Risk Management in Construction Projects

2012

https://doi.org/10.18178/JOAMS.6.2.113-116

Abstract

Risk is involved in any construction projects. Management of risk is the key for a successful project. Risk management is useful for both client and contractor. Risk management goes into three main processes and they are; Risk identification, Risk assessment and Risk response. Implementation of the process of risk management before the start of any phase of the project will lead to less impact on cost, time and quality of the project. Project risk mitigation will reduce dispute between the contractor and the client as well reduce the risk for both contractor and client. Therefore, a well-prepared contract can list all risks associated with a project and assign suitable mitigation for these risks. The objective of this paper to identify all risks that the contractor or client may face during the execution of a project. The risks will be identified and analyzed based on experience and necessary mitigation for the identified risks will be presented. In this paper, project risks are classified into three categories based on project phases which are FEED and tendering risk, execution risk and commissioning and operation risk. All the major risks under each category are identified, assessed and mitigations assigned to each of the risks. It should be emphasized that risk management is an excellent tool to manage the risk in each phase of a project. Applying the risk management technique on projects will enhance project performance and efficiency in terms of cost, time and quality for both the client and contractor.

References (8)

  1. A. S. Akintoye and M. J. MacLeod, "Risk analysis and management in construction," International Journal of Project Management, vol. 15, no.1, pp. 31-38, 1997.
  2. M. Schieg, "Risk management in construction project management," Journal of Business Economics and Management, vol. vii, no. 2, pp.77-83, 2006.
  3. S. K. Kamane and S. A. Mahadik, "Risk management in construction industry," IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), pp.59-65.
  4. N. Ehsan, E. Mirza, M. Alam, and A. Ishaque, "Risk management in construction industry," IEEE, 2010.
  5. J. Tamosaitiene, E. Kazimieras, and Z. Turskis, "Multi-criteria risk assessment of a construction project," Vilnius Gediminas Technical University, Department of Construction Technology and Management, Sauletekio Ave. 11, LT-10223, pp. 129-133, 2013.
  6. S. H. A. Kalkhoran, G. Liravi, and F. Rezagholi, "Risk management in construction projects," International Journal of Engineering Trends and Technology (IJETT), vol. 10, no. 3, 2014.
  7. A. Dziadosz and M. Rejment, "Risk analysis in construction project -chosen methods," 15 th German-Lithuanian-Polish Colloquium (ORSDCE 2015), pp. 258-265, 2015.
  8. K. Mhetre, B. A. Konnur, and A. B. Landage, "Risk management in construction industry," International Journal of Engineering Research, vol. no. 5, pp. 153-155, 2016.