Kuwait University
Computer Engineering
The multimedia data objects scheduling problem for WWW applications is modeled using the twomachine #owshop problem of minimizing maximum lateness with separate setup times. We establish three dominance relations, and propose four... more
In this paper, we address the two-stage assembly flowshop scheduling problem with a weighted sum of makespan and mean completion time criteria, known as bicriteria. Since the problem is NP-hard, we propose heuristics to solve the problem.... more
In this paper, we address the three-machine flowshop scheduling problem. Setup times are considered separate from processing times, and the objective is to minimize total completion time. We show that the three-site distributed database... more
An optimal self-stabilizing algroithm is presented that ®nds the strongly connected components of a directed graph on an underlying network after OC rounds, where C is the length of the longest cycle in the graph. Because the algorithm is... more
We address the problem of a finite horizon single item maintenance optimization structured as a combination of preventive and corrective maintenance in a nuclear power plant environment. We present Bayesian semiparametric models to... more
In this paper we address the two-stage assembly flowshop scheduling problem with respect to the makespan criterion where setup times are considered as separate from processing times. We formulate the problem and obtain a dominance... more
The problem of scheduling a set of jobs with unit operation times in a job shop to minimize total completion time is addressed. It is shown that this problem can be modeled as finding the optimal coloring of a special mixed graph.... more
The user has requested enhancement of the downloaded file. All in-text references underlined in blue are added to the original document and are linked to publications on ResearchGate, letting you access and read them immediately. This... more
We address the three-machine flowshop scheduling problem to minimise maximum lateness, where setup times are considered separate from processing times. We establish a dominance relation for the problem where it specifies which of the two... more
The user has requested enhancement of the downloaded file. All in-text references underlined in blue are added to the original document and are linked to publications on ResearchGate, letting you access and read them immediately. This... more
This paper presents a stochastic model to evaluate the reliability and availability of a network service configuration consisting of a centralized database server and two distributed database server sets for a local/metropolitan area... more
The two-machine flowshop problem of minimizing maximum lateness with separate setup times is used to model minimizing lateness of multimedia data object requests in Internet applications. We propose using a new genetic based algorithm... more
Abstract⎯The two-stage flowshop scheduling problem with separate setup times to minimize maximum lateness is addressed in this paper. It is well known that this problem is strongly NP-hard and that there exists at least one optimal... more
This paper presents two grammars for reading numbers of classical and modern Arabic language. The grammars make use of the structured Arabic counting system to present an accurate and compact grammar that can be easily implemented in... more
The research literature provides strong evidence that characteristics of buildings and their indoor environments influence the prevalence of several adverse health effects. Kuwait is considered one of the countries with harshest weather... more
The research literature provides strong evidence that characteristics of buildings and their indoor environments influence the prevalence of several adverse health effects. Kuwait is considered one of the countries with harshest weather... more