PERE: Evaluation and Improvement of Dependable Processes
1996
https://doi.org/10.1007/978-1-4471-0937-2_28Abstract
Abstract In the development of systems that have to be dependable, weaknesses in the requirements engineering (RE) process are highly undesirable. Such weaknesses may either introduce undetected system weaknesses, or otherwise significant costs may arise in their correction later in the development process. Typically, the RE process contains a number of individual and group activities and thus is particularly subject to weaknesses arising from human factors.
References (27)
- Viller, S., Emmet, L., Bowers, J., Bloomfield, R. (1996) PERE: A Method for Requirements Process Dependability, Submitted to IEEE Symposium on Requirements Engineering-RE'97, 5-8th January 1997, Annapolis MD (also available as technical report CSEG/4/96, from Cooperative Systems Engineering Group, Computing Department, Lancaster University).
- Kletz, T.A., Hazop and Hazan-Identifying and Assessing Process Industry Hazards. Institution of Chemical Engineers, Rugby, UK, 1992.
- Kletz, T., Chung, P., Broomfield, E. and Shen-Orr, C., Computer Control and Human Error. Institution of Chemical Engineers, Rugby, 1995.
- McDermid, J.A. and Pumfrey, D.J., A development of hazard analysis to aid software design. In: Proceedings of COMPASS'94 (Gaithersburg, MD, 1994) IEEE Computer Society Press.
- Paulk, M.C., Curtis, B., Chrissis, M.B. and Weber, C.V., Capability maturity model, version 1.1. IEEE Software 10, 4 (1993) pp. 18-27.
- Bootstrap Project Team, Bootstrap: Europe's assessment method. IEEE Software 10, 2 (1993) pp. 93-95.
- 3 http://www.comp.lancs.ac.uk/computing/research/cseg/projects/reaims/ This paper appeared in the proceedings of Safecomp 96 -E Schoitsch (ed) The 15th International Conference on Computer Safety, Reliability and Security, Vienna , Springer Verlag 1996. 10
- Huyink, D. and Westover, C., ISO 9000. Irwin Professional Publishing, New York, 1994.
- Bowers, J. and Pycock, J., Talking through design: requirements and resistance in cooperative prototyping. In: Proceedings of CHI'94 (Boston, MA, 1994) ACM Press, pp. 299-305.
- Goguen, J.A., Social issues in requirements engineering. In: Proceedings of RE'93 (San Diego, CA, 1993) IEEE, pp. 194-195.
- Quintas, P., Ed., Social Dimensions of System Engineering: People, Processes, Policies and Software Development. Ellis Horwood, London, 1993.
- Westrum, R., Technologies and Society: The Shaping of People and Things. Wadsworth Publishing Company, Belmont, CA, 1991.
- Bowers, J., Viller, S. and Rodden, T., Human Factors in Requirements Engineering, REAIMS Deliverable D1.2, REAIMS/WP1.2/LU004, Lancaster University, 29th August 1994.
- Reason, J., Human Error. Cambridge University Press, Cambridge, UK, 1990.
- Rasmussen, J., Skills, rules, knowledge; signals, signs and symbols; and other distinctions in human performance models. IEEE Transactions on Systems, Man and Cybernetics SMC-13, 3
- Manstead, A.S.R. and Semin, G.R., Social facilitation effects: mere enhancement of dominant responses? British Journal of Social and Clinical Psychology 19, (1980) pp. 119-136.
- Steiner, I.D., Task-performing groups. In: Contemporary Topics in Social Psychology Thibaut, J.W., Spence, J.T. and Carson, R.C., Ed., General Learning Press, Morristown, NJ, 1976.
- Hemphill, J.K., Why people attempt to lead. In: Leadership and Interpersonal Behaviour Petrullo, L. and Bass, B.M., Ed., Holt, Rinehart & Winston, New York, 1961.
- Van Avermaet, E., Social influence in small groups. In: Introduction to Social Psychology Hewstone, M., Stroebe, W., Codol, J.-P. and Stephenson, G.M., Ed., Basil Blackwell, Oxford, 1988, pp. 350-380.
- Maass, A. and Clark, R.D., Hidden impact of minorities-15 years of minority influence research. Psychological Bulletin 95, 3 (1984) pp. 428-450.
- Isenberg, D.J., Group polarization: a critical review and meta-analysis. Journal of Personality and Social Psychology 50, (1986) pp. 1141-1151.
- Janis, I.L., Victims of Groupthink. Houghton Mifflin, Boston, MA, 1972.
- Perrow, C., Normal Accidents. Basic Books, New York, 1984.
- Sagan, S.D., The Limits of Safety: Organizations, Accidents, and Nuclear Weapons. Princeton University Press, Princeton, NJ, 1993.
- La Porte, T.R. and Consolini, P.M., Working in practice but not in theory: theoretical challenges of 'high reliability organizations'. Journal of Public Administration Research and Theory 1, 1 (1991) pp. 19-47.
- Märtins, F., Schippers, H., Viller, S., Bowers, J. PERE: Process Evaluation in Requirements Engineering with special consideration of human factors, In: Design for Protecting the User, 13th Annual CSR Workshop, 11-13th September, Bürgenstock, Switzerland 1996
- Emmet, L. and Bloomfield, R. Application of PERE to the standards process; REAIMS Deliverable D5.2a, REAIMS/WP5/AD/W/103; Adelard; 1996