Fig. 8 shows the frequency of some busbars in Khorasan network for the disturbance of tie line outage in the case of using conventional UFLS. The amount of power transfer between areas before the tie line outage is 1100 MW. In this case, although all four steps of conventional UFLS scheme operate and 510 MW load is shed, the system does not remain stable and frequency does not recover.

Figure 8 shows the frequency of some busbars in Khorasan network for the disturbance of tie line outage in the case of using conventional UFLS. The amount of power transfer between areas before the tie line outage is 1100 MW. In this case, although all four steps of conventional UFLS scheme operate and 510 MW load is shed, the system does not remain stable and frequency does not recover.