Table 4 RII Ranking of Technological Factors. This result agrees with the findings of Hinze, who argue that the delays and costs associated with Rework in construction have profound impact on productivity [12]. nspection delay by the engineer is ranked the sixth. This constraint is very significant in terms of its influence on the abor productivity of Libya. Moreover, factor inspection by the engineer is ranked the sixth within a group with RII of 75.3%. The thirteenth of the overall ranks of productivity factors surveyed. However, Quality of drawings and Frequent change to orders during execution are ranked the seventh and eighth within the group with RI of 67.2% and 62.8%, factors. Sixteenth and nineteenth in terms of the overall elements, respectively.