The Challenge of Configuring Model-Based Space Mission Planners
2011
Abstract
Mission planning is central to space mission operations and has benefited from advances in model-based planning software, but developing a planning model still remains a difficult task. Mission planning constraints arise from many sources, including simulators and engineering specification documents. Ensuring that these constraints are correctly represented in the planner’s model is a challenge. As mission constraints evolve, planning domain modelers must add and update model constraints efficiently using the available source data, catching errors quickly, and correcting the model. We describe the current state of the practice in designing model-based mission planning tools and the challenges facing model developers. We then propose an Interactive Model Development Environment (IMDE) to configure mission planning systems by integrating modeling and simulation environments to reduce model editing time, generate simulations automatically to evaluate plans, and identify modeling errors...
References (26)
- Aghevli, A., Bachmann, A., Bresina, J.L., Greene, J., Kanefsky, R., Kurien, J.,McCurdy, M., Morris, P.H., Pyrzak, G., Ratterman, C., Vera, A., Wragg. S., Planning Applications for Three Mars Missions. Proceedings of the International Workshop on Planning and Scheduling for Space. Baltimore, MD, 2007.
- Barltrop, K., Clement, B., Horvath, G., and Lee, C. Automated Test Case Selection for Flight Systems using Genetic Algorithms. Proceedings of the AIAA Infotech@Aerospace Conference, 2010.
- Barreiro, B., Chachere, J., Frank, J., Bertels C., and Crocker A. Constraint and Flight Rule Management for Space Mission Operations. International Symposium on Artificial Intelligence, Robotics, and Automation in Space, 2010.
- Barrett, A., Bass, D., Laubach, S., and Mishkin, A. A Retrospective Snapshot of the Planning Processes in MER Operations After 5 Years. In Proceedings of the International Workshop on Planning and Scheduling for Space. 2009.
- Barrett, A. and Dvorak, D. A Combinatorial Test Suite Generator for Gray-Box Testing, IEEE SMC-IT 2009.
- Bell, S., Kortenkamp, D., and Zaientz, J. A Data Abstraction Architecture for Mission Operations. In Proc. of the International Symposium on AI, Robotics, and Automation in Space, 2010.
- Boddy, M., Carpenter, T., Shackleton, H., Nelson, K. System- Level Autonomy Trust Enabler (SLATE), In Proc. of the U.S. Air Force T&E Days, AIAA, Los Angeles, CA, Feb, 2008.
- Brat, G., Gheorghiu, M, , Giannakopoulou, D., "Verification of Plans and Procedures," In Proc. of IEEE Aerospace Conf., 2008.
- Bresina, J., Jónsson, A., Morris, P., and Rajan, K. 2005. Activity planning for the Mars Exploration Rovers. In Proceedings of the 15th International Conference on Automated Planning and Scheduling, Monterey CA, USA, June 5-10, 2005, S. Biundo, K. Myers, K. Rajan, Eds. AAAI, Menlo Park, CA., USA 40-49.
- Carraway, J., Squibb, G., Larson, W. Mission Operations. In Wetz, J. and Larsen, W. Space Mission Analysis and Design (3d edition). Microcosm Press, El Segundo, CA, p. 587-620, 1999.
- Cesta, A., Finzi, A., Fratini, S., Orlandini, A., Tronci, E. Validation and Verification Issues in a Timeline-Based Planning System. Knowledge Engineering Review, 25(3): 299-318, 2010.
- S. Chien, R. Sherwood, D. Tran, B. Cichy, G. Rabideau, R. Castano, A. Davies, D. Mandl, S. Frye, B. Trout, S. Shulman, and D. Boyer. Using Autonomy Flight Software to Improve Science Return on Earth Observing One. Journal of Aerospace Computing, Information, and Communication, 2005.
- Chien, S. A. Static and Completion Analysis for Planning Knowledge Base Development and Verification. In Proc. of 3 rd Int'l Conf. on Artificial Intelligence Planning Systems. 1996. Cichy, B., Chien, S., Schaffer, S., Tran, D., Rabideau, G., Sherwood, R. Validating the Autonomous EO-1 Science Agent In: Int'l Workshop on Planning and Scheduling for Space. 2004. Clement, B., Durfee, E., Barrett, A. Abstract Reasoning for Planning and Coordination. Journal of Artificial Intelligence Research, vol. 28, 453-515, 2007.
- Clement, B. and Johnston. M., The Deep Space Network Scheduling Problem. In Proceedings of the 17 th Innovative Applications of Artificial Intelligence Conference, 2005. Cresswell, S., McCluskey, T. L., and West, M. M. Acquiring planning domain models using LOCM. Knowledge Engineering Review, 2012, to appear. desJardins, M. Knowledge Development Methods for Planning Systems. In Proceedings of the AAAI Fall Symposium on Planning and Learning, New Orleans, 1994.
- Fox, M. & Long, D. PDDL2.1: An extension of PDDL for expressing temporal planning domains, Journal of Artificial Intelligence Research 20, 61-124, 2003.
- Garcia, G., Barnoy, A., Beech, T., Saylor, R., Cosgrove, J., Ritter, S. Mission Planning and Scheduling for NASA's Lunar Reconnaisance Orbiter. In Proceedings of the Ground Systems Automation Workshop, 2009.
- Howey, R. and Long, D. and Fox, M. VAL: automatic plan validation, continuous effects and mixed initiative planning using PDDL. In Proc. ICTAI. pp. 15-17, Nov 2004.
- Izygon, M., Kortenkamp, D., Molin, A., "A Procedure Integrated Development Environment for Future Spacecraft and Habitats," Space Technology and Applications International Forum, 2008.
- Knight, R., Chouinard, C., Jones, G., and Tran, D. Planning and Scheduling Challenges for Orbital Express. In Proceedings of the Inte'l Workshop on Planning and Scheduling for Space. 2009.
- Ko, A., Maldague, P., Page, D., Bixler, J., Lever, S., and Cheung, K. M. Design and Architecture of Planning and Sequence System for Mars Exploration Rover (MER) Operations. In Proceedings of the AIAA Space Conference. 2004.
- Long, D., Fox, M., and Howey, R. Planning Domains and Plans: Validation, Verification and Analysis. In Proc. Workshop on V&V of Planning and Scheduling Systems, 2009.
- Raimondi, F., Pecheur, C., and Brat, G. PDVer, a Tool to Verify PDDL Planning Domains. In Proc. Workshop on Verification and Validation of Planning and Scheduling Systems, ICAPS, 2009.
- Reddy, S., Frank, J., Iatauro, M., Boyce, M., Kurklu, E., Ai Chang, M., Jonsson, A. Planning Solar Array Operations on the International Space Station. Special Issue on Applications of Automated Planning, ACM Transactions on Intelligent Systems and Technology, 2011.
- Tompkins, P.D., Hunt, R., D'Ortenzio, M., Strong, J., Galal, K., Bresina, J., Foreman, D., Barber, R., Munger, J., and Drucker, E. Flight Operations for the LCROSS Lunar Impactor Mission. In Proceedings of AIAA Space Conference(SpaceOps) 2010.
- Vaquero, T., Romero, V., Sette, F., Tonidandel, F., Reinaldo Silva, J. ItSimple 2.0: An Integrated Tool for Designing Planning Domains. In Proceedings of the Workshop on Knowledge Engineering for Planning and Scheduling, 2007.
- Yen, J., Cooper, B., Hartman, F., Maxwell, S., Wright, J., Leger, C. Physical Based Simulation for Mars Exploration Rover Tactical Sequencing. In Proceedings of the IEEE Conference on Space Mission Challenges, 2005