业主、业主的代表或GC)。FIG. 81 illustrates a default/configuration setup form that can be associated with the default setup task 286. The GC can access the default/configuration settings form through the system environment manager 52 . The GC can enter its preferred settings, such as withdrawal close reminder days, withdrawal start reminder days, minimum lead time for withdrawal requests, security flags, whether the supervisor will pay through the ACH system, whether to wait for all liens to be waived, and who will pay the supervisor (e.g. bank, title insurance company, owner, owner's representative or GC).

图82示例说明能与编辑通知任务288有关的编辑通知表单。GC能通过系统环境管理器52访问编辑通知表单。GC能修改在各个过程期间传送的通知。根据需要,GC能选择特定通知和编辑默认通知。GC还能指定特定授权是否必要,诸如由银行授权来改变通知。FIG. 82 illustrates an edit notification form that can be associated with the edit notification task 288. The GC can access the edit notification form through the system environment manager 52 . The GC can modify the notifications sent during various processes. GC can select specific notifications and edit default notifications as needed. The GC can also specify whether certain authorizations are necessary, such as authorization by the bank to change notifications.

图83示例说明能与默认配置任务290有关的默认/配置过程表单。GC、业主、业主的代表、贷方等等能通过系统环境管理器52访问默认/配置过程表单,以便定制施工支付过程部分或改变用于施工支付过程部分的原则。例如,GC能定义和存储其自己的阶段代码。GC、业主、业主的代表、贷方等等能选择是否启动每一过程中的特定任务以及能访问编辑与任务有关的通知的每一个的链接。FIG. 83 illustrates a default/configuration process form that can be associated with the default configuration task 290. GCs, owners, owners' representatives, lenders, etc. can access default/configured process forms through the system environment manager 52 in order to customize or change the principles used for parts of the construction payment process. For example, the GC can define and store its own phase codes. The GC, owner, owner's representative, lender, etc. can choose whether to initiate specific tasks in each process and can access links for each to edit notifications related to the task.

图84示例说明能与添加/编辑用户角色任务292有关的添加/编辑用户角色表单。GC能通过系统环境管理器52访问添加/编辑用户角色表单。GC能选择角色用于特定用户,诸如系统管理员、系统帮助用户、本地管理员、常规用户以及仅查看访问。GC能添加新角色或删除被选角色。FIG. 84 illustrates an Add/Edit User Role form that can be associated with the Add/Edit User Role task 292. The GC can access the Add/Edit User Role form through the System Environment Manager 52. GC can select roles for specific users, such as system administrator, system help user, local administrator, regular user, and view-only access. GC can add new roles or remove selected roles.

图85示例说明能包括在管理支取过程96中的执行检查任务294。执行检查任务294能用来在每一支取前,计划和便于施工工程的检查,如果必要的话。执行检查任务294能由GC和监理使用支取模块94的检查模块58执行。执行检查任务294能包括检查所需任务296、检查所需表单任务298、准备实施检查任务300、查看先前检查任务302、输入检查任务304、输入检查报告任务306、检查报告表单任务308,以及检查报告失败任务310。FIG. 85 illustrates an Execution Check task 294 that can be included in the Manage Drawout process 96. Execute inspection tasks 294 can be used to plan and facilitate inspections of construction work, if necessary, prior to each withdrawal. Perform check task 294 can be performed by check module 58 of GC and supervisor usage drawout module 94 . Perform inspection tasks 294 can include inspection required tasks 296, inspection required forms tasks 298, prepare to perform inspection tasks 300, review previous inspection tasks 302, enter inspection tasks 304, enter inspection report tasks 306, inspection report form tasks 308, and inspect Report failed task 310.

图86示例说明能在准备实施检查通知任务300期间传送的准备实施检查通知。图86的通知能包括已经在某一日期,对一工程计划支取以及要求监理对该支取准备实施检查的声明。通知能声明检查应当仅在接收确认后实施。FIG. 86 illustrates a ready to conduct inspection notification that can be transmitted during the ready to conduct inspection notification task 300 . The notice of Figure 86 can include a statement that a project plan has been drawn on a certain date and that the supervisor is required to conduct an inspection of the readiness for the draw. The notification can state that inspections should only be performed after confirmation of receipt.

图87示例说明能在检查所需通知任务296期间传送的检查所需通知。图87的通知能包括计划支取为未决工程以及指定对该支取是否需要检查的链接的声明。FIG. 87 illustrates inspection required notifications that can be transmitted during the inspection required notifications task 296. The notification of FIG. 87 can include a statement that the planned withdrawal is pending work and a link specifying whether the withdrawal requires review.

图88示例说明能与检查所需任务298有关的所需检查屏。GC(或业主、业主的代表、贷方或产权保险公司)能通过支取模块44的检查模块58来访问所需检查屏。所需检查屏能包括工程名、工程数、支取数、业主名、支取日期、工程地址、以及参与方列表。参与方列表能包括请求金额、组织名称、组织角色、预算项、预算金额、支付金额、扣款以及余额。所需检查屏也能包括一般注释、监理的注释以及是否应当计划检查。Figure 88 illustrates a required inspection screen that can be associated with the inspection required task 298. The GC (or the owner, owner's representative, lender or title insurance company) can access the required inspection screens through the inspection module 58 of the drawout module 44 . Required check screens can include project name, project number, withdrawal number, owner name, withdrawal date, project address, and a list of parties involved. The party list can include request amount, organization name, organization role, budget item, budget amount, payment amount, chargeback, and balance. Required inspection screens can also include general comments, supervisor's comments, and whether inspections should be scheduled.

图89示例说明能在输入检查任务304期间传送的输入检查报告通知。图89的通知能包括已经授权对工程的按日期的支取时间表,以及接收方应当继续进行检查。通知能包括查看工程的明细的链接以及生成检查表。FIG. 89 illustrates an input inspection report notification that can be transmitted during an input inspection task 304. The notification of Figure 89 can include a date-by-date drawdown schedule for the work that has been authorized and that the recipient should proceed with inspections. Notifications can include links to view project details and generate checklists.

图90示例说明能与输入检查报告任务306有关的输入检查报告表单。监理能在检查报告表单上输入检查的明细。检查报告表单能包括工程项、工程号、支取号、支取日期、业主名称、工程地址、检查日期和一般检查注释。FIG. 90 illustrates an input check report form that can be associated with the input check report task 306 . Supervisors can enter inspection details on the inspection report form. The inspection report form can include project item, project number, withdrawal number, withdrawal date, owner name, project address, inspection date and general inspection notes.

图91示例说明能与检查报告表单任务308有关的检查报告表单屏。GC、业主、业主的代表、产权保险公司或监理能通过支取模块44的检查模块58来访问检查报告表单屏。FIG. 91 illustrates an inspection report form screen that can be associated with the inspection report form task 308. The inspection report form screen can be accessed through the inspection module 58 of the withdrawal module 44 by the GC, the owner, the owner's representative, the title insurance company, or the superintendent.

图92示例说明能在检查报告失败任务310期间传送的检查报告失败通知。图92的通知能包括在特定日期实施的检查后,存在对于该工程的高关注等级。通知能包括访问检查报告表单的链接。FIG. 92 illustrates inspection report failure notifications that can be communicated during the inspection report failure task 310 . The notification of Figure 92 can include that there is a high level of concern for the project following inspections performed on a particular date. The notification can include a link to access the inspection report form.

图93示例说明能与查看先前检查任务302有关的查看先前检查屏。GC、业主、业主的代表、产权保险公司或监理能通过支取模块44的检查模块58来访问查看先前检查屏,以及能选择在特定日期执行的检查。FIG. 93 illustrates the view previous exams screen that can be associated with the view previous exams task 302 . The GC, owner, owner's representative, title insurer, or supervisor can access a previous inspections screen through the inspection module 58 of the withdrawal module 44 and can select inspections to be performed on specific dates.

图94示例说明能包括在管理支取过程96中的核准支取请求过程312。能使用核准支取请求过程312来确认执行必要的检查,以核准施工支付过程中的每一支取,以及发出留置权放弃。使用支取模块44的支取核准模块60,能由GC和/或GC线上的任何参与方(诸如业主、业主的代表、产权保险公司、建筑师等等)执行核准支取请求过程312。只要已经启动工程,CPMS 10能用来核准与施工过程有关的任何类型的支付。CPMS 10能提供并行核准(例如GC和业主必须核准支取)或串行核准(例如建筑师必须核准该支取,然后是业主,然后是贷方)。CPMS 10能用来配置用于每一工程的核准过程。CPMS 10能用来核准用于预算的更改订单或双方间约定的特定金额。例如,能使用CPMS 10来从GC和/或任何GC的线上的参与方获得用于超出某一金额的更改订单的核准或核准超出该限制后的所有更改订单。核准支取请求过程312能包括授权支取请求一任务314、授权支取请求一-拒绝任务316、检查确认任务318、检查授权任务320、支付细目修改任务322、授权支取请求二-通知任务324、授权支取请求二任务326、授权支取请求二拒绝任务328、授权支取请求二核准任务330以及发出留置权放弃任务332。FIG. 94 illustrates an Approved Withdrawal Request process 312 that can be included in the Manage Withdrawal process 96. The Approve Drawout Request process 312 can be used to confirm that the necessary checks are performed to authorize each drawdown in the construction payment process and to issue a lien release. Using the drawout approval module 60 of the drawout module 44, the approve drawout request process 312 can be performed by the GC and/or any party on the GC line, such as the owner, owner's representative, title insurance company, architect, etc. CPMS 10 can be used to authorize any type of payment related to the construction process as long as work has been initiated. CPMS 10 can provide parallel approval (eg the GC and owner must approve the draw down) or serial approval (eg the architect must approve the draw down, then the owner, then the lender). CPMS 10 can be used to configure the approval process for each project. CPMS 10 can be used to approve change orders for budgeting or specific amounts agreed between parties. For example, the CPMS 10 can be used to obtain approval from the GC and/or any of the GC's on-line participants for change orders above a certain amount or approval of all change orders above that limit. Approval withdrawal request process 312 can include authorization withdrawal request one task 314, authorization withdrawal request one-rejection task 316, check and confirmation task 318, check authorization task 320, payment details modification task 322, authorization withdrawal request two-notification task 324, authorization withdrawal Request Two Task 326 , Authorize Withdrawal Request Two Reject Task 328 , Authorize Withdrawal Request Two Approve Task 330 , and Issue Lien Waiver Task 332 .

