Meminimalkan Sisa Pemotongan Besi Beton dalam Proyek Konstruksi
2019, Jurnal Informatika Universitas Pamulang
Sign up for access to the world's latest research
Abstract
Construction industries are a must in developing countries. Constructions take part in almost every corner of the country. In construction projects, reinforced concrete plays big part in any construction. A long bar of steel are cut into be several lengths to satisfy the requirements of the buildings to be build. In this process, waste cannot be avoided. And the waste of steel bar is very destructive to environment. This research is to find a way to minimize the waste in the process of cutting steel bars. The algorithm used is Greedy Search. Greedy Search is where the optimized solution in every step is taken, in the hope that the overall solution will be optimized for the problem. Optimized solution here is the minimum waste by the steel bar cutting. This will minimize the cost by the construction companies and at the same time preserve the environment.
Related papers
JURNAL ILMIAH MATEMATIKA DAN TERAPAN, 2016
OPTIMALISASI PERENCANAAN BIAYA DISTRIBUSI BAHAN MATERIAL KERIKIL PECAH TERSARING SUATU PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE TRANSPORTASI (STUDI KASUS: REHABILITASI JALAN JABAL NUR, JALAN PATIMURA, DAN JALAN KAMBOJA KOTA PALU)
2020
Material merupakan salah satu komponen penting dalam pelaksanaan suatu proyek konstruksi dan pemakaiannya harus dikontrol dengan baik sehingga tidak banyak sisa-sisa material yang terbuang dan menumpuk. Untuk minimalisasi sisa material akan menguntungkan pihak kontraktor dan bisa mengurangi dampak lingkungan. Sisa material konstruksi banyak sekali jenisnya seperti sisa material bata, pasir, split, begesting, dll. Pada pekerjaan plesteran membutuhkan pasir yang sudah diayak sesuai saringan yang dibutuhkan dan akan didapatkan sisa material ayakan pasir yang berbentuk kerikil. Sisa material kerikil dari ayakan pasir apabila tidak digunakan akan menumpuk dan dapat mengganggu pada penempatan material lain apabila lahannya tidak cukup luas. Sisa kerikil dari ayakan pasir tersebut dapat dipakai sebagai agregat kasar pada campuran beton sehingga sisa material tersebut dapat dioptimalkan lagi. Tujuan penelitian ini adalah untuk mengkaji karakteristik beton dengan mengoptimalisasikan sisa ma...
Construction and Material Journal
One of the concrete technologies developed to obtain good compressive strength of concrete is additional material for iron lathe waste obtained from the residue of the iron turning process. This study aims to determine the effect of iron lathe waste as a fine aggregate additive on the compressive strength of concrete. The compressive strength test of concrete was carried out based on The SNI standard 1974:2011. The sample making of the specimens was carried out by varying 0%, 1.5% and 2.5% of iron lathe waste from the weight of fine aggregate in a concrete mixture with a concrete compressive strength of 29.05 MPa. Concrete samples were tested at the age of 7 days, 14 days, and 21 days. The test results show that the maximum compressive strength of concrete is achieved by normal concrete (0%) which is 28.96 MPa at the age of 21 days of concrete. While the value of the compressive strength of concrete after being given a mixture of iron lathe waste decreased. The optimum concrete comp...
Jurnal Standardisasi, 2006
Planning of technical regulation must be done taken carefully to avoid incidence of negative impact for growth of climate is effort and the healthy emulation. There is indication in market a lot of circulating product become militant bone of concrete disagree with standard. From survey of field as a whole mount accomplishment of sample become militant bone of concrete to conditions of SNI 07-2052-2002 still be very low (1,8 %) so that need correction of denoting of standard, technical regulation and its mechanism, observation of pre-market and market and distribution.
