Figure 3 Reservoir Grid and Well Positioning for Case Il 2.3.3 Case Ill: Horizontal Wells Here two horizontal wells Gi (production) and G2 (Injection) placed parallel to each other were considered (Figure 4). All other rock and fluid modeling parameters assume their previous values. Well G; is specified with a bottom hole pressure to estimate the oil and water production rates, while G2 is specified with a water injection rate to estimate the variation in the bottom hole pressure. From Figure 4, the production and injection wells were placed and perforated at the first two layers.