图95示例说明能与授权支取请求一任务314有关的授权支取请求一表单或授权誓词表单。GC、业主、业主的代表或产权保险公司能通过支取模块44,访问授权支取请求一表单。授权支取请求一表单能包括工程名、工程数、业主、工程地址、支取号以及支取日期。授权支取请求一表单能包括用于每一组织的任何输入,包括请求金额、组织名、组织任务、预算项、预算金额、支付金额、扣款以及余额。授权支取请求一表单能包括能接收的授权,未解决的授权、是否要求检查、输入授权密码的能力以及拒绝授权和指明原因的能力。FIG. 95 illustrates an Authorization Withdrawal Request-Form or Authorization Affidavit Form that can be associated with the Authorization Withdrawal Request-Task 314. Through the withdrawal module 44, the GC, the owner, the owner's representative, or the title insurance company can access an authorized withdrawal request form. The authorized withdrawal request form can include project name, project number, owner, project address, withdrawal number and withdrawal date. Authorized Withdrawal Requests—a form can include any input for each organization, including request amount, organization name, organization task, budget item, budget amount, payment amount, debit, and balance. Authorization Withdrawal Request - A form can include authorizations that can be received, authorizations that are outstanding, whether a check is required, the ability to enter an authorization password, and the ability to deny an authorization and specify the reason.

图96示例说明能在授权支取请求一-拒绝任务316期间传送的授权第一支取拒绝通知。图96的通知能包括已经拒绝授权用于工程的支取以及查看和/或修改支取细目的链接的声明。FIG. 96 illustrates an Authorized First Withdrawal Denied notification that can be transmitted during the Authorized Withdrawal Request One-Rejected task 316. The notification of FIG. 96 can include a statement that authorization for withdrawal for the project has been denied and a link to view and/or modify the withdrawal details.

图97示例说明能在检查确认任务318期间传送的检查确认通知。图97的通知能包括已经授权为工程计划的支取以及继续进入现场检查的指令,以及查看工程的明细以及生成检查表的链接的声明。FIG. 97 illustrates check confirmation notifications that can be sent during a check confirmation task 318. The notification of Figure 97 can include instructions to have authorized withdrawal of the project plan and proceed to site inspection, as well as a statement to view project details and a link to generate a checklist.

图98示例说明能在支付明细修改任务322期间传送的支付明细修改通知。图98的通知能包括还未接收用于支取的工程的支付明细。通知能列出工程参与的列表细目以及该支付的应付款、组织角色、预算项和支付金额。FIG. 98 illustrates a payment detail modification notification that can be transmitted during the payment detail modification task 322. The notification of Figure 98 can include payment details for projects not yet received for payout. Notifications can list the breakdown of project participation along with the payables, organizational roles, budget items and payment amounts for that payment.

图99示例说明在检查授权任务320期间传送的检查授权通知。图99的通知能包括已经授权用于工程的现场检查的声明。FIG. 99 illustrates the inspection authorization notification communicated during the inspection authorization task 320. The notice of Figure 99 can include a statement that an on-site inspection of the works has been authorized.

图100示例说明能在授权支取请求二-通知任务324期间传送的授权支取请求二通知。图100的通知能包括要求接收方对为工程所输入的检查报告进行核查,在支取能进入下一阶段前,要求接收方的授权(例如询问支取接收方有关留置权放弃)以及查看检查报告以及准许或否决该支取的授权的声明。Diagram 100 illustrates an Authorized Withdrawal Request Two Notification that can be transmitted during the Authorized Withdrawal Request Two - Notify task 324 . The notification of Figure 100 can include requesting the recipient to review the inspection report entered for the project, requesting the recipient's authorization before the withdrawal can proceed to the next stage (e.g., asking the withdrawal recipient about a lien waiver) and reviewing the inspection report and A statement of authorization to grant or deny the withdrawal.

图101示例说明能与授权支取请求二任务326有关的授权支取请求二表单。GC、业主、业主的代表或产权保险公司能通过支取模块44的支取核准模块60,访问授权支取请求二表单。授权支取请求二表单能包括工程名、工程号、业主、工程地址、支取号以及支取日期。授权支取请求二表单能包括用于每一组织的项,包括请求金额、组织名称、组织角色、预算项、预算金额、支付金额、扣款以及余额。授权支取请求二表单能包括所接收的授权、未解决的、是否要求检查、输入授权密码的能力以及拒绝授权和表明原因的能力。Figure 101 illustrates an Authorized Withdrawal Request Two form that can be associated with the Authorized Withdrawal Request Two task 326. The Authorized Withdrawal Request II form can be accessed by the GC, the owner, the owner's representative, or the title insurance company through the Withdrawal Approval module 60 of the Withdrawal module 44 . The second form of authorized withdrawal request can include project name, project number, owner, project address, withdrawal number and withdrawal date. The authorized withdrawal request two form can include items for each organization, including request amount, organization name, organization role, budget item, budget amount, payment amount, debit, and balance. The Authorization Withdrawal Request Two Form can include authorizations received, outstanding, whether a check is required, the ability to enter an authorization password, and the ability to deny an authorization and indicate a reason.

图102示例说明能在授权支取请求二拒绝任务328期间传送的授权支取请求二拒绝通知。图102的通知能包括已经由参与方拒绝授权为工程计划的支取以及在没有该授权的情况下,支取不能进行的声明。Figure 102 illustrates an Authorized Withdrawal Request Two Deny notification that can be transmitted during the Authorized Withdrawal Request Two Denied task 328. The notification of FIG. 102 can include a statement that authorization for withdrawal of the project has been denied by the participating party and that withdrawal cannot proceed without such authorization.

图103示例说明在授权支取请求二任务330期间传送的授权支取请求二准许通知。图103的通知能包括已经由参与方授权工程支取的声明。FIG. 103 illustrates an Authorized Withdrawal Request Two Grant Notification transmitted during the Authorized Withdrawal Request Two task 330 . The notification of Figure 103 can include a statement that project withdrawal has been authorized by the party.

图104示例说明在发出留置权放弃任务332期间传送的发出留置权放弃通知。图104的通知能包括已经由参与方授权工程计划的支取以及请求接收方发出留置权放弃以便接收支取付款,以及允许接收方发出留置权放弃的链接的声明。Figure 104 illustrates the Issue Lien Waiver notification communicated during the Issue Lien Waiver task 332 . The notification of FIG. 104 can include a statement that withdrawal of the project has been authorized by the party and a request to the recipient to issue a lien waiver in order to receive payment for the withdrawal, as well as a link allowing the recipient to issue a lien waiver.

图105示例说明能包括在管理更改订单工程98中的更改请求过程334。更改请求过程334能用来通过添加新支出项、通过改变现有支出项或通过终止分包商或使剩余资金用于其他参与方,来修改整个工程预算(通常扩大预算)。能由GC、建筑师、业主、业主的代表、贷方或分包商,使用更改订单模块48来执行更改请求过程334。更改请求过程334能包括改变请求任务336、改变请求发出任务338以及授权改变请求任务340。FIG. 105 illustrates a change request process 334 that can be included in manage change order engineering 98 . The change request process 334 can be used to revise the overall project budget (generally expanding the budget) by adding new expense items, by changing existing expense items, or by terminating subcontractors or making remaining funds available to other parties. The change request process 334 can be performed using the change order module 48 by the GC, architect, owner, owner's representative, lender, or subcontractor. Change request process 334 can include change request task 336 , change request issue task 338 , and authorize change request task 340 .

图106示例说明能与更改请求任务336有关的更改请求表单。GC或分包商能通过更改订单模块48,访问更改请求表单。更改请求表单能包括工程名、工程号、工程地址、业主名以及更改金额清单。更改金额清单可包括更改金额、组织名、组织任务、预算项、预算金额、支付金额和余额。更改请求表单能包括更改描述字段。更改请求表单能包括支付表单是贷款还是业主付款,支付方法是贷款、业主支票还是信用卡。更改请求表单能包括当前估计完成日期和新的估计完成日期。Figure 106 illustrates a change request form that can be associated with a change request task 336. The GC or subcontractor can access the change request form through the change order module 48 . The change request form can include project name, project number, project address, owner name, and a list of change amounts. The change amount list may include change amount, organization name, organization task, budget item, budget amount, payment amount, and balance. A change request form can include a change description field. A change request form can include whether the payment form is a loan or owner payment, and whether the payment method is loan, owner's check, or credit card. A change request form can include the current estimated completion date and a new estimated completion date.

