Academia.edu no longer supports Internet Explorer.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to upgrade your browser.
Figure 8 Comparison of measurement and simulation for transition overvoltages upon energizing from nearby substation: (a) Results for the substation; (b) Results for the two transition points. 5.8%, Figure 8a) is only slightly larger as compared to the width for the two transition points (6.0%, igure 8b). On one hand, this shows that the modelling method is adequate and predicts observations vell. On the other hand, it does not represent the difference in measurement accuracy expected from oth locations. Apparently, the simulations also contribute to deviations. This is not surprising as, Ithough the complete Dutch EHV grid was simulated in large detail, a number of simplifications vere made. Connections to downstream networks (110, 150, 220 kV) were replaced by equivalent mpedances based on active and reactive power consumption by the loads according to powerflow alculations [7]. Moreover, connections abroad were not modelled in detail.
Discover breakthrough research and expand your academic network
Join for free