2020
Concrete is one of the construction components used in buildings, bridges, or roads. In this study, The authors learned to create concrete that is lighter than standard concrete, that is by using light cement with a weight of 0%, 10% 20%, 30%, 40% of the volume of sand and talc powder weighing 8% of the volume of cement. The strength targeted in this study is k-225. Meanwhile, this study's results are the value of concrete compressive strength, which is increased by the target set k-225 to be k-400 in one of the normal concrete samples and has an average of k-360. 10% 20%, 30%, 40% and 8% talc powder increase with each average yield of k-294, k271, k-251, and k-225. To check the absorption of concrete samples, check the average increase in immersion 1 hour 0.0016%, 4 hours 0.0027%, and 24 hours 0.0047%. For the results of testing the type of weight, from each variation of test specimens 1 5, the resolution decreases 2.26, 2.24, 2.23, 2.16, and 2.028. The one with the lowest spec...
BANGUNAN, 2021
Abstrak:High density concrete atau beton berat merupakan beton yang dihasilkan dari agregat yang mempunyai berat isi lebih besar dari berat beton normal. Beton yang mempunyai berat yang tinggi ini biasanya digunakan untuk kepentingan tertentu seperti menahan radiasi, menahan benturan dan lainnya. Untuk membuat beton tersebut diperlukan inovasi material yang berasal dari limbah, selain menghasilkan berat isi yang tinggi juga terciptanya beton ramah lingkungan. Tujuan penelitian ini, pembuatan beton ramah lingkungan kami beri nama BESARI (Beton Sisa Industri) dengan pembuatan beton SCC (Self Compacting Concrete) yang memanfaatkan limbah industri yaitu limbah steel slag dan granit sebagai pengganti agregat kasar, serbuk besi sebagai pengganti agregat halus, serta serbuk marmer sebagai filler dalam substitusi semen. Limbah yang kami gunakan didapatkan dari daerah sekitar Klaten dan Surakarta. Dengan menggunakan metode perencanaan American Concrete Instituted (ACI) dan standar EFNARC, pe...
Jurnal Riset Teknik Pertambangan
Coal mining at PT X Banko Barat site uses the Strip Mine type Open Mine System using mechanical equipment. To breaking coal from Pit 1 Timur using ripping with the Komatsu D 375 Bulldozer A. As for the digging and loading using Backhoe Komatsu PC 400 and Backhoe Hitachi ZX 470 Lc The problem with the company is the large size of the fragmentation of ripping coal which is greater than 20 cm which is not in accordance with the specifications of the grizzly dump hopper, so there must be a reduction in the size of the coal back by the backhoe so that production is getting lower. This study aims to optimize the ripping bulldozer space on coal so that it will produce coal fragmentation smaller than the actual ripping and the effect of coal fragmentation on bulldozer and backhoe production. The research included taking data of bulldozer cycle time ripping, backhoe cycle time, bulldozer obstacle time, backhoe obstacle time, coal density and coal fragmentation. From these data we will know the effect of bulldozer ripping spacing on the fragmentation of coal produced and the effect on bulldozer and backhoe production. For the East Pit coal production target, West Banko is 360,000 tons/ month. The actual bulldozer ripping space is 80 cm with B2 coal fragmentation yield of more than 20 cm is 11.36% with 363,476.74 tons/month ripping bulldozer and backhoe production 363,477.32 tons/month. For the 60 cm ripping spacing improvement, the B2 coal fragmentation yield of more than 20 cm is 3.05% with a bulldozer ripping production of 347,670.27 tons/month and backhoe production of 347,670.7 tons/month. As for the 40 cm ripping spacing improvement, B2 coal fragmentation which is more than 20 cm is 1.58% with a bulldozer ripping production of 288,922.03 tons / month and backhoe production of 288,922.9 tons/month. Based on the results of the study, coal fragmentation of more than 20 cm has reached the Company's SOP, which is less than 2%, but the production target has not been reached, so efforts must be made to improve. The improvement effort is by adding a bulldozer and increasing the bulldozer work efficiency. Bulldozer production was obtained at 385,229.37 tons/month and backhoe production at 385,229.60 tons/month so as to reach the production target.