图107示例说明能在更改请求发出任务338期间传送的更改请求发出通知。图107的通知能包括能在工程上发出以及为未决授权的更改请求的声明。通知能包括更改请求的明细、组织名、预算项、当前预算金额和更改金额。FIG. 107 illustrates a change request issue notification that can be communicated during a change request issue task 338 . The notification of FIG. 107 can include a statement that can be issued on engineering as well as pending authorized change requests. Notifications can include details of the change request, organization name, budget line, current budget amount, and change amount.

图108示例说明能在授权更改请求任务340期间传送的授权更改请求通知。图108的通知能包括已经在工程上发出更改请求以及对该更改请求要求接收方核准的声明。该通知能包括查看更改请求的明细的链接,以及核准或拒绝更改请求。FIG. 108 illustrates an authorization change request notification that can be transmitted during an authorization change request task 340 . The notification of FIG. 108 can include a statement that a change request has been engineering made and that the recipient's approval is required for the change request. The notification can include links to view the details of the change request, and to approve or deny the change request.

图109示例说明能包括在管理更改订单过程98中的过程更改请求过程342。过程更改请求过程342能用来确定由适当的参与方,诸如建筑师、贷方、产权保险公司、业主、业主的代表或GC,授权对该预算所做的更改。使用更改订单模块48,由GC、建筑师、贷方、产权保险公司、业主、业主的代表、贷方或分包商执行过程更改请求过程342。过程更改请求过程342能包括查看未决更改请求任务344、授权更改请求任务346、更改请求拒绝任务348和更改请求核准任务350。FIG. 109 illustrates a process change request process 342 that can be included in the manage change order process 98. The process change request process 342 can be used to determine that changes to the budget are authorized by the appropriate parties, such as architects, lenders, title insurers, owners, owners' representatives, or GC. Using the change order module 48, a process change request process 342 is performed by the GC, architect, lender, title insurance company, owner, owner's representative, lender, or subcontractor. Process Change Request Process 342 can include View Pending Change Requests task 344 , Authorize Change Requests task 346 , Change Request Rejection task 348 , and Change Request Approval task 350 .

图110示例说明能与查看未决更改请求任务344有关的查看未决更改请求屏。GC、分包商、业主、业主的代表、贷方或建筑师能通过更改订单模块48,访问查看未决更改请求屏。查看未决更改请求屏能包括工程名、工程号、工程地址、业主名和更改金额清单。更改金额清单能包括更改金额、组织名、组织角色、预算项、预算金额、支付金额和余额。查看未决更改请求屏能包括改变描述字段。查看未决更改请求屏能包括支付方法是贷款、业主支票还是信用卡。查看未决更改请求屏能包括新估计的完成日期、所接收的授权以及未决授权。FIG. 110 illustrates a View Pending Change Requests screen that can be associated with the View Pending Change Requests task 344 . The View Pending Change Requests screen can be accessed by the GC, subcontractor, owner, owner's representative, lender or architect through the change order module 48 . The View Pending Change Requests screen can include a list of project name, project number, project address, owner name and change amount. The change amount list can include change amount, organization name, organization role, budget item, budget amount, payment amount, and balance. The View Pending Change Requests screen can include a change description field. The View Pending Change Requests screen can include whether the method of payment is a loan, owner's check, or credit card. The View Pending Change Requests screen can include new estimated completion dates, authorizations received, and authorizations pending.

图111示例说明能与授权更改请求任务346有关的授权更改请求表单。GC、分包商、业主、业主的代表、贷方或建筑师能通过更改订单模块48来访问授权更改请求表单。授权更改请求表单能包括工程名、工程号、工程地址、业主名和更改金额清单。更改金额清单能包括更改金额、组织名、组织角色、预算项、预算金额、支付金额和余额。授权未决更改请求屏能包括改变描述字段。授权未决更改请求表单能包括支付方法是贷款、业主支票还是信用卡。授权未决更改请求表单能包括新估计的完成日期、所接收的授权以及未决授权。权未决更改请求表单能包括输入密码和授权更改请求的能力以及拒绝更改请求和输入拒绝原因的能力。Figure 111 illustrates an authorization change request form that can be associated with the authorization change request task 346. The GC, subcontractor, owner, owner's representative, lender, or architect can access the authorized change request form through the change order module 48 . The authorized change request form can include a list of project name, project number, project address, owner name and change amount. The change amount list can include change amount, organization name, organization role, budget item, budget amount, payment amount, and balance. The Authorization Pending Change Request screen can include a change description field. The Authorization Pending Change Request form can include whether the method of payment is a loan, owner's check, or credit card. The Authorization Pending Change Request form can include new estimated completion dates, authorizations received, and pending authorizations. The Pending Change Request form can include the ability to enter a password and authorize a change request and the ability to reject a change request and enter a reason for the rejection.

图112示例说明能在更改请求拒绝任务348期间传送的更改请求拒绝通知。图112的通知能包括已经由参与方拒绝为工程,在某一日期发出的更改请求的声明。Figure 112 illustrates a change request rejection notification that can be transmitted during the change request rejection task 348. The notification of FIG. 112 can include a statement that a change request for a project has been rejected by a party by a certain date.

图113示例说明能在更改请求核准任务350期间传送的更改请求核准通知。图113的通知能包括已经由参与方(例如领导)核准用于工程的在某一日期发出的更改请求。仅使用更改请求来通过添加新支出项、通过修改现有的支出项,或通过终止分包商或使剩余资金用于其他参与方,修改整个工程预算(通常扩大预算)。能使用CPMS 10来确定由适当的参与方,诸如建筑师、贷方、产权保险公司、业主、业主代表或GC,授权对该预算所做的更改。当适当的参与方已经核准更改请求时,传送图113的通知。FIG. 113 illustrates a change request approval notification that can be transmitted during the change request approval task 350 . The notification of FIG. 113 can include a change request issued on a certain date that has been approved for engineering by a party involved (eg, leadership). Change requests are used only to modify the overall project budget (often expanding the budget) by adding new expense lines, by modifying existing expense lines, or by terminating subcontractors or making remaining funds available to other parties. The CPMS 10 can be used to determine that changes to the budget are authorized by the appropriate parties, such as the architect, lender, title insurer, owner, owner's representative, or GC. The notification of Figure 113 is transmitted when the change request has been approved by the appropriate parties.

图114示例说明能包括在管理更改订单过程98中的更改工程参与方过程352。例如,能使用更改工程参与方过程352来终止一个分包商并使剩余资金可用于另一参与方(诸如替代分包商)。更改工程参与方过程352能由GC或分包商使用更改订单模块48来执行。更改工程参与方过程352能包括更改参与任务354、核对参与方删除任务356和更改誓言书任务358。FIG. 114 illustrates a change engineering party process 352 that can be included in the manage change order process 98. For example, the change engineering party process 352 can be used to terminate a subcontractor and make remaining funds available to another party (such as a replacement subcontractor). The change engineering party process 352 can be performed by a GC or a subcontractor using the change order module 48 . Change engineering party process 352 can include change party task 354 , check party deletion task 356 , and change affidavit task 358 .

图115示例说明能与更改参与方任务354有关的更改参与方屏。GC或分包商能通过更改订单模块48来访问更改参与方屏。更改参与方屏能包括工程名、工程号、业主名、工程地址和工程的当前状态。更改参与方屏能包括能修改的组织的列表。组织列表能包括组织名、组织角色、预算项、预算金额、支付金额、扣款、余额和删除每一参与方的链接。FIG. 115 illustrates a change party screen that can be related to the change party task 354 . A GC or subcontractor can access the change party screen through the change order module 48 . The change participant screen can include project name, project number, owner name, project address and current status of the project. The Change Party screen can include a list of organizations that can be modified. The organization list can include organization name, organization role, budget item, budget amount, payment amount, chargeback, balance and a link to delete each party.

图116示例说明能与核对参与方删除任务356有关的核对参与方删除屏。GC或分包商能通过更改订单模块48来访问核对参与方删除屏。核对参与方删除屏能包括工程名、工程号、业主名、工程地址,以及有关将删除的参与方的信息(例如组织名、组织角色、预算项、预算金额、支付金额、扣款和余额)。核对参与方删除屏能包括能力来指明参与方是否已经实质上参与该工程。FIG. 116 illustrates a checkout party deletion screen that can be associated with a checkout party deletion task 356 . The GC or subcontractor can access the reconciliation party deletion screen through the change order module 48. Check party deletion screen can include project name, project number, owner name, project address, and information about the party to be deleted (e.g. organization name, organization role, budget item, budget amount, payment amount, deduction, and balance) . The checkout party deletion screen can include the ability to indicate whether a party has substantially participated in the project.

