The analysis performed in the SEEP/W program was applied to the design with a horizontal drainage length of 45 meters [29]. As in the Rocscience Slide analysis, the seepage analysis was performed, while the maximum water was assumed to be 27 m above the foundation level. The pore water pressure distribution in the downstream region of the dam was obtained (Figure 9) through the seepage analysis.

Figure 9 The analysis performed in the SEEP/W program was applied to the design with a horizontal drainage length of 45 meters [29]. As in the Rocscience Slide analysis, the seepage analysis was performed, while the maximum water was assumed to be 27 m above the foundation level. The pore water pressure distribution in the downstream region of the dam was obtained (Figure 9) through the seepage analysis.