Academia.eduAcademia.edu

Outline

Nominal Cycle and Options

2016

https://doi.org/10.5170/CERN-2015-002.111

Abstract

During Run 2 the LHC operation will be based on the experience gained in Run 1. However the LHC will be operated near to its design energy. Many operational configurations can be considered to improve efficiency and reduce the impact of the longer time required by each operational phase. The expected changes in the magnetic model and the impact of the data updates with the corrections calculated during LS1 are presented together with a general overview of the operational cycle, including time, challenges and possible improvements of each phase.

References (6)

  1. Aquilina.N. et al."The FiDeL model at 7 TeV" CERNACC20140092
  2. Aquilina N. "Expected and measured behaviour of the tune in the LHC operation at 3.5 TeV" CERN-ATS- 2012-196
  3. Aquilina N. et al "The Magnetic Field Model of the Large Hadron Collider: Overview of Operation at 3.5 and 4 TeV" CERN-ATS-2012-195
  4. L.Bottura et al. "Pre-cycles of the LHC magnets during operation" CERN/ATS 2010-174
  5. M.Giovannozzi "Optics options for the 2015 LHC run", these proceedings.
  6. J.Wenninger et al. "The LHC nominal cycle, precycle and variations in 2015" 5 th Proceedings of the 5 th Evian workshop pp. 43-48