图117示例说明能与更改誓言书任务358有关的更改誓言书屏。GC或分包商能通过更改订单模块48来访问更改誓言书屏。更改誓言书屏能包括工程名、工程号、业主名、工程地址、工程的当前状态、预算金额、先前到期支付的金额和延期金额以及剩余预算。更改誓言书屏能包括输入注释的字段和输入密码的能力以及授权誓言书修改。Figure 117 illustrates the Change Affidavits screen that can be associated with the Change Affidavits task 358. The GC or subcontractor can access the change affidavit screen through the change order module 48. The change oath screen can include the project name, project number, owner name, project address, current status of the project, budgeted amount, previously due and deferred amounts, and remaining budget. The Change Affidavit screen can include fields to enter notes and the ability to enter a password and authorize affidavit modification.

图118示例说明能包括在管理工程过程94中的维护工程屏任务360。维护工程屏任务360能用来编辑工程配置文件、联系人信息和清算工程。维护工程屏任务360能由GC、贷方、业主、或业主代表,使用工程模块28来执行。维护工程屏任务360能包括工程配置文件任务362、工程联系人信息任务364、工程信息任务366和关闭工程任务368。FIG. 118 illustrates maintenance engineering screen tasks 360 that can be included in the manage engineering process 94. The Maintain Project screen task 360 can be used to edit project configuration files, contact information and clear projects. Maintenance engineering screen tasks 360 can be performed by the GC, lender, owner, or owner's representative using the engineering module 28 . Maintain engineering screen tasks 360 can include an engineering configuration file task 362 , an engineering contact information task 364 , an engineering information task 366 , and a close engineering task 368 .

图119示例说明能与工程配置文件任务362有关的工程配置文件表单。GC、贷方、业主、业主的代表能通过工程模块28访问工程配置文件表单。GC、贷方、业主、业主的代表能输入请求信息,诸如工程信息、工程资金信息、工程业主信息、现场信息和GC信息。FIG. 119 illustrates a project profile form that can be associated with the project profile task 362. GCs, lenders, owners, owners' representatives can access the engineering configuration file form through the engineering module 28 . GC, lender, owner, owner's representative can enter request information such as project information, project funding information, project owner information, site information, and GC information.

图120示例说明能与工程联系人信息任务364有关的工程联系人信息屏。GC、贷方、业主、业主的代表能通过工程模块28来访问工程联系人信息。工程联系人信息屏能包括工程名、工程标识、工程地址和工程参与方的联系人信息列表。联系人信息的列表能包括参与方标识号、组织名称、组织角色、工程管理名、联系人电子邮件地址和联系人电话号码。Figure 120 illustrates an engineering contact information screen that can be associated with the engineering contact information task 364. GCs, lenders, owners, owners' representatives can access engineering contact information through the engineering module 28 . The project contact information screen can include project name, project identification, project address and contact information list of project participants. The list of contact information can include a party identification number, organization name, organization role, project management name, contact email address, and contact phone number.

图121示例说明能与创建工程信息任务366有关的工程信息屏。GC、贷方、业主、业主的代表能通过工程模块28访问工程信息屏。工程信息屏能包括工程信息、现场信息、工程业主信息和GC信息。FIG. 121 illustrates a project information screen that can be associated with the create project information task 366. GCs, lenders, owners, owners' representatives can access the engineering information screen through the engineering module 28 . The project information screen can include project information, site information, project owner information and GC information.

图122示例说明能与关闭工程任务368有关的关闭工程屏。GC、贷方、业主、业主的代表能通过工程模块28访问关闭工程屏。关闭工程屏能包括工程名、贷款帐号、业主名和关闭工程的能力。FIG. 122 illustrates a close engineering screen that can be associated with a close engineering task 368. GC, lender, owner, owner's representative can access the engineering module 28 to close the engineering screen. The close project screen can include project name, loan account number, owner name and the ability to close the project.

图123示例说明能包括在管理系统环境过程102中的管理访问屏任务370。通过在施工支付过程期间,能使用管理访问屏任务370来定制显示给特定用户或组织的各种屏。例如,管理访问屏任务370可用于包含在施工支付过程期间显示在屏上的一个或多个组织的商标或徽标(例如,贷方的商标能包括在每一屏幕的右上角)。另外,能使用管理访问屏任务370来根据特定用户或组织的喜好或需求来修改特定表单或屏幕的布局。能由任一参与方,使用系统环境管理器52,执行管理访问屏任务370。管理访问屏任务370能包括登录任务372、退出任务374、工程主页任务376、重设密码任务378、主屏任务380、浏览工程任务382、遗忘密码任务384和你的密码任务386。FIG. 123 illustrates an Administration Access Screen task 370 that can be included in the Manage System Environment process 102. The various screens displayed to specific users or organizations can be customized using the Manage Access Screens task 370 through the construction payment process. For example, the Manage Access Screen task 370 may be used to include one or more organization's logos or logos displayed on the screen during the construction payment process (eg, the lender's logo could be included in the upper right corner of each screen). Additionally, the Manage Access Screens task 370 can be used to modify the layout of a particular form or screen according to the preferences or needs of a particular user or organization. The manage access screen task 370 can be performed by any party, using the system environment manager 52 . Administrative access screen tasks 370 can include login tasks 372 , logout tasks 374 , engineering home tasks 376 , reset password tasks 378 , home screen tasks 380 , browse engineering tasks 382 , forgot password tasks 384 , and your password tasks 386 .

图124示例说明与登录任务372有关的登录屏。每一参与方能通过访问管理器38,访问登录屏。参与方能输入用户名和密码来登录。如果用户遗忘他或她的密码,登录屏能提供链接。FIG. 124 illustrates a login screen associated with a login task 372. Through the access manager 38, each party can access the login screen. Participants can enter a user name and password to log in. If the user forgets his or her password, the login screen can provide a link.

图125示例说明能与退出任务374有关的退出屏。每一参与方能通过访问管理器38,访问退出屏。退出屏能确认用户已经退出。Figure 125 illustrates an exit screen that can be associated with exiting a task 374. Through the access manager 38, each participant can access the exit screen. The logout screen confirms that the user has logged out.

图126示例说明能与工程主页任务376有关的工程主页屏。每一参与方能通过访问管理器38,访问工程主页屏。工程主页屏能包括工程名、新消息的数量以及读取新消息的链接。工程主页能包括工程概述信息(包括工程时间表进度条和资金支付进度条)、完成支取信息(包括支取数、支取日期和支取信息的链接)、未决支取信息(包括支取数和起始日期)。工程主页能包括几个动作的链接、表单或屏幕(包括工程配置文件、工程预算、查看工程参与方、设置发票码、管理工程用户、产权保险公司核准跟踪、初始化未计划支取等等)。FIG. 126 illustrates an Engineering Home screen that can be associated with the Engineering Home task 376. Each participant can access the project home screen through the access manager 38 . The project home screen can include the project name, the number of new messages, and a link to read new messages. The project home page can include project overview information (including project schedule progress bar and fund payment progress bar), completed withdrawal information (including withdrawal amount, withdrawal date and link to withdrawal information), pending withdrawal information (including withdrawal amount and start date ). The project home page can include links, forms or screens for several actions (including project configuration files, project budgets, view project participants, set invoice codes, manage project users, title insurance company approval tracking, initiate unplanned drawdowns, etc.).

图127示例说明能与重设密码任务378有关的重设密码屏。每一参与方能通过访问管理器38来访问重设密码屏。参与方可两次输入新密码以改变与特定用户名相关联的密码。FIG. 127 illustrates a reset password screen that can be associated with the reset password task 378. Each party can access the reset password screen through the access manager 38 . A participant may enter a new password twice to change the password associated with a particular username.

图128示例说明用于与主屏任务380有关的特定用户的主屏。每一参与方能通过访问管理器38来访问主屏。主屏能列出参与方涉及的工程,以及与每一工程有关的新消息的数量以及读取新消息的链接。FIG. 128 illustrates a home screen for a particular user related to home screen tasks 380 . Each participant can access the main screen through the access manager 38 . The main screen can list the projects involved by the party, as well as the number of new messages related to each project and the link to read the new messages.

图129示例说明能与浏览工程任务382有关的浏览工程屏。每一参与方能通过访问管理器38来访问浏览工程屏。浏览工程屏能包括工程搜索特征以及工程列表。工程列表能包括工程名、GC名、编辑工程的链接以及选择一个或多个工程来浏览的能力。FIG. 129 illustrates a browse engineering screen that can be associated with the browse engineering task 382. Each participant can access through the access manager 38 to browse project screens. The Browse Projects screen can include a project search feature as well as a project list. The project list can include the project name, GC name, a link to edit a project, and the ability to select one or more projects to browse.

图130示例说明能与遗忘密码任务384有关的遗忘密码屏。每一参与方能通过访问管理器38来访问遗忘密码屏。用户能输入他的或她的用户名和电子邮件地址,系统能将密码电邮给用户。Figure 130 illustrates a Forgot Password screen that can be associated with the Forgot Password task 384. Each participant can access the forgotten password screen through the access manager 38 . The user can enter his or her username and email address, and the system can email the password to the user.