Jurnal Rekayasa Infrastruktur Hexagon
Setiap bangunan maupun sarana prasarana lainnya harus diwujudkan dengan sebaik-baiknya sehingga mampu memenuhi secara optimal fungsi bangunannya, ekonomis, ramah terhadap perkembangan cuaca dan kondisi tektonik, dan dapat memenuhi kriteria teknis yang layak dari segi mutu, biaya, dan administrasi. Pemakaian baja sebagai bahan struktur memiliki kelebihan dan kekurangan, kerugian baja sebagai bahan sruktur adalah kebanyakan baja tidak tahan korosibila terbangun di udara luar, sehingga harus dilakukan optimasi dengan mengubah elemen struktur menjadi beton bertulang.Penelitian ini dilakukan untuk memperoleh gaya-gaya dalam yang bekerja pada penampang portal struktur baja untuk digunakan sebagai acuan dalam melakukan pendimensian struktur beton bertulang dengan metode praktis optimasi dimensi.Hasil dari analisis perhitungan pada kolom K1 IWF 350 x 175 x 7 x 11 didapatkan dimensi kolom 60 x 60 dengan luas tulangan 60,82 cm2 , pada kolom K2 IWF 300 x 150 x 6,5 x 9 didapatkan dimensi kolom 40 x 40 dengan luas tulangan 45,36 cm2, pada balok B1 IWF 300 x 150 x 6,5 x 9 didapatkan dimensi kolom 30 x 50 dengan luas tulangan 22,12 cm2, pada balok B2 IWF 200 x 100 x 5,5 x 8 didapatkan dimensi kolom 25 x 30 dengan luas tulangan 18,10 cm2.
Technologic
Penelitian ini membahas analisis faktor penyebab sisa material pekerjaan struktur pada proyek konstruksi menggunakan program SPSS. Sebelum melakukan analisis, dilakukan pengujian uji normalitas, validitas, dan hasil uji reliabilitas. Dari hasil uji normalitas didapatkan bahwa Sig. < 0,05 sehingga penelitian ini menggunakan statistika non parametrik yang metodenya adalah Rank Spearman dan Kendall. Pada uji validitas, didapatkan bahwa semua variabel yang ditinjau lebih besar daripada 0,316 dan pada uji reliabilitas, nilai Cronbach Alpha dari semua variabel lebih besar daripada 0,6. Hal ini menunjukkan variabel-variabel yang digunakan valid dan reliable. Kemudian, untuk korelasi penyebab dan persentase material digunakan Uji Korelasi Rank Spearman dan didapatkan bahwa metode pekerjaan kayu bekisting adalah cukup berpengaruh terhadap sisa material karena nilai korelasi sebesar 0,406. Selanjutnya untuk persentase pekerjaan bekisting, material sisa dengan persentase terbesar adalah pak...

Loading Preview
Sorry, preview is currently unavailable. You can download the paper by clicking the button above.
References (8)
- Abuhassan, I. A. O., & Nasereddin, H. H. O. (2011). Cutting Stock Problem : Solution Behaviors. 6(4), 429-433. Retrieved from https://www.researchgate.net/publication/28 1120697_CUTTING_STOCK_PROBLEM_ SOLUTION_BEHAVIORS
- Brualdi, R. A. (2010). Introductory
- Combinatorics. In Pearson Education, Inc. https://doi.org/10.2307/2320280
- Feo, T. A., & Resende, M. G. C. (1995). Greedy Randomized Adaptive Search Procedures. Journal of Global Optimization, 6(2), 109- 134. https://doi.org/10.1007/BF01096763
- Guichard, D. (2018). An Introduction to Combinatorics and Graph. Creative Commons.
- Kirch-prinz, U., & Prinz, P. (2002). A Complete Guide to Programming in C++ (1st ed.). Sudbury, MA: Jones And Bartlett Publishers.
- Malik, A., Sharma, A., & Saroha, V. (2013). Greedy Algorithm. International Journal of Scientific and Research Publications, 3(8), 1-4. Retrieved from http://xlinux.nist.gov/dads//HTML/greedyalg o.html
- Subhadra, A. (2016). Greedy Algorithms: