Figure 3 Scope of the wireless network requirements The scope of this document is shown in Fig. 3.
Related Figures (3)
Fig.1 presents an overview of the scope of the PID. The creation of an EDP overall IEC 60870-5-104 PID has considered two versions: Fig.2: Future requirements for HV/MV Substations and MV stations Light PID In October we conducted a pre-trial successfully, in a SIRESP test facilities, with 2 RTU (EFACEC URR).