图131示例说明能在你的密码任务386期间传送的你的密码。图131的通知能包括你请求将你的密码电邮给你、密码以及下次你登录时使用该密码的请求的声明。Figure 131 illustrates your password that can be transmitted during your password task 386. The notification of FIG. 131 can include a statement that you request that your password be emailed to you, the password, and a request to use that password the next time you log in.

图132示例说明能包括在管理系统环境过程102中的管理消息屏过程388。管理消息屏过程388能用来查看消息、创建消息或查看系统状态消息。管理消息屏过程388可由任何参与方使用系统环境管理器52来执行。管理消息屏过程388能包括查看消息任务390、查看特定消息任务392、创建消息任务394和状态消息任务396。FIG. 132 illustrates an Admin Message Screen process 388 that can be included in the Admin System Environment process 102. The Manage Messages screen process 388 can be used to view messages, create messages, or view system status messages. The manage message screen process 388 can be performed by any party using the system environment manager 52 . Manage message screen process 388 can include view message task 390 , view specific message task 392 , create message task 394 , and status message task 396 .

图133示例说明能与查看消息任务390有关的查看消息屏。每一参与方能通过系统环境管理器52来访问查看消息任务390。查看消息屏能包括用户名、指定所显示消息的类型的能力(例如未读、最近、所有、发送消息或归档),以及所指定的消息的类型的列表。消息的列表能包括选择特定消息的能力、消息日期、工程名、消息主题以及是否要求动作。查看消息屏也能提供归档被选消息和移动到消息的另一屏的能力。FIG. 133 illustrates a View Messages screen that can be associated with the View Messages task 390. Each participant can access the view message task 390 through the system environment manager 52 . The View Messages screen can include a user name, the ability to specify the type of message displayed (eg, unread, recent, all, sent message, or archived), and a list of the types of messages specified. The list of messages can include the ability to select a specific message, message date, project name, message subject, and whether action is required. The View Messages screen can also provide the ability to archive selected messages and move to another screen of messages.

图134示例说明能由用户查看的特定消息。特定消息能包括在此所示和所述的任一通知。Figure 134 illustrates specific messages that can be viewed by the user. Specific messages can include any of the notifications shown and described herein.

图135示例说明能与创建消息任务394有关的创建/发送消息屏。每一参与方能通过系统环境管理器52来访问创建/发送消息屏。用户能输入工程名、是否将消息发送到组织或用户、组织名、用户名、消息主题和消息。FIG. 135 illustrates the Create/Send Message screen that can be associated with the Create Message task 394. Each party can access the create/send message screen through the system context manager 52. User can input project name, whether to send message to organization or user, organization name, user name, message subject and message.

图136示例说明能与状态消息任务396有关的状态消息屏。每一参与方能通过系统环境管理器52来访问状态消息屏。状态消息屏能发送消息,诸如已经初始化用于工程的支取以及已经通知所有参与方的声明。状态消息屏能包括组织或用户主页的链接。Figure 136 illustrates a status message screen that can be associated with the status message task 396. Each participant can access the status message screen through the system context manager 52 . The status message screen can send messages, such as a statement that the withdrawal for the project has been initiated and that all parties involved have been notified. The status message screen can include links to organization or user home pages.

图137-153示例说明根据本发明的另外实施例的管理施工支付过程的方法。结合参考图1-136和图154-179所示和所述的本发明的实施例来使用图137-153的方法的各方面。137-153 illustrate a method of managing the construction payment process according to additional embodiments of the invention. Aspects of the method of Figures 137-153 are used in conjunction with embodiments of the invention shown and described with reference to Figures 1-136 and Figures 154-179.

图154-179是根据本发明的又一实施例的管理施工支付过程的方法的输入/输出图。结合参考图1-136和图137-153所示和所述的本发明的实施例来使用图154-179的方法的各方面。154-179 are input/output diagrams of a method of managing a construction payment process according to yet another embodiment of the present invention. Aspects of the method of Figures 154-179 are used in conjunction with the embodiments of the invention shown and described with reference to Figures 1-136 and Figures 137-153.

图155包括公开工程任务、创建支取时间表单任务和识别和分配工程角色任务,其中每个由GC来执行。输入预算任务能由业主、业主的代表、GC、贷方或产权保险公司执行。更新细目任务能由GC对分包商和/或材料供应商执行,或由业主、贷方或产权保险公司对任何类型的参与方执行。关闭工程任务能由产权保险公司、GC或贷方执行。Figure 155 includes a Disclose Engineering Task, Create Drawout Time Sheet task, and Identify and Assign Engineering Role task, each of which is performed by the GC. The task of entering a budget can be performed by the owner, the owner's representative, the GC, the lender, or the title insurance company. The update itemization task can be performed by the GC on subcontractors and/or material suppliers, or by the owner, lender or title insurer on any type of party involved. Closing tasks can be performed by the title insurance company, GC or lender.

图156包括进入工程明细任务,其中,系统假定,在公开工程前,工程已经具有来自所有必要机构和参与组织的完全许可。图156包括输入贷款明细,其中贷方可以选择仅输入用于法律和商业原因的信息。如果该工程不存在贷款,不输入信息。Figure 156 includes the Enter Project Details task, where the system assumes that the project already has full permissions from all necessary agencies and participating organizations prior to making the project public. Figure 156 includes entering loan details where the lender may choose to enter only information for legal and business reasons. If no loan exists for this project, enter no information.

图157包括评审建议的支取时间表单任务,其中,系统能通过在估计的工程时间表上,按同等间隔支取数来生成建议的支取时间表。图157包括接收或拒绝建议的支取时间表单任务,其中,GC能根据由业主、业主代表、贷方或GC建立的计划,人工地宣布支取。能拒绝自动计划并可手动地维护计划。Figure 157 includes the Review Proposed Drawout Schedule task, where the system can generate a proposed drawdown schedule by drawing numbers at equal intervals on the estimated project schedule. Figure 157 includes the Accept or Reject Proposed Withdrawal Schedule Task, where the GC can manually announce a drawdown according to a schedule established by the owner, owner's representative, lender, or GC. Ability to reject automatic schedules and maintain schedules manually.

图159包括用于参与组织的输入工程预算,其中,能使用分层过程。在每一级,参与组织能执行他们用来支持他们的组织的过程。Figure 159 includes input engineering budgets for participating organizations, where a tiered process can be used. At each level, participating organizations can implement the processes they use to support their organization.

图160包括授权更改订单任务,其中,问题解决(issue resolution)过程可以要求拒绝初始更改订单和创建所有方相互认可的第二更改订单。只有问题解决过程中的最终更改订单才必须核准。Diagram 160 includes authorizing a change order task, where an issue resolution process may require rejecting an initial change order and creating a second change order mutually acceptable to all parties. Only final change orders in the problem resolution process must be approved.

图162包括添加组织任务,在参与工程前,必须添加组织。系统、产权保险公司、贷方或GC能将组织添加到系统。尽管在识别和分配维护工程支付诸过程的工程角色任务期间能添加组织,但可以通该过程相独立地添加组织。图162包括输入组织明细任务,其中,组织的初始联系人能负责输入他们的组织的明细和另外的联系人信息。每一组织能识别可负责更新他们的组织明细和联系人信息的内部系统管理员。图162包括维护组织明细任务,其中,由于敏感的金融信息,安全性会特别严格。Figure 162 includes the task of adding an organization. Before participating in a project, an organization must be added. Organizations can be added to the system by the system, title insurance companies, lenders or GCs. Although organizations can be added during the Identify and Assign Engineering Role Task for the Maintain Engineering Payments processes, organizations can be added independently through this process. Figure 162 includes the Enter Organization Details task, where an organization's initial contact can be responsible for entering their organization's details and additional contact information. Each organization can identify an internal system administrator who can be responsible for updating their organization details and contact information. Figure 162 includes maintenance organization detail tasks where security can be particularly stringent due to sensitive financial information.

图164包括基于参与方的需求,能由第三方提供的核查组织任务。系统能便于验证组织和收取服务费。Figure 164 includes verification organizational tasks that can be provided by third parties based on the needs of the participating parties. The system facilitates verification of organizations and collection of service fees.

