Protocols for Power System Automation
2021, Asian journal of applied science and technology
https://doi.org/10.38177/AJAST.2021.5213Abstract
AI
AI
The paper discusses the protocols for automating power substations, emphasizing the need for interoperability among various Intelligent Electronic Devices (IEDs) utilized in power systems. Various protocols such as Modbus, DNP3, and IEC 60870 are analyzed for their functionalities and limitations in the context of power distribution reliability. The paper highlights the development of communication standards, particularly IEC 61850, aimed at enhancing the compatibility and efficiency of automation processes within substations.
References (15)
- IEC61850: "Communication network and system in substation", Part1, August 2003.
- K.N Clinard "Comparison of IEC 61850 and UCA 2.0 data models" in Proceedings of IEEE Power Engineering Society Summer Meeting, Volume 1, July 21-25, 2002, pp.289-290.
- Holger Schubert and Gordon Wong, "IEC 61850-The way to seamless communication in substation", in Proceedings of 3 rd IASTED International Conference on Power and Energy System, Sep. 3-5, 2003, pp. 252-256. ISSN: 2456-883X
- IEC 61850: "Basic communication structure for substation and feeder equipment"-Compatible logical node classes IEC 61850-7-4.
- IEC 61850: "Basic communication structure for substation and feeder equipment"-Common data classes IEC61850-7-3.
- Shephard, M. C Janssen, H. Schubert "Standard communication in substation", in Proceedings of the Seventh International Conference on Power System, April 9-12, 2001, pp.270-274.
- R.P Gupta and N. Srivastava, "Substation automation communication protocol" in Proceedings of ICSCI 2004
- R.P Gupta, M. Pandey and N. Srivastava, "Data communication architecture using IEC 61850 protocol for substation automation" in Proceedings of International Conference on Distribution India, April 15-16, 2004, pp. 113-121.
- Eric Duren, Steven Kinsman, Dave Dolezilek, "Significant substation communication standardization developments", in Proceedings of the 2 nd Annual Western Power Delivery Automation Conference, Spokane, WA, April 4-6, 2000.
- Manufacturing messaging specification: "ISO 9506-1 & 2:2003"; Part 1-Service Definition: Part 2-Protocol Specification.
- IEC 61850 "Communication networks and systems and substations".
- IEC 61850-7-4 "Communication networks and systems in substations"-Part 7-4: Basic Communication structure for substation and feeder equipment -Compatible Logical Node Classes and Data Classes".
- IEC 61850-7-3 "Communication networks and systems in substations"-Part 7-3: Basic Communication structure for substation and feeder equipment -Common Data Classes".
- IEC 61850-5 "Communication networks and systems in substations"-Part 5: Communication Requirements for function and device models.
- K.P Brand et al., "Conformance testing guidelines for communication in substations", Cigre Report 34-01-Ref. No.180, August 2002.