580 California St., Suite 400
San Francisco, CA, 94104
Academia.edu no longer supports Internet Explorer.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to upgrade your browser.
Figure 8 During part load operation, the power output is reduced by closing VIGVs from 100% load to the required load. In this way the VIGV schedule can change the operating point on the compressor performance map. The compressor perfor- mance maps shown in the Figs. 6 and 7 represent a shift in operating parameters including the compressor mass flow, pressure ratio, and isentropic efficiency. These parameters
Discover breakthrough research and expand your academic network
Join for free