图166包括能由GC执行的宣布支取任务。该支取是工程参与方能提交发票、业主(通常通过GC)能支付已完成的工作以及参与方接收付款并释放它们的相关留置权放弃的机制。图166包括生成誓词任务,其中,GC能在线评审提交(当需要时,参考备份纸张文件),并且只要提交正确,系统能根据已经由参与支取的对方电子提交的信息来生成誓词。GC能拒绝提交以及能修订它们并准许重新提交。该机制能用来解决与发票有关的任何问题。图166包括通常能由贷方或产权保险公司执行的请求检查任务。图166包括通常能由贷方执行的授权支取任务,但可以要求包含业主、业主的代表,或另一指定的工程参与方。可配置授权机制能将任何工程参与方包括在授权过程中。图166包括能要求完成支取的输入和分级留置权放弃。不将资金传送到开发票方,直到输入并分级它们的留置权放弃为止。该要求确保支付和留置权放弃释放基本上在同时执行。图166包括执行同时支付/留置权放弃释放任务,其中,用于支付的留置权放弃的基本上同时的交换是自动的。该自动化交换能消除会议的需求并能消除支付和留置权放弃释放的延时。该自动交换能通过消除支付过程中的中间组织,降低留置权放弃的丢失的机会,并能加速对所有支取参与方的付款。Figure 166 includes declare drawdown tasks that can be performed by the GC. The draw is the mechanism by which project participants can submit invoices, the owner (usually through the GC) can pay for work done, and the participants receive payment and release their associated lien waivers. Figure 166 includes the Generate Affidavit task, where the GC can review submissions online (referring to backup paper files when needed), and as long as the submission is correct, the system can generate an affidavit based on the information that has been electronically submitted by the counterparty participating in the withdrawal. The GC can reject commits as well as revise them and grant resubmissions. This mechanism can be used to resolve any issues related to invoices. Figure 166 includes request review tasks that can typically be performed by a lender or title insurance company. Figure 166 includes authorized drawdown tasks that can normally be performed by the lender, but may require the inclusion of the owner, the owner's representative, or another designated project participant. A configurable authorization mechanism can include any project participant in the authorization process. Figure 166 includes inputs and graded lien waivers that can require a drawdown to be completed. Funds are not transferred to the invoicing party until their lien waiver is entered and graded. This requirement ensures that payment and lien release are performed substantially simultaneously. Figure 166 includes performing a Simultaneous Payment/Lien Waiver Release task, wherein the substantially simultaneous exchange of a lien waiver for payment is automatic. This automated exchange can eliminate the need for meetings and can eliminate delays in payment and lien release. This automatic exchange can reduce the chance of loss of lien waivers by eliminating intermediaries in the payment process and can speed up payment to all drawing participants.

图167包括能将电子消息基本上同时发送到所有参与的和/或有关组织的公告支取任务。Fig. 167 includes posting withdrawal tasks that can send electronic messages to all participating and/or related organizations substantially simultaneously.

图168包括能由希望通过支取过程支付的任何方执行的输入发票细目。电子提交跟随在支持提交的文书工作之后。能提供允许各方经扫描来提交支持信息的服务。Figure 168 includes input invoice details that can be performed by any party wishing to pay through the withdrawal process. Electronic filing follows the paperwork supporting the submission. A service can be provided that allows parties to submit supporting information via scanning.

图169包括授权发票任务,其中,疑难解决过程可以要求拒绝初始发票以及创建所有各方相互认可的第二发票。仅核准该解决过程中的最终发票。Figure 169 includes the Authorize Invoice task, where a troubleshooting process may require rejection of the initial invoice and creation of a second invoice that is mutually acceptable to all parties. Only final invoices in the resolution process are approved.

图170包括可以有与工程有关的一个以上监理的选择监理任务。在这种情况下,必须选择适当的监理来执行检查。Diagram 170 includes select supervision tasks that may have more than one supervision related to the project. In such cases, an appropriate supervisor must be selected to carry out the inspection.

图171包括检查任务的确认范围,其中,请求检查的组织能定义检查的范围,用于整个誓词或誓词子集。图171包括输入检查结果任务,其中,视检查的范围和属性而定,支持文档可能是必要的。图171包括转发支持文档任务,其中,系统能允许将与数字照片或其他电子材料有关的文件附加到电子检查报告。Figure 171 includes the scope of validation for inspection tasks, where the organization requesting the inspection can define the scope of the inspection, for the entire affidavit or a subset of the affidavit. Figure 171 includes the Enter Inspection Results task, where supporting documentation may be necessary depending on the scope and nature of the inspection. Figure 171 includes Forwarding Supporting Documentation tasks, wherein the system can allow documents related to digital photographs or other electronic materials to be attached to the electronic inspection report.

图173包括分级(stage)留置权放弃任务,其中,能在系统中分级电子签名的留置权放弃,防止任何更改。在本发明的一个实施例中,不将留置权放弃释放给产权保险公司,直到支付和留置权放弃的基本上同时交换。Figure 173 includes the Stage Lien Release task, where an electronically signed lien release can be staged in the system, preventing any alteration. In one embodiment of the invention, the lien release is not released to the title insurer until substantially simultaneous exchange of payment and lien release.

图174包括确认支取授权和分级留置权放弃任务,这可包含所有留置权放弃的评审以确保它们完整和正确。Figure 174 includes the Confirm Drawdown Authorization and Graded Lien Waiver tasks, which may include a review of all lien waivers to ensure they are complete and correct.

图178包括提供客户支持任务,这可包括支持添加或修改组织或工程、修复密码问题、修复工程和交易。图178包括系统管理任务,这可包括安全管理、金融审计和偶然性支持。图178包括用于系统参与方任务的维护活动性历史,能包括厂商历史,具有有关厂商和/或厂商的等级的历史。Figure 178 includes providing customer support tasks, which may include support for adding or modifying organizations or projects, fixing password issues, fixing projects and transactions. Figure 178 includes system management tasks, which may include security management, financial auditing, and contingency support. Map 178 includes maintenance activity history for system participant tasks, can include vendor history, has history pertaining to vendor and/or vendor's level.

本领域的普通技术人员能够理解,可使用各种计算机设备,诸如个人计算机、服务器和具有处理器或能够执行程序或指令集的其他设备来实现本发明的实施例。通常,使用现有的硬件或本领域的普通技术人员易于创建的硬件来实现本发明。因此,并不总是详细地说明示例性设备的体系结构,只是提及该设备通常将具有处理器、存储器(一些类型)、以及输入和输出应用。处理器能是微型处理器、可编程逻辑控制、应用专用集成电路,或配置成提取和执行指令的计算设备。在某些情况下,设备也能具有操作系统和由操作系统管理的应用程序。还应当注意到尽管所示的控制系统40和80连接在网络中,但不隐含具体的网络结构。如本领域的普通技术人员能想到的,能在各种组合中使用一个或多个网络或通信系统,诸如互联网、电话系统、无线网络、卫星网络、电缆TV网络和各种其他专用和公用网络以便提供创建本发明的实施例或实现所要求或所需的通信链路。因此,本发明不限于任何具体的网络或网络组合。Those of ordinary skill in the art can understand that various computer devices, such as personal computers, servers, and other devices with processors or capable of executing programs or sets of instructions, can be used to implement the embodiments of the present invention. In general, the invention is implemented using existing hardware or hardware that can be easily created by one of ordinary skill in the art. Thus, the architecture of an exemplary device is not always described in detail, just to mention that the device will generally have a processor, memory (of some type), and input and output applications. A processor can be a microprocessor, programmable logic control, application specific integrated circuit, or computing device configured to fetch and execute instructions. In some cases, a device can also have an operating system and applications managed by the operating system. It should also be noted that although control systems 40 and 80 are shown connected in a network, no specific network configuration is implied. One or more networks or communication systems can be used in various combinations, such as the Internet, telephone systems, wireless networks, satellite networks, cable TV networks, and various other private and public networks, as will occur to those of ordinary skill in the art In order to provide the communication links required or needed to create an embodiment of the invention or to implement it. Thus, the invention is not limited to any particular network or combination of networks.

在权利要求书中阐述本发明的各个特征和优点。Various features and advantages of the invention are set forth in the claims.

Claims (103)

