Ares V: Application to solar system scientific exploration
2010, Acta Astronautica
Abstract
The development of the Ares V launch vehicle will provide levels of performance unseen since the days of Apollo. This capability, like the Saturn V before it, is being developed primarily for crewed lunar missions. However, the tremendous jump in performance offered by the Ares V launch system has tremendous potential for the furtherance of robotic solar system exploration missions as well. Preliminary performance assessments indicate that Ares V could deliver 5 times the payload to Mars as compared to the most capable US expendable launch vehicle available today. Beyond Mars, the outer planets offer a number of high-priority investigations with compelling science. Presently, missions to these destinations are only achievable using indirect flights with gravity assist trajectories and, in many cases, suffer from long flight times. An Ares V with an upper stage could capture these missions using direct flights with shorter interplanetary transfer times that would enable extensive in situ investigations and possibly the return of samples to Earth. This paper lays out an estimate of Ares V performance for moderate and high C3 missions, and goes on to discuss a range of revolutionary mission concepts that could be enabled by this significant increase in launch capability.
References (14)
- NRC, New Frontiers in the Solar System, an integrated exploration strategy, Technical report, Space Studies Board, National Research Council, Washington, D.C. (2003).
- NASA -SSE Roadmap Team, Solar System Exploration -Solar System Exploration Roadmap for NASA's Science Mission Directorate, Report: JPL-D-35618 (cleared for external release), NASA Science Missions Directorate, Planetary Science Divi- sion, Washington, D.C. (2006).
- Thronson, H.A., Launch Vehicle Ac- commodation Assessment: Capabili- ties of Ares V to Enable Future Ma- jor Astronomy Missions, Submitted to the NASA Headquarters Explora- tion Systems Mission Directorate (ESMD), NASA GSFC (2007).
- NASA, "Ares V Cargo Launch Ve- hicle", National Aeronautics and Space Administration, NASA Home>Mission Sec- tions>Constellation Program>Ares Launch Vehicles, Website: http://www.nasa.gov/mission_pages/ constellation/Ares/AresV.html, Viewed: November 14 (2007).
- Gershman, R., Conceptual Design of a Europa Lander Mission, Jet Pro- pulsion Laboratory, California Insti- tute of Technology (1998).
- Noca, M., Bailey, R.W., Titan Ex- plorer mission trades from the per- spective of aerocapture, AIAA-2003- 4801, Joint Propulsion Conference, Huntsville, AL, July 20-23 (2003).
- Razzaghi, A.I., Enceladus Flagship Mission Concept Study, Prepared for NASA's Planetary Sciences Divi- sion, Performed at NASA GSFC, Fi- nal Report posted on the OPAG website: http://www.lpi.usra.edu/opag/announ cements.html , August 29 (2007).
- Lockwood, M. K., Titan Aerocapture Systems Analysis, Prepared by NASA Langley Research Center, AIAA 2003-4799, 39th AI- AA/ASME/SAE/ASEE Joint Propul- sion Conference and Exhibit, Hunts- ville, AL., 20-23 July (2003).
- Lockwood, M. K., Neptune Aerocap- ture Systems Analysis, NASA Lang- ley Research Center, Hampton, Vir- ginia, participation from ARC, JPL, JSC, LaRC and MSFC (2004).
- Reh, K. R. et al., Titan and Encela- dus $1B Mission Feasibility Study, Prepared for NASA's Planetary Sci- ences Division, Performed at JPL, Final Report JPL D-37401B, cleared for external release and posted on the OPAG website: http://www.lpi.usra.edu/opag/announ cements.html as "$1B Box Studies," January 30 (2007).
- Woodcock, G., Ares Report, Pre- pared for David B. Smith (Boeing Company), PowerPoint presentation, December 13 (2007).
- Leary, J. C. et al., Titan Explorer Flagship Mission Study, Prepared for NASA's Planetary Sciences Divi- sion, Performed at JHU-APL, Final Report posted on the OPAG website: http://www.lpi.usra.edu/opag/announ cements.html , August 29 (2007).
- Clark, K. B. et al., Europa Explorer Mission Study, Prepared for NASA's Planetary Sciences Division, Per- formed at JPL, Final Report JPL D- 41283, cleared for external release and posted on the OPAG website: http://www.lpi.usra.edu/opag/announ cements.html, November 01 (2007).
- Vane, G., Non-Fission Jovian Icy Moon Tour Study: The Dual Cruiser Mission to the Galilean Satellites, JPL internal document, January 27 (2003).