Academia.eduAcademia.edu

Outline

Genetic Algorithm for Disassembly Process Planning

2002, Proceedings of SPIE

https://doi.org/10.1117/12.455264

Abstract

When a product reaches its end of life, there are several options available for processing it including reuse, remanufacturing, recycling, and disposing (the least desirable option). In almost all cases, a certain level of disassembly may be necessary. Thus, finding an ...

References (20)

  1. Bierwirth C. , Mattfeld D. C., and Kopfer H., "On permutation representations for scheduling problems," in Parallel Problem Solving from Nature --PPSN IV, H.-M. Voigt, W. Ebeling, I. Rechenberg, and H.-P. Schwefel, eds., vol. 1141 of Lecture Notes in Computer Science, pp. 3 10-3 18, Springer-Verlag, Berlin, Germany, 1996.
  2. Bierwirth C. and Mattfeld D. C., Production scheduling and rescheduling with genetic algorithms, Evolutionary Computation, 7(1): 1-18, 1999.
  3. Blanton, J. L. and Wainwright, R. L., Multiple vehicle routing with time and capacity constraints using genetic algorithms. In Forrest, S., editor, Proceedings of the Fijlh International Conference on Genetic Algorithms, pages 452- 459, Morgan Kaufmann, San Mateo, California, 1993.
  4. Gungor, A. and Gupta, S. M., "Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey", Computers and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
  5. Kuo T.C., "Disassembly Sequence and Cost Analysis for Electromechanical Products", Robotics and Computer IntegratedManufacturing, Vol. 16, No. 1,43-54, 2000.
  6. Lazzerini B., Marcelloni F., "A genetic algorithm for generating optimal assembly plans", Artijkial Intelligence in Engineering, Vol. 14,319-329,2000.
  7. Lee, D.-H., Kang, J.-G. and Xirouchakis, P., "Disassembly Planning and Scheduling: Review and Further Research", Journal ofEngineering Manufacture, Vol. 215, No. B5,695-709, 2001
  8. Loughlin D. H., Ranjithan S., The neighborhood constraint-method: A genetic algorithm-based multiobjective optimization technique, Proceedings of the Seventh International Conference on Genetic Algorithms, 666-673,1997.
  9. Michalewicz, Z., "Genetic Algorithms + Data Structures = Evolution Programs", 3rd edition, Springer-Verlag, Berlin, 1996.
  10. Moore, K. E., Gungor, A. and Gupta, S. M., "Petri Net Approach to Disassembly Process Planning for Products with Complex AND/OR Precedence Relationships", European Journal of Operational Research, Vol. 135, No. 2, 189-210, 2001.
  11. Moyer, L. K. and Gupta, S. M., "Environmental concerns and Recycling/Disassembly Efforts in the electronic industry", Journal of Electronics Manufacturing, 7(1), 1-22, 1997.
  12. Onwubolu G. C., and Mutingi, M., "Optimizing the multiple constrained resources product mix problem using genetic algorithms", International Journal of Production Research, 39(9), 1897-1910,2001.
  13. Ritchey J., Mahmoodi F., Frascatore M., Zander A, "Assessing the Technical and Economic Feasibility of Remanufacturing", Proceedings of the Twerfth Annual Conference of the Production and Operations Management Society, POM-2001, March 30-April2, Orlando, FL, 2001.
  14. Sanderson A. C., Homem de Mello L. S., Zhang H., "Assembly sequence planning", AIMagazine, Spring 1990, 62-81, 1990.
  15. Seo K.-K., Park J.-H. and Jang D . 4 , "Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects", International Journal of Advanced Manufacturing Technology, Vol. 18, 37 1- 380, 2001.
  16. Taleb, K. and Gupta, S. M., "Disassembly of Multiple Product Structures", Computers and Industrial Engineering, Vol.
  17. Tang, Y., Zhou, M., Zussman, E., and Caudill, R., "Disassembly Modeling, Planning, and Application: A Review", Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, California, April,
  18. Valenzuela-Rendon M, Uresti-Charre E., "A non-generational genetic algorithm for multiobjective optimization" Proceedings of the Seventh International Conference on Genetic Algorithms, 658-665, 1997.
  19. Veerakamolmal, P., Gupta, S. M. and McLean C. R, "Disassembly Process Planning", Proceedings of the First Int Conference on Engineering Design andAutomation, Bangkok, Thailand, 162-165, March 18-21, 1997.
  20. Wong L., "Barriers to implementation of electronic end of life product programs in the U.S., Investigating the Environment: Research for Environmental Management, Compilation of Research Reports jFom the Fall 2OOO/Spring 2001 Senior Research Seminars, Environmental Sciences Group Major, University of California at Berkeley, Berkeley, 32, NO. 4, 949-961, 1997. pp. 2197-2202,2000. California, May 200 1.