1. method of managing the construction payment process, this method comprises action:
Reception is used for the log-on message of participant;
Store this log-on message; And
By visiting this log-on message, the geld relevant with construction work transferred to this participant.
2. the method for claim 1, comprise that further action receives the log-on message that is used for participant, this participant comprises at least one of owner, owner's representative, title insurance company, credit side, architect, indoor design person, management, general contractor, subcontractor and material supplier.
3. the method for claim 1 comprises that further action receives the log-on message that is used at least one user of being associated with described participant.
4. the method for claim 1 further comprises first user that registration is associated with this participant and the action that this first user is considered as the keeper of this participant.
5. method as claimed in claim 4 further comprises second user's that registration is associated with this participant action.
6. the method for claim 1 comprises that further this participant provides the action of log-on message.
7. the method for claim 1 further comprises the action of verifying this participant.
8. the method for claim 1 comprises that further transmission registered the action of the notice of this participant.
9. the method for claim 1 further comprises being stored in the database server log-on message and the action of visiting this log-on message by data base management system (DBMS).
10. the method for claim 1 further comprises by visiting this log-on message handle a plurality of gelds relevant with a plurality of engineerings and transferring to the action of this participant.
11. the method for claim 1 further comprises generating automatic payment instruction and using system of automatic settlement center, remittance system, debit card system and access one that geld is transferred to the action of this participant.
12. a construction payment management system comprises:
Application server, storage organization module and data base management system (DBMS), this molded tissue block receives the log-on message of organizing that is used for participant; And
Be connected to the database server of this data base management system (DBMS), this tissue log-on message of this database server stores, this data base management system (DBMS) is visited this tissue log-on message so that the geld relevant with construction work transferred to this participant.
13. construction payment management system as claimed in claim 12, wherein, first participant is organized log-on message for second participant provides.
14. construction payment management system as claimed in claim 12, wherein, this participant comprises at least one of representative, title insurance company, credit side, architect, indoor design person, management, general contractor, subcontractor and material supplier of owner, owner.
15. construction payment management system as claimed in claim 12, wherein, this application server for storage line module, this line module receives the user's registration information that is used at least one user relevant with this participant, and this user's registration information of this database server stores.
16. construction payment management system as claimed in claim 15, wherein, the keeper that this line module receives user's registration information and this first user is considered as being used for this participant from first user relevant with this participant.
17. construction payment management system as claimed in claim 16, wherein, this line module receives user's registration information from second user relevant with this participant.
18. construction payment management system as claimed in claim 12, wherein, this participant provides this log-on message.
19. construction payment management system as claimed in claim 12 further comprises the service for checking credentials that links to each other with this application server, this participant is verified in this service for checking credentials.
20. construction payment management system as claimed in claim 12 further is included in the notification manager of storing in this application server, this notification manager transmits the notice of having registered this participant.
21. construction payment management system as claimed in claim 12 further comprises the database server that is connected to this application server, this database server stores is organized log-on message, and this data base management system (DBMS) is from this database server visit log-on message.
22. construction payment management system as claimed in claim 12, wherein, this data base management system (DBMS) is visited this tissue log-on message so that a plurality of gelds relevant with a plurality of engineerings are transferred to this participant.
23. construction payment management system as claimed in claim 12, further comprise the payment system that links to each other with this application server, and in this application server, store draw module, this is drawn module automatic payment instruction is sent to this payment system, and this payment system comprises system of automatic settlement center, remittance system, debit card system and access one.
24. a method of managing the construction payment process, this method comprises action:
Communicate by letter with a plurality of participants foundation in the construction work;
Notice is drawn in generation; And
Should notify and be transmitted electronically to a plurality of participants in real time.
25. method as claimed in claim 24, further comprise and a plurality of participants, comprise that general contractor, subcontractor, credit side, title insurance company, owner, owner's representative, management, architect, indoor design person and material supplier at least two set up the action of communicating by letter.
26. method as claimed in claim 24 further comprises the action of creating and safeguarding the timetable of drawing that is used for construction work.
27. method as claimed in claim 24, further comprise generate a plurality of participants be used for receiving the geld of drawing each AutoInvoice and the action that transmits the notice that relevant AutoInvoice permits.
28. method as claimed in claim 24 comprises that further each the automatic lien that generates a plurality of participants be used for receiving the geld of drawing abandons and transmit the relevant action of carrying out the notice that automatic lien abandons.
29. method as claimed in claim 24 further comprises the automatic oath of generation, transmits the notice about execution this oath, the allowance of drawing and payment funding, and the action that generates automatic payment instruction.
30. a construction payment management system comprises:
Application server, storage notification manager and draw module, this notification manager and draw module and generate and draw notice, this notification manager was sent to a plurality of participants with should notifying real-time electronic.
31. construction payment management system as claimed in claim 30, wherein, a plurality of participants comprise at least one of general contractor, subcontractor, credit side, title insurance company, owner, owner's representative, management, architect, indoor design person and material supplier.
32. construction payment management system as claimed in claim 30, wherein, this is drawn module and safeguards the timetable of drawing that is used for this construction work.
33. construction payment management system as claimed in claim 30, wherein, this draws each the AutoInvoice that module generates a plurality of participants be used for receiving the geld of drawing, and this notification manager transmits the notice that relevant AutoInvoice is permitted.
34. construction payment management system as claimed in claim 30, wherein, this is drawn each the automatic lien that module generates a plurality of participants be used for receiving the geld of drawing and abandons, and this notification manager transmits the relevant notice that automatic lien is abandoned of carrying out.
35. construction payment management system as claimed in claim 30, wherein, this is drawn module and generates automatic oath and automatic payment instruction, and this notification manager transmits about carrying out the notice of this oath, the allowance of drawing and payment funding.
36. construction payment management system as claimed in claim 30, further comprise the database server that is connected to this application server, this database server stores is organized log-on message, and this notification manager is visited this tissue log-on message so that notice is sent to a plurality of participants.
37. a method of managing the construction payment process, this method comprises action:
Generation is used for the budget of construction work; And
Based on this budget, generate at least one AutoInvoice, automatic oath and at least one automatic lien and abandon.
38. method as claimed in claim 37 comprises that further action is used to generate the budgets that comprise a plurality of expenditure, and generates at least one the AutoInvoice that comprises this a plurality of expenditures.
39. method as claimed in claim 37 comprises that further action is used to generate at least one budget of hard cost under soft cost on the line that comprises the general contractor and general contractor's the line.
40. method as claimed in claim 37 further comprises the action of the notice of the allowance that transmits relevant AutoInvoice.
41. method as claimed in claim 37 further comprises and guarantees that this automatic oath and at least one automatic lien abandon the action in this at least one AutoInvoice.
42. method as claimed in claim 37 comprises that further the summation of guaranteeing invoice amount equals the action of the oath amount of money.
43. method as claimed in claim 37 further comprises and guarantees that invoice amount equals the action that lien is abandoned the amount of money.
44. method as claimed in claim 37 further comprises at least one according to participant demand and state legal requirement, customizes at least one AutoInvoice, automatically at least one the action abandoned of oath and at least one lien.
45. method as claimed in claim 37 further comprises and carries out the action that at least one AutoInvoice, automatic oath and at least one automatic lien are abandoned electronically.
46. method as claimed in claim 37 further comprises at least one AutoInvoice of generation, permits at least one AutoInvoice, generates automatic oath subsequently, permits this automatic oath and generate the action that at least one lien is abandoned subsequently.
47. method as claimed in claim 37 further comprises the action of the electronic copy that invoice, oath and lien that store electrons is carried out are abandoned.
48. method as claimed in claim 37 further comprises the action that generates the hard copy that invoice, oath or lien that electronics carries out abandon.
49. a method of managing the construction payment process, this method comprises action:
Receive at least one invoice from least one subcontractor; And
Automatically generate general contractor's oath, comprise the amount of money from each of at least one invoice.
50. method as claimed in claim 49 further comprises the action of carrying out at least one invoice and oath electronically.
51. a construction payment management system comprises:
Application server, storage budget module and draw module, this budget module generates the budget that is used for construction work, this draw module based on this budget generate at least one AutoInvoice, oath and at least one automatic lien are abandoned automatically.
52. construction payment management system as claimed in claim 51, wherein, this budget module generates the budgets that comprise a plurality of expenditures, and this is drawn module and generates at least one the AutoInvoice that comprises this a plurality of expenditures.
53. construction payment management system as claimed in claim 51, wherein, this budget module generates at least one budget of hard cost under soft cost on the line that comprises the general contractor and general contractor's the line.
54. construction payment management system as claimed in claim 51 further is included in the notification manager of storing in this application server, this notification manager transmits the notice of the allowance of relevant AutoInvoice.
55. construction payment management system as claimed in claim 51, wherein, this is drawn module and guarantees that this automatic oath and at least one automatic lien abandon in this at least one AutoInvoice.
56. construction payment management system as claimed in claim 51, wherein, this is drawn module and guarantees that the summation of invoice amount equals the oath amount of money.
57. construction payment management system as claimed in claim 51, wherein, this is drawn module and guarantees that invoice amount equals lien and abandons the amount of money.
58. construction payment management system as claimed in claim 51, wherein, this draws module according at least one of participant demand and state legal requirement, customize at least one AutoInvoice, automatically oath and at least one lien abandon at least one.
59. construction payment management system as claimed in claim 51, wherein, this is drawn module and generates at least one AutoInvoice, guarantee to permit this at least one AutoInvoice, generate this automatic oath subsequently, guarantee this automatic oath of allowance, and generate at least one lien subsequently and abandon.
60. construction payment management system as claimed in claim 51, further be included in data base management system (DBMS) of storing in this application server and the database server that is connected to this application server, the electronic copy that invoice, oath and the lien that this database server stores electronics is carried out abandoned.
61. construction payment management system as claimed in claim 51, wherein, the hard copy that this invoice, oath or lien of drawing the execution of module generation electronics is abandoned.
62. construction payment management system as claimed in claim 51, wherein, this is drawn, and module is used for carrying out electronically at least one AutoInvoice, automatically oath and at least one automatic lien are abandoned.
63. a method of managing the construction payment process, this method comprises action:
Abandon from the participant reception lien of construction work;
Storing this lien abandons;
Instruction to this participant payment is sent to payment system; And
Receive this participant from this payment system and received that the affirmation of fund also discharges this lien basically simultaneously and abandons.
64., further comprise one the action that generates automatic payment instruction and will this automatic payment instruction be sent to system of automatic settlement center, remittance system, debit card system and access as the described method of claim 63.
65. as the described method of claim 63, further comprise from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each up to receive all a plurality of liens abandon till and when receiving that all a plurality of liens are abandoned, transmit action to the instruction of a plurality of participants payments.
66. as the described method of claim 63, further comprise from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each and when receiving each that a plurality of liens abandon, transmit action to the instruction of each payment of a plurality of participants.
67. as the described method of claim 63, further comprise action from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each, when receiving each that a plurality of liens abandon, transmit to first instruction of each payment of a plurality of participants and when receive that all a plurality of liens are abandoned, transmit to second of at least one other participants payment of a plurality of participants and instruct.
68. as the described method of claim 63, further comprise, receive and discharge the action that lien is abandoned according to drawing performed work to current.
69., further comprise according to work the action that reception and release lien are abandoned to drawing performed this month this month as the described method of claim 63.
70., further comprise at least one the action of carrying out electronically that a plurality of liens abandon as the described method of claim 63.
71. a method of managing the construction payment process, this method comprises action:
Abandon from the participant reception lien of construction work; And
Instruction to the payment of this participant is sent to payment system, and discharges this lien basically simultaneously and abandon.
72., further comprise one the action that generates automatic payment instruction and will this automatic payment instruction be sent to system of automatic settlement center, remittance system, debit card system and access as the described method of claim 71.
73. as the described method of claim 71, further comprise action be used for from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each up to receive all a plurality of liens abandon till and when receive that all a plurality of liens are abandoned, transmit the instruction of paying the bill to a plurality of participants.
74. as the described method of claim 71, further comprise from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each and when receiving each that a plurality of liens abandon, transmit action to the instruction of each payment of a plurality of participants.
75. as the described method of claim 71, further comprise from a plurality of participants receive a plurality of liens abandon, store a plurality of liens abandon each, when receiving each that a plurality of liens abandon, transmit to first instruction of each payment of a plurality of participants and when receive that all a plurality of liens are abandoned, transmit second action of instructing at least one other participants payment of a plurality of participants.
76. as the described method of claim 71, further comprise, receive and discharge the action that lien is abandoned according to drawing performed work to current.
77., further comprise according to work the action that reception and release lien are abandoned to drawing performed this month this month as the described method of claim 71.
78., further comprise and carry out the action that lien is abandoned electronically as the described method of claim 71.
79. a construction payment management system comprises:
Application server, store electrons safe deposit box and draw module, this electronics safe deposit box is abandoned from the participant reception and the storage lien of construction work, this is drawn module and generates to the automatic command of this participant payment and send it to payment system, and this is drawn module and receives this participant from this payment system and received the affirmation of fund and discharged this lien basically simultaneously and abandon.
80. as the described construction work management system of claim 79, further comprise notification manager, automatic command be sent to system of automatic settlement center, remittance system, debit card system and access one.
81. as the described construction work management system of claim 79, wherein, this electronics safe deposit box receives a plurality of liens from a plurality of participants and abandons, each of storing that a plurality of liens abandon and comprises that further notification manager transmits the automatic command to a plurality of participants payments when receiving that all a plurality of liens are abandoned till receiving that all a plurality of liens are abandoned.
82. as the described construction work management system of claim 79, wherein, this electronics safe deposit box receives a plurality of liens from a plurality of participants and abandons and store each that a plurality of liens are abandoned, and further comprise notification manager, be used for when receiving each that a plurality of liens abandon, transmitting automatic command to each payment of a plurality of participants.
83. as the described construction work management system of claim 79, wherein, this electronics safe deposit box receives a plurality of liens from a plurality of participants and abandons and store each that a plurality of liens are abandoned, and further comprise notification manager, be used for when receiving at least one that a plurality of liens abandon, transmitting first instruction, and when receive that all a plurality of liens are abandoned, transmit to second of at least one other participants payment of a plurality of participants and instruct at least one payment of a plurality of participants.
84. as the described construction work management system of claim 79, wherein, this electronics safe deposit box and this are drawn module according to drawing performed work to current, receive and discharge lien and abandon.
85. as the described construction work management system of claim 79, wherein, this electronics safe deposit box and this are drawn module according to drawing performed work in this month this month, receive and discharge lien and abandon.
86., further comprise and carry out the electronic signature service that lien is abandoned electronically as the described construction work management system of claim 79.
87. a method of managing the construction payment process, this method comprises action:
Establishment is used for the main budget of construction work, comprises from least one at least one subsidiary budget in general contractor, at least one subcontractor and at least one material supplier, and this at least one subsidiary budget comprises at least one expenditure respectively; And
Before management is drawn, receive this main budget and comprise at least one the expenditure at least one subsidiary budget.
88. as the described method of claim 87, further comprise action, this action is created at least one that AutoInvoice, automatic oath and automatic lien are abandoned based on main budget, at least one subsidiary budget and at least one expenditure item.
89., further comprise and carry out the action that AutoInvoice, automatic oath and automatic lien are abandoned electronically as the described method of claim 88.
90., further comprise and create at least one the action of main budget comprise hard cost and soft cost as the described method of claim 87.
91., further comprise creating comprising the only action of at least one subsidiary budget of hard cost as the described method of claim 87.
92. a construction payment management software comprises:
The engineering module is used for creating and management engineering;
The budget module is used to create and safeguard the budget that is used for this project; And
Draw module, be used for, create, plan and manage to be used for drawing of this project based on this budget.
93. as the described construction payment management software of claim 92, further comprise molded tissue block, be used for creating information with the participant of safeguarding relevant this project.
94. as the described construction payment management software of claim 92, further comprise the change order module, be used to revise budget and permit revising budget.
95., further comprise electronics lien waiver of premium bobbin carriage as the described construction payment management software of claim 92, be used for from the participant of drawing, receive and store lien and abandon.
96., further comprise the system environments manager as the described construction payment management software of claim 92, be used for configuration access, administrative messag, establishment report, technical support is provided, and the interface of management and other softwares.
97. as the described construction payment management software of claim 92, further comprise line module, be used to create the user relevant with participant with renewal.
98. as the described construction payment management software of claim 92, further comprise the budget module, be used to customize at least one that invoice code, coding of account, Stage code and Stage code are described.
99., further comprise notification manager, be used for creating, edit notice and be sent to participant as the described construction payment management software of claim 92.
100. a graphic user interface that is used for construction payment management system, this graphic user interface comprises:
At least one of works schedule progress bar, payment funding progress bar and number percent schedule bar;
The works schedule progress bar is represented the progress with respect to calendar date;
The payment funding progress bar is represented the progress with respect to budget amount; And
Number percent schedule bar is represented the progress with respect to the number percent of the work of finishing on construction work.
101., further be included as the engineering homepage of participant customization as the described graphic user interface of claim 100.
102. as the described graphic user interface of claim 100, wherein, this project homepage comprises each of works schedule progress bar, payment funding progress bar and number percent schedule bar.
103., further comprise new information indicator, relevant at least one of the information of drawing and the relevant unsettled information of drawing that is used for this participant finished as the described graphic user interface of claim 100.
CN 200580022122 2004-06-29 2005-01-10 Construction payment management system and method Pending CN101044477A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US58378204P 2004-06-29 2004-06-29
US60/583,782 2004-06-29
US11/032,699 2005-01-10

Publications (1)

Publication Number Publication Date
CN101044477A true CN101044477A (en) 2007-09-26

Family

ID=38808981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200580022122 Pending CN101044477A (en) 2004-06-29 2005-01-10 Construction payment management system and method

Country Status (2)

Country Link
CN (1) CN101044477A (en)
ZA (1) ZA200610814B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103782613A (en) * 2011-03-30 2014-05-07 摩托罗拉解决方案公司 Multi-group communications and related devices
CN103745362B (en) * 2013-12-31 2017-10-20 太原理工大学 The method and system that construction project credit system is automatically generated
CN108280739A (en) * 2018-01-02 2018-07-13 深圳市盘古之手科技有限公司 A kind of order processing method and apparatus
CN109716371A (en) * 2016-09-29 2019-05-03 万事达卡国际股份有限公司 System and method for routing the ACH initiated in the ACH Payment System that supplier defines payment

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2007000352A (en) 2004-06-29 2007-11-09 Textura Corp Construction payment management system and method.

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103782613A (en) * 2011-03-30 2014-05-07 摩托罗拉解决方案公司 Multi-group communications and related devices
CN103745362B (en) * 2013-12-31 2017-10-20 太原理工大学 The method and system that construction project credit system is automatically generated
CN109716371A (en) * 2016-09-29 2019-05-03 万事达卡国际股份有限公司 System and method for routing the ACH initiated in the ACH Payment System that supplier defines payment
CN109716371B (en) * 2016-09-29 2023-06-23 万事达卡国际股份有限公司 System and method for routing ACH payments initiated within vendor-defined ACH payment systems
CN108280739A (en) * 2018-01-02 2018-07-13 深圳市盘古之手科技有限公司 A kind of order processing method and apparatus

Also Published As

Publication number Publication date
ZA200610814B (en) 2009-06-24

Similar Documents

Publication Publication Date Title
US10621566B2 (en) Construction payment management system and method with automatic notification workflow features
US9727871B2 (en) Construction payment management system and method with lien waiver exchange features
CN1542665A (en) Computerized dispute resolution system and method
CN1322325A (en) Communiation of credit filtered prices in electronic brokerage system
CN1750036A (en) System and method for mnaging, exchanging and purchasing medium of electronic bill and electronic check
CN101044477A (en) Construction payment management system and method
CN101042759A (en) Construction payment management system and method with document tracking feature
HK1107418A (en) Construction payment management system and method
AU2014256334A1 (en) Construction Payment Management System and Method
AU2016213720A1 (en) Construction Payment Management System and Method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1107418

Country of ref document: HK

ASS Succession or assignment of patent right

Owner name: TURK STURA COMPANY

Free format text: FORMER OWNER: TURK STURA CO., LTD.

Effective date: 20080321

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080321

Address after: Delaware

Applicant after: Textura Corp.

Address before: Illinois State

Applicant before: Textura LLC

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20070926

REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1107418

Country of